12.07.2015 Views

Download - Andhra Pradesh Municipal Development Project Website

Download - Andhra Pradesh Municipal Development Project Website

Download - Andhra Pradesh Municipal Development Project Website

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Eligibility and Qualification Criteria Compliance Requirements DocumentationNo. Subject Requirement Single EntityJoint Venture (existing or intended)All Parties Each Member Lead PartnerSubmissionCombinedrequirements2. Historical Contract Non-Performance2.1 History of Non-PerformingContractsNon-performance of a contract 2 didnot occur as a result of contractordefault since 1 st April ,2010.Must meetrequirement 12Must meetrequirementsMust meet N/A Form CON-2requirement 32.2 Suspension Basedon Execution of BidSecuringDeclaration by theEmployer orwithdrawal of theBidwithin BidvalidityNot under suspension based onexecution of a Bid SecuringDeclaration pursuant to ITB4.6 orwithdrawal of the Bid pursuant ITB19.9.2.3 Pending Litigation Bidder’s financial position andprospective long term profitabilitysound according to criteriaestablished in 3.1 below andassuming that all pending litigationwill be resolved against the BidderMust meetrequirementMust meetrequirementMust meetrequirementN/AMust meetrequirementMust meetrequirementN/ABidSubmissionFormN/A Form CON – 22 Non performance, as decided by the Employer, shall include all contracts where (a) nonperformance was not challenged by the contractor, including throughreferral to the dispute resolution mechanism under the respective contract, and (b) contracts that were so challenged but fully settled against the contractor.Non performance shall not include contracts where Employers decision was overruled by the dispute resolution mechanism. Non performance must be basedon all information on fully settled disputes or litigation, i.e. dispute or litigation that has been resolved in accordance with the dispute resolution mechanismunder the respective contract and where all appeal instances available to the Bidder have been exhausted.3 This requirement also applies to contracts executed by the Bidder as JV member.39 Section III. Evaluation and Qualification Criteria (without prequalification)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!