- Page 1: B I D D I N G D O C U M E N T SforP
- Page 4 and 5: ii) The number mentioned on acknowl
- Page 7: PART 1 - BIDDING PROCEDURES1 Sectio
- Page 10 and 11: 31. Correction of Arithmetical Erro
- Page 12 and 13: other financing)..3. Corrupt andFra
- Page 14 and 15: Bank’s Guidelines on Preventing a
- Page 16 and 17: 6.4 The Bidder is expected to exami
- Page 18 and 19: (b)(c)(d)completed schedules as req
- Page 20 and 21: Contract. In such a case, the Bidde
- Page 22 and 23: (b) In the case of adjustable price
- Page 24 and 25: permitted in accordance with ITB 13
- Page 26 and 27: to witness the bid opening shall be
- Page 28 and 29: not be related to any aspect of the
- Page 30 and 31: Evaluation and Qualification Criter
- Page 32 and 33: Agreement, the successful Bidder sh
- Page 34 and 35: ITB 7.1ITB 7.4ITB 10.1ITB 11.1 (h)B
- Page 36 and 37: ITB 15.1ITB 18.1ITB 18.3(a)ITB 18.3
- Page 38 and 39: on “Encrypt and Upload” a templ
- Page 40 and 41: ITB 34.4Option 2:a) In the case of
- Page 42 and 43: 1. Domestic Preference: (NOT APPLIC
- Page 46 and 47: Eligibility and Qualification Crite
- Page 48 and 49: Eligibility and Qualification Crite
- Page 50 and 51: Eligibility and Qualification Crite
- Page 52 and 53: 3.5 PersonnelThe Bidder must demons
- Page 54 and 55: 3.7 Bid capacityBidders who meet th
- Page 56 and 57: Letter of BidTo: The Commissioner,A
- Page 58 and 59: Signature of the person named above
- Page 60 and 61: 5 Pig Iron All India Whole salepric
- Page 62 and 63: 6 ConstructionMachinery7 Fuel andLu
- Page 64 and 65: Bill of Quantities(Attached as Sepa
- Page 66 and 67: SiteOrganization60 Section III. Eva
- Page 68 and 69: Mobilization Schedule62 Section III
- Page 70 and 71: Form EQU: EquipmentThe Bidder shall
- Page 72 and 73: Form PER-2: Resume of Proposed Pers
- Page 74 and 75: Bidders Qualification without prequ
- Page 76 and 77: Form ELI -1.2Bidder's Party Informa
- Page 78 and 79: Year ofdisputeAmount indispute(curr
- Page 80 and 81: *Refer to ITB 15 for the exchange r
- Page 82 and 83: Form FIN - 3.3: Financial Resources
- Page 84 and 85: Form EXP - 4.1General Construction
- Page 86 and 87: Form EXP - 4.2(a) (cont.)Specific C
- Page 88 and 89: Employer’s Name:Address:Telephone
- Page 90 and 91: Form of Bid Security(Demand Guarant
- Page 92 and 93: Section V. Eligible CountriesEligib
- Page 94 and 95:
allegations of a corrupt, fraudulen
- Page 96 and 97:
Section VII. Works RequirementsCont
- Page 98 and 99:
Sl No Diameter of DI K-9pipesLength
- Page 100 and 101:
MILE STONES:The Intended period of
- Page 102 and 103:
SECTION- VII AGENERAL SPECIFICATION
- Page 104 and 105:
(iii) Provide H and S orientation t
- Page 106 and 107:
and Low Heat PortlandCement.Sand IS
- Page 108 and 109:
2.2.7 For the work of excavation th
- Page 110 and 111:
elevant IS Code. Fineness Modulus s
- Page 112 and 113:
water supply and filling and dispos
- Page 114 and 115:
No payment for the dismantled concr
- Page 116 and 117:
water around newly poured concrete
- Page 118 and 119:
3.18 Chases, Holes, Recesses and In
- Page 120 and 121:
(ten) days continuously.5.1.7 The c
- Page 122 and 123:
mm. and the size of the rung formed
- Page 124 and 125:
DIVISION - 1GENERAL SPECIFICATIONST
- Page 126 and 127:
DIVISION-2SITE WORK2.1 Intimation a
- Page 128 and 129:
DIVISION-3EARTH WORK3.0 GeneralPrio
- Page 130 and 131:
Separate payment will not be made t
- Page 132 and 133:
The unit price bid there for in the
- Page 134 and 135:
150 Micron 0 to 15A sand whose grad
- Page 136 and 137:
cubes shall develop a compressive s
- Page 138 and 139:
(b)Cost:The cost of sand for mortar
- Page 140 and 141:
5.4 Section - Pointing To Stone Mas
- Page 142 and 143:
(b)Nominal maximum size of Aggregat
- Page 144 and 145:
6.2.4 Water: Shall conform to parag
- Page 146 and 147:
The concrete as discharged from the
- Page 148 and 149:
to prevent sagging. Any needed repa
- Page 150 and 151:
splices shall be located where show
- Page 152 and 153:
When the work has to be resumed on
- Page 154 and 155:
Care shall be taken to prevent cold
- Page 156 and 157:
allow water to drain from them and
- Page 158 and 159:
DIVISION-7MATERIALS REQUIRED FOR PI
- Page 160 and 161:
7.4. Air Valves:Air valves shall be
- Page 162 and 163:
The valve be coated internally and
- Page 164 and 165:
DIVISION-8LAYING AND JOINTING OF PI
- Page 166 and 167:
8.9. RefillingAfter the pipelines a
- Page 168 and 169:
for witnessing the test and manufac
- Page 170 and 171:
9.8 Fittings9.8.1 Dimensional and o
- Page 172 and 173:
350 520 16 28 M24400 580 16 31 M274
- Page 174 and 175:
securely closed as may be directed
- Page 176 and 177:
The relevant clauses of IS 12288:19
- Page 178 and 179:
9.15.3 Butterfly ValvesButterfly va
- Page 180 and 181:
Relay valve - 316 stainless steelVa
- Page 182 and 183:
DIVISION - 10HOUSE SERVICE CONNECTI
- Page 184 and 185:
on an automatic fusion control box.
- Page 186 and 187:
4. Effects on Quality of WaterThe c
- Page 188 and 189:
. Appearance of Waterc. Growth of M
- Page 190 and 191:
DIVISION - 11TREEPLANTATION STRATEG
- Page 192 and 193:
area shall be permitted. No plant m
- Page 194 and 195:
air pockets round the roots and shr
- Page 196 and 197:
Figure -1: Ornamental Tree Guard wi
- Page 198 and 199:
1.3. SITE CLEARANCE:Shall conform t
- Page 200 and 201:
SECTION VII-CGENERAL CONDITIONS FOR
- Page 202 and 203:
Contractor or any of his sub-contra
- Page 204 and 205:
carried out either by the Engineer
- Page 206 and 207:
j) Tension testerk) Slump cone with
- Page 208 and 209:
12.2 All test certificates and repo
- Page 210 and 211:
19. Damage Risk and Insurance19.1 T
- Page 212 and 213:
4 Baseline parameters Adequate meas
- Page 214 and 215:
S.No. Activity BoQ Reference Antici
- Page 216 and 217:
S.No. Activity BoQ Reference Antici
- Page 218 and 219:
S.No. Activity BoQ Reference Antici
- Page 220 and 221:
S.No. Activity BoQ Reference Antici
- Page 222 and 223:
S.No. Activity BoQ Reference Antici
- Page 224 and 225:
S.No. Activity BoQ Reference Antici
- Page 227 and 228:
Appendix VIISALIENT FEATURES OF SOM
- Page 229 and 230:
Appendix VIISALIENT FEATURES OF SOM
- Page 231 and 232:
List of Drawings - AnanthapurSl. No
- Page 233 and 234:
39462 49.31981 11953155393 46.31991
- Page 235:
4Rapid Gravity Filters at SummerSto
- Page 238 and 239:
Section VIII. General Conditions (G
- Page 240 and 241:
7.3 Inspection ....................
- Page 242 and 243:
17.2 Contractor’s Care of the Wor
- Page 244 and 245:
General Conditions1. General Provis
- Page 246 and 247:
Employer or the Engineer, as Employ
- Page 248 and 249:
1.1.4.6 “Foreign Currency” mean
- Page 250 and 251:
1.1.6.7 “Site” means the places
- Page 252 and 253:
(g) the Specification,(h) the Drawi
- Page 254 and 255:
exclusive royalty-free licence to c
- Page 256 and 257:
2. The Employer2.1 Right of Access
- Page 258 and 259:
Defects Notification Period, the Em
- Page 260 and 261:
(d)Clause 13.1 or 13.2.Sub-Clause 1
- Page 262 and 263:
4. The Contractor4.1 Contractor’s
- Page 264 and 265:
legal fees and expenses) resulting
- Page 266 and 267:
such obligations to the Employer, t
- Page 268 and 269:
Compliance with the quality assuran
- Page 270 and 271:
other physical conditions in simila
- Page 272 and 273:
and other results of his operations
- Page 274 and 275:
(iv) shipment and arrival at the Si
- Page 276 and 277:
deemed reasonable if it arises from
- Page 278 and 279:
duties in regard to such deductions
- Page 280 and 281:
6.8 Contractor’sSuperintendenceFo
- Page 282 and 283:
6.19 FuneralArrangements6.20 Prohib
- Page 284 and 285:
(b) during production, manufacture
- Page 286 and 287:
accordance with the Contract, and(c
- Page 288 and 289:
Works, including the anticipated ti
- Page 290 and 291:
other than as a result of a cause l
- Page 292 and 293:
of termination under Sub-Clause 16.
- Page 294 and 295:
Taking-Over Certificate not earlier
- Page 296 and 297:
If the Contractor suffers delay and
- Page 298 and 299:
11.5 Removal ofDefective Work(c)if
- Page 300 and 301:
Representative, who shall:(a) promp
- Page 302 and 303:
price for the purposes of Interim P
- Page 304 and 305:
the varied works, taking account of
- Page 306 and 307:
13.7 Adjustments forChanges inLegis
- Page 308 and 309:
the fourth and fifth columns respec
- Page 310 and 311:
payment shall be repaid through per
- Page 312 and 313:
instalments were previously based.I
- Page 314 and 315:
Contractor accordingly.An Interim P
- Page 316 and 317:
When calculating these proportions,
- Page 318 and 319:
shall be effective on such date.14.
- Page 320 and 321:
Security] or with a notice under Su
- Page 322 and 323:
of Termination]. After recovering a
- Page 324 and 325:
may be and as described in the noti
- Page 326 and 327:
(i) suspend work or reduce the rate
- Page 328 and 329:
Contractor’s Documents conform wi
- Page 330 and 331:
17.6 Limitation ofLiability17.7 Use
- Page 332 and 333:
(b)copies of the policies for the i
- Page 334 and 335:
(c), (g) and (h) of Sub-Clause 17.3
- Page 336 and 337:
that this insurance may exclude los
- Page 338 and 339:
19.5 Force MajeureAffectingSubcontr
- Page 340 and 341:
Within 42 days after the Contractor
- Page 342 and 343:
whom the DB consults, shall be mutu
- Page 344 and 345:
Parties, and no Notice of Dissatisf
- Page 346 and 347:
APPENDIXA General Conditions of Dis
- Page 348 and 349:
egarding employment by any of them,
- Page 350 and 351:
decisions; and(iii) each day spent
- Page 352 and 353:
thereof, shall be finally settled b
- Page 354 and 355:
The Employer and the Contractor emp
- Page 356 and 357:
Part A - Contract DataConditions Su
- Page 358 and 359:
Conditions Sub-Clause DataTotal adv
- Page 360 and 361:
Conditions Sub-Clause DataContracto
- Page 362 and 363:
Conditions Sub-Clause DataRules of
- Page 364 and 365:
Conditions Sub-Clause Data(c)If one
- Page 366 and 367:
Part B - Specific ProvisionsSub-Cla
- Page 368 and 369:
Section X. Annex to the Particular
- Page 370 and 371:
Contract AgreementTHIS AGREEMENT ma
- Page 372 and 373:
Performance SecurityOption 1: (Dema
- Page 374 and 375:
Option 2: Performance BondBy this B
- Page 376 and 377:
Advance Payment SecurityDemand Guar
- Page 378 and 379:
Retention Money SecurityDemand Guar