12.07.2015 Views

RDSO's report no. TFC-77 (January 2002) of the ... - eLocoS

RDSO's report no. TFC-77 (January 2002) of the ... - eLocoS

RDSO's report no. TFC-77 (January 2002) of the ... - eLocoS

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

i) Improvement in enginemanship;ii) Availability <strong>of</strong> working sanding gears;iii) Use <strong>of</strong> WAG7 (in place <strong>of</strong> WAGS) as banker;iv) Use <strong>of</strong> dynamic braking;Rosawhile examining <strong>the</strong> problem from a technical point <strong>of</strong> view feels that <strong>the</strong> earlier loadtables issued were inadequate because <strong>the</strong>y were based on <strong>the</strong> following conditions:i) Fair wea<strong>the</strong>r conditions i.e. dry rail conditions,ii)Tangent track Le. straight track without any curvature,iii) Adhesions values - taken corresponding to standard track conditions,Iiv) Track maintained to standard conditions.Besides this, in case <strong>of</strong> BaXN wagon loading is permitted up to CC+2 t; <strong>the</strong>refore load <strong>of</strong> 58BOXN rake is being considered as 4850 t as against existing 4700 t. Hence revised loadtables have been issued for both diesel and electric locos.The cost implications however, for following <strong>the</strong> revised load tables will be high. S.E.Railwayvide <strong>the</strong>ir letter No. 48/4 dated 7.3.2001 has asked for additional 130 electric and 40 diesellocos for following <strong>the</strong> existing ROSa load tables. The same may fur<strong>the</strong>r increase if revisedload tables are used. Average additional loco cost is Rs. 3.75 ~rores and homing sheds forabout 100 locos will cost a<strong>no</strong><strong>the</strong>r Rs. 10 crores.Besides this, we should also take into consideration <strong>the</strong> cost <strong>of</strong> streng<strong>the</strong>ning <strong>of</strong> bridges on<strong>the</strong> section, as double-headed operation is <strong>no</strong>t permitted on certain BGML spans. Theapproximate.cost l cti streng<strong>the</strong>ninQ n~~ 8r.11 pf ~5.7 m BGML girder brid~e as per ROSa'sspecifications has been worked out as Rs. 12.50 lakhs.These additional costs might <strong>no</strong>t commensurate with <strong>the</strong> advantages gained except inreducing <strong>the</strong> cases <strong>of</strong> rail burns (extra cost incurred on Bilaspur division during <strong>the</strong> last 4 .years in replacing burnt and scabbed rails is rough~ ·Rs. 14:4~Ocrores) a~dincreasing line

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!