12.07.2015 Views

UDO Administrative Manual - Currituck County Government

UDO Administrative Manual - Currituck County Government

UDO Administrative Manual - Currituck County Government

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Non-Residential Building Permit ApplicationReview ProcessContact Information<strong>Currituck</strong> <strong>County</strong>Planning and Community DevelopmentCentral Permitting DivisionMainland Office153 Courthouse Road, Suite 117 Mainland Phone: 252.232.3378<strong>Currituck</strong>, NC 27929 Mainland Fax: 252.232.3026Corolla Office1123 Ocean Trail Corolla Phone: 252.453.8555PO Box 73 Corolla Fax: 252.453.8300Corolla, NC 27927Website:http://www.co.currituck.nc.us/planning-community-development.cfmStep 1 Application SubmittalThe applicant must submit a complete application packet. A complete application packet consists of the following:o Completed <strong>Currituck</strong> <strong>County</strong> non-residential building permit application.o Construction Plans and Specificationso Site Plans reviewed by Planning staff, TRC, and/or Board of Commissioners (as applicable).o Stormwater Plan, if requiredo Contractor of Record Formo Contractor and/or Owner Affidavito Wastewater Improvements Permit, Existing System Inspection, or Wastewater Reservationo Receipt of paid water tap or Well Permit, if requiredo CAMA Permit, if requiredo V Flood Zone certificate, if requiredo Submittal ChecklistStep 2 Permit ReviewThe county staff will review the application for completeness and code compliance. Once all requirements are metand permit fees are paid the permit will be issued. The permit fee will be determined at application submittal.Approved permits must be signed by the owner or applicant.Step 3 Posting of Permit and PlansBuilding permits must be posted at the construction site and clearly visible from the road. One set of approvedconstruction plans must be on the jobsite for all inspections.Step 4 InspectionsInspections must be scheduled by 4:00 pm the day before the requested inspection. Inspections are performedbetween 8:00 am and 5:00 pm, Monday through Friday. The required inspections will vary for each project;please review the Inspection Handbook for inspection types.Section 2.4.3<strong>Administrative</strong> <strong>Manual</strong>Page 2.33Nonresidential Building Permit ApplicationPage 1 of 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!