12.07.2015 Views

ERTMS / ETCS Braking Curves - UIC

ERTMS / ETCS Braking Curves - UIC

ERTMS / ETCS Braking Curves - UIC

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Safety margins (2)The facts:Harmonised safety margin work ongoing in B126.15. Based on actualsafety margins used in existing systems. Results not available in timefor SRS300.Relation between performance requirements and safety requirementscan vary between the different railways, specifically in the case of anexisting line with level 1 overlay.The short term solution for SRS300:Implement the safety margins as a national value which can be sentto the train from trackside. This is a temporary solution, to besuperseded by the harmonised safety margin as soon as it becomesavailable.15 - 17 December 2004 <strong>UIC</strong> <strong>ERTMS</strong> Conference Rome 14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!