12.07.2015 Views

RDSO's report no. TFC-77 (January 2002) of the ... - eLocoS

RDSO's report no. TFC-77 (January 2002) of the ... - eLocoS

RDSO's report no. TFC-77 (January 2002) of the ... - eLocoS

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

VI)' Running <strong>of</strong> 58 Box 'N' rake should be closely monitored during <strong>the</strong> rainy.season as <strong>the</strong> gross weight (~C+2=484LI T) <strong>of</strong> <strong>the</strong> train is expected to increaseby about 1 to 2T pet wclgon due to accumulation/absorption <strong>of</strong> water in coalload, fur<strong>the</strong>r worsened by loss in adhesion.For <strong>the</strong> purpose <strong>of</strong> present study, it was decided that as a sample case, Bilaspur Divisionshould be taken up again Jor in-depth study to see <strong>the</strong> trends <strong>of</strong> stalling cases over <strong>the</strong>years & steps taken for reduction in stalling <strong>of</strong> freight trains as this Division has gotpredominant gradients <strong>of</strong> 1 in 100 to 1 in 250 in its jurisdiction. In depth analysis <strong>of</strong> KhurdaRoad Division, which is predominantly die~el traction, has also been carried out.4.0 Study <strong>of</strong> Bilaspur Division <strong>of</strong> South Eastern Railway:Bilaspur Division is <strong>the</strong> major Coal loading division <strong>of</strong> Indian Railways. Coal is beingloaded mainly from three areas Le. Korba. Chirimiri - Tigerhill-Bisrampur area and BRJNarea. Maximum numbers <strong>of</strong> coal rakes are loaded in Korba area. Loaded BOXN rakes (onaverage 10 rakes per day) are also received at Jharsuguda point <strong>of</strong>- Chakradharpurdivision. Area is rich in minerals with number <strong>of</strong> coal sidings, steel plants, and cementplants situated in <strong>the</strong> area. Part <strong>of</strong> <strong>the</strong> division Le. main line lies on one <strong>of</strong> <strong>the</strong> diagonal <strong>of</strong>Golden quadrilateral routes Le. Mumbai to Howrah line.A team <strong>of</strong> <strong>of</strong>ficers from RDSO visited Bilaspur division for in-depth study <strong>of</strong> stalling <strong>of</strong>freight trains and operating practices <strong>of</strong> running <strong>of</strong> freight trains. Team had detaileddiscussions with divisional <strong>of</strong>ficers including DRM and staff associated with running <strong>of</strong>trains.Belpahar (BPH)-Dagora (DAO) Section: This section has (1 in 100) gradient and in bothdirection banker is being provided which is attached and detached at Raigarh. In rainyseason banker is extended up to BEF if <strong>the</strong> train is started from loop line <strong>of</strong> Raigarh.GIG Section: I •IIBilaspur-Anuppur section: In Khongsara (KGS)-Khodri (KQI) section, which has 1 in 100gradient, banker is used up to Pendra Road station. 58 BOXN loads are cleared ei<strong>the</strong>rwith multiple WAGS or single WAG7 or multiple WAG7. In case <strong>of</strong> single WAG7 andmultiple WAGS, banker Is required which ar~lnvWlably <strong>no</strong>w WAG7- earlier WAGS locoswere used for banking with which soni'e 3talling cases were <strong>report</strong>ed. Now with WAG7banker <strong>no</strong> -stalling is occurring. In case <strong>of</strong> multiple WAG7 Le. two WAG7 <strong>no</strong> banker isrequired as <strong>the</strong>re is sufficient' power for clearing <strong>the</strong> gradients <strong>of</strong> 1 in 100. Normallymultiple WAG7 loco rakes are allowed to run· up to Anuppur only and <strong>the</strong>n <strong>the</strong>y areintercepted.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!