12.07.2015 Views

Micropile Installation with Spoil Control at Logan Airport - Nicholson ...

Micropile Installation with Spoil Control at Logan Airport - Nicholson ...

Micropile Installation with Spoil Control at Logan Airport - Nicholson ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Project ChallengesThe <strong>Logan</strong> <strong>Airport</strong> job provided many challenges th<strong>at</strong> can be divided into two groups: i)coordin<strong>at</strong>ion of trades working <strong>with</strong>in difficult access and while trying to maintain garageoper<strong>at</strong>ions; and ii) unexpected surprises.The Construction Manager made significant effort to facilit<strong>at</strong>e the work activities of thevarious trades by having daily coordin<strong>at</strong>ion meetings. These meetings were very helpful,however, inevitably there were conflicts rel<strong>at</strong>ed to scheduling access to various portionsof the site such th<strong>at</strong> trades could not work optimally. As is generally the case during thenegoti<strong>at</strong>ion stages of a project, concerns for these types of conflicts and inefficiencies fallon deaf ears and there is over-optimism regarding the coordin<strong>at</strong>ion th<strong>at</strong> is possible.A significant challenge encountered was the presence of diabase dikes th<strong>at</strong> were notidentified in the subsurface explor<strong>at</strong>ion. These dikes were especially troublesomebecause of the external flush "lost bit" drilling technique employed. The lost bits are infact used roller bits from the oil industry. The use of these used bits is necessary becauseof the very high cost of new bits when considering a single use applic<strong>at</strong>ion. For thefounding m<strong>at</strong>erials expected to be encountered, namely argillite and glacial till, the usedbits were more than adequ<strong>at</strong>e. However, when the diabase was encountered install<strong>at</strong>ionoper<strong>at</strong>ions slowed dram<strong>at</strong>ically wherein pile install<strong>at</strong>ion went from taking about six hoursper pile, to taking 3 to 5 days per pile. The use of down-hole percussion hammers wouldhave penetr<strong>at</strong>ed much faster, but the confined space conditions, existing site layout, theuncertainty of the number of piles possibly effected by the diabase, and changes neededto support oper<strong>at</strong>ions made this option a last resort.Another impediment to production was the presence of utilities <strong>at</strong> unknown loc<strong>at</strong>ions,which is a very common occurrence on urban construction sites. The time necessary toidentify the extent of the utilities, their owner, and to negoti<strong>at</strong>e a plan for their movementor development of a found<strong>at</strong>ion retrofit is often substantial. Importantly, money for theseactivities is never budgeted and therefore there is always haggling over wh<strong>at</strong> constitutesfair compens<strong>at</strong>ion; <strong>with</strong> ultim<strong>at</strong>ely no one feeling like they were tre<strong>at</strong>ed fairly.SummaryThis paper provided an overview of micropile install<strong>at</strong>ion oper<strong>at</strong>ions to support anexpansion to the Central Parking Garage <strong>at</strong> <strong>Logan</strong> <strong>Airport</strong>. Topics discussed included:1. The re-design of the found<strong>at</strong>ion system to make use of micropiles in place ofdrilled shafts. The redesign allowed the work to be completed <strong>at</strong> the lowest levelof the garage and thereby minimize disruption of the parking oper<strong>at</strong>ions. Thedrilled shaft approach was to be completed by drilling through the top floor andwould have required substantial bracing of the structure to accommod<strong>at</strong>e thecrane loads.2. The external flush method was used to install the piles and the specific selectionof bond length was based on drilling response. The drilling penetr<strong>at</strong>ion r<strong>at</strong>e wascorrel<strong>at</strong>ed <strong>with</strong> specific founding m<strong>at</strong>erials and appropri<strong>at</strong>e bond stresses.12

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!