12.07.2015 Views

Micropile Installation with Spoil Control at Logan Airport - Nicholson ...

Micropile Installation with Spoil Control at Logan Airport - Nicholson ...

Micropile Installation with Spoil Control at Logan Airport - Nicholson ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

The final pile drilling depths were determined in the field by the Owner’s engineer usingthe inform<strong>at</strong>ion summarized in Table 2 based on drilling r<strong>at</strong>es and the design loads. TheGroup C m<strong>at</strong>erials were added during project construction when the diabase m<strong>at</strong>erial wasencountered unexpectedly.Table 2. Bond Parameters for Each Idealized GroupingLoadingConditionC/C Allowable Skin Allowable Skin Allowable Skin Allowable SkinPile Ø Spacing Friction Group A Friction Group B Friction Group C Friction Clay(in) (ft) kip/sq. ft. kip/lft kip/sq. ft. kip/lft kip/sq. ft. kip/lft psf plfComp.Ten.Comp.Ten.121299>= 5 2.4 7.54 6.0 18.85 14.0 43.984 2.0 6.28 6.0 18.85 14.0 43.983 1.8 5.65 6.0 18.85 14.0 43.98>= 5 1.9 5.97 6.0 18.85 14.0 43.98 350.0 1099.004 1.6 5.02 6.0 18.85 14.0 43.98 300.0 942.003 1.4 4.40 6.0 18.85 14.0 43.98 260.0 816.40>= 4 2.4 5.65 6.0 14.14 14.0 32.993 2.0 4.71 6.0 14.14 14.0 32.99>= 4 1.9 4.48 6.0 14.14 14.0 32.99 350.00 824.673 1.6 3.77 6.0 14.14 14.0 32.99 300.0 706.86Load Test ProgramPile load tests are used routinely on micropile projects to confirm the rel<strong>at</strong>ively largedesign loads. The micropile test program consisted of three pile load tests; two incompression and one in tension. All tests were on non-production 12-in piles. Tworeaction piles were installed for each test pile.Test piles were installed <strong>at</strong> two loc<strong>at</strong>ions, one on the north side of the structure and oneon the south side. Compression tests were conducted <strong>at</strong> both loc<strong>at</strong>ions <strong>with</strong> the northcompression test pile founded in rock and the south compression test pile founded inglacial till. A second test pile was installed <strong>at</strong> the north loc<strong>at</strong>ion <strong>with</strong>in the glacial till forthe tension test.Figure 2 shows theloc<strong>at</strong>ions of the testpiles as well as thegeneral layout of thesite. A typical loadtest set-up is shownin Figure 3.A center holehydraulic jack,reacting against a testframe supported bytwo adjacent reactionpiles, was used toapply the test load."Sister bars",installed adjacent tothe steel reinforcingNORTHTESTPILE SITENORTHEASTSTAIRTOWERFigure 2 Test Pile Loc<strong>at</strong>ionsCENTERCOREVEHICLE BRIDGESOUTHEASTSTAIRTOWERSOUTHTESTPILE SITE5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!