- Page 1: B I D D I N G D O C U M E N T SforP
- Page 4 and 5: ii) The number mentioned on acknowl
- Page 7: PART 1 - BIDDING PROCEDURES1 Sectio
- Page 11 and 12: Section I. Instructions to BiddersA
- Page 13 and 14: Participation by a Bidder in more t
- Page 15 and 16: specified in the BDS.4.9 A Bidder s
- Page 17 and 18: 8. Amendment ofBidding Documentsmee
- Page 19 and 20: to offer technical alternatives to
- Page 21 and 22: 17.2 If a margin of preference appl
- Page 23 and 24: 19.5 If a bid security is specified
- Page 25 and 26: shall be specified in the BDS.24. W
- Page 27 and 28: equirements specified in the Biddin
- Page 29 and 30: Section III 4.2. When subcontractin
- Page 31 and 32: F. Award of Contract39. Award Crite
- Page 33 and 34: Section II. Bid Data SheetITB 1.1IT
- Page 35 and 36: ITB 14.5ITB 14.7Omitted.b) The addi
- Page 37 and 38: ITB 20.2ITB 22.1The written confirm
- Page 39 and 40: ITB 25.4modifications made pursuant
- Page 41 and 42: Section III. Evaluation and Post Qu
- Page 43 and 44: 2.4 Technical alternatives , if per
- Page 45 and 46: Eligibility and Qualification Crite
- Page 47 and 48: Eligibility and Qualification Crite
- Page 49 and 50: Eligibility and Qualification Crite
- Page 51 and 52: Eligibility and Qualification Crite
- Page 53 and 54: 3Dumper/Tippers:Minimum capacity -
- Page 55 and 56: Section IV. Bidding FormsTable of F
- Page 57 and 58: emain binding upon us and may be ac
- Page 59 and 60:
Appendix to BidSchedule of Adjustme
- Page 61 and 62:
Table B. Foreign Currency (FC)State
- Page 63 and 64:
Table C. Summary of Payment Currenc
- Page 65 and 66:
Technical Proposal- Site Organizati
- Page 67 and 68:
MethodStatement61 Section III. Eval
- Page 69 and 70:
Construction Schedule63 Section III
- Page 71 and 72:
PersonnelForm PER-1: ProposedPerson
- Page 73 and 74:
Summarize professional experience o
- Page 75 and 76:
Form ELI -1.1Bidder Information For
- Page 77 and 78:
Form CON - 2Historical Contract Non
- Page 79 and 80:
Form FIN - 3.1Financial Situation a
- Page 81 and 82:
Form FIN - 3.2Average Annual Constr
- Page 83 and 84:
Form FIN - 3.4: Current Contract Co
- Page 85 and 86:
Form EXP - 4.2(a)Specific Construct
- Page 87 and 88:
Form EXP - 4.2(b)Construction Exper
- Page 89 and 90:
InformationEmployer’s Name:Addres
- Page 91 and 92:
This guarantee will expire: (a) if
- Page 93 and 94:
Section VI. Bank Policy - Corrupt a
- Page 95 and 96:
PART 2 -WORKS REQUIREMENTS89
- Page 97 and 98:
Scope of WorksName of the Work: Pro
- Page 99 and 100:
same approved by the Engineer-in-ch
- Page 101 and 102:
S.No. SectionSPECIFICATIONSSpecific
- Page 103 and 104:
1.2 WorkmanshipAll works are to be
- Page 105 and 106:
1.8.2 After the work is completed,
- Page 107 and 108:
2. Earth Work in Excavation & Filli
- Page 109 and 110:
IS:515. Samples of aggregates, prop
- Page 111 and 112:
3.6.1 The concrete proportions shal
- Page 113 and 114:
Grade of ConcreteCement Content per
- Page 115 and 116:
e either long and grooved or the jo
- Page 117 and 118:
minimum thickness of PVC sealing st
- Page 119 and 120:
of unfinished work shall be cleaned
- Page 121 and 122:
absorbent surface. The quantity of
- Page 123 and 124:
to comply with any obligation expre
- Page 125 and 126:
SL. No Description I.S. No.Sewerage
- Page 127 and 128:
convenient place and deposited ther
- Page 129 and 130:
Excavation(a)Classification of Exca
- Page 131 and 132:
3.3 Backfill3.3.1 Back Fill Around
- Page 133 and 134:
DIVISION-4MASONRY4.1 Materials4.1.1
- Page 135 and 136:
Permissible limit for SolidsMaximum
- Page 137 and 138:
DIVISION-5PLASTERING & POINTING5.1
- Page 139 and 140:
5.3.1 Preparation of SurfaceThe rou
- Page 141 and 142:
DIVISION-6CONCRETE6.1 Concrete Stru
- Page 143 and 144:
sections without vibration or heavi
- Page 145 and 146:
6.2.6 Coarse AggregateGeneralFor th
- Page 147 and 148:
e used, forms shall be sufficiently
- Page 149 and 150:
Repair of Hardened Concrete not wit
- Page 151 and 152:
(e)Measurement and PaymentMeasureme
- Page 153 and 154:
All concrete shall be placed in app
- Page 155 and 156:
Interior surface shall be sloped fo
- Page 157 and 158:
) Types of RepairAll repairs shall
- Page 159 and 160:
7.3.1 Butterfly ValvesButterfly val
- Page 161 and 162:
developing when any washout is open
- Page 163 and 164:
7.6. Hemp Yarn: The Hemp Yarn to be
- Page 165 and 166:
8.5. JointingBefore commencing join
- Page 167 and 168:
DIVISION-9DUCTILE IRON PIPES FOR WA
- Page 169 and 170:
fittings of different sizes manufac
- Page 171 and 172:
700 738 +1/-4.3 14.4 16.8 -3.00750
- Page 173 and 174:
9.9 Jointing9.9.1 GeneralJointing o
- Page 175 and 176:
9.12 MeasurementAll pipes shall be
- Page 177 and 178:
9.15 Appurtenant Works9.15.1 Genera
- Page 179 and 180:
Valve operation shall be achieved b
- Page 181 and 182:
The design of the valve shall be su
- Page 183 and 184:
ISO 9001:2000 certification for the
- Page 185 and 186:
B. COMPRESSION FITTINGSCompression
- Page 187 and 188:
Clause 7.2 -Clause 7.3 -Clause 7.4.
- Page 189 and 190:
4 Hydrostatic Test5 Pigment Dispers
- Page 191 and 192:
• The first row of plants along t
- Page 193 and 194:
Root System:The root system shall b
- Page 195 and 196:
6.2.5 StakingNewly planted trees mu
- Page 197 and 198:
SECTION -VII BELEVATED SERVICE RESE
- Page 199 and 200:
The FRP ventilators shall be fixed
- Page 201 and 202:
3. Prosecution of the Work3.1 The C
- Page 203 and 204:
from the date of commissioning shal
- Page 205 and 206:
iv. The decision of the Employer /
- Page 207 and 208:
d. The testing machine should also
- Page 209 and 210:
penalties and liability of every ki
- Page 211 and 212:
ANNEXURE-IENVIRONMENTAL MANAGEMENT
- Page 213 and 214:
ANNEXURE-IIENVIRONMENTAL MANAGEMENT
- Page 215 and 216:
S.No. Activity BoQ Reference Antici
- Page 217 and 218:
S.No. Activity BoQ Reference Antici
- Page 219 and 220:
S.No. Activity BoQ Reference Antici
- Page 221 and 222:
S.No. Activity BoQ Reference Antici
- Page 223 and 224:
S.No. Activity BoQ Reference Antici
- Page 225:
S.No. Activity BoQ Reference Antici
- Page 228 and 229:
(Protection) Act 1986, and exceedin
- Page 230 and 231:
(Protection) Act 1986, and exceedin
- Page 232 and 233:
Supplementary InformationGeneral In
- Page 234 and 235:
Solid Waste ManagementAccording to
- Page 237 and 238:
PART 3 - CONDITIONS OF CONTRACTAND
- Page 239 and 240:
4.11 Sufficiency of the Accepted Co
- Page 241 and 242:
12.2 Method of Measurement ........
- Page 243 and 244:
Section VIII. General Conditions (G
- Page 245 and 246:
submitted with the Letter of Tender
- Page 247 and 248:
1.1.4 Money andPayments1.1.3.5 “T
- Page 249 and 250:
1.1.5.4 “Permanent Works” means
- Page 251 and 252:
mail or courier, or transmitted usi
- Page 253 and 254:
at all reasonable times.If a Party
- Page 255 and 256:
equired to establish his qualificat
- Page 257 and 258:
2.3 Employer’sPersonnelof the Cou
- Page 259 and 260:
the authority attributed to the Eng
- Page 261 and 262:
3.3 Instructions ofthe Engineer3.4
- Page 263 and 264:
when the Works are completed, be fi
- Page 265 and 266:
functions and authority to any comp
- Page 267 and 268:
Claims] to:(a)an extension of time
- Page 269 and 270:
eferred to in Sub-Clause 4.10 [Site
- Page 271 and 272:
(a)the Contractor shall (as between
- Page 273 and 274:
these materials at the time and pla
- Page 275 and 276:
Contractor’s Equipment, surplus m
- Page 277 and 278:
etention or otherwise. Unless the C
- Page 279 and 280:
The Contractor shall appoint an acc
- Page 281 and 282:
amongst the Contractor’s Personne
- Page 283 and 284:
6.24 Non-Discriminationand EqualOpp
- Page 285 and 286:
have been made in the Engineer’s
- Page 287 and 288:
(a)(b)(c)(d)signature of the Contra
- Page 289 and 290:
or will be delayed by any of the fo
- Page 291 and 292:
The Engineer may also notify the ca
- Page 293 and 294:
out in the presence of the Contract
- Page 295 and 296:
After the Engineer has issued a Tak
- Page 297 and 298:
with the Contract, or(c)failure by
- Page 299 and 300:
11.10 UnfulfilledObligationswhich t
- Page 301 and 302:
Any item of work included in the Bi
- Page 303 and 304:
(d)(e)(f)omission of any work unles
- Page 305 and 306:
Engineer may instruct:(a)work to be
- Page 307 and 308:
Contractor shall be adjusted for ri
- Page 309 and 310:
(ii) for the purposes of Clause 12
- Page 311 and 312:
in sub-paragraphs (b) to (g) below)
- Page 313 and 314:
amounts and currencies equal to the
- Page 315 and 316:
Payment of the amount due in each c
- Page 317 and 318:
(b) any further sums which the Cont
- Page 319 and 320:
for calculating the payments, shall
- Page 321 and 322:
or otherwise.The Contractor shall t
- Page 323 and 324:
party to obtain a financial or othe
- Page 325 and 326:
(b)the Engineer fails, within 56 da
- Page 327 and 328:
defects, unless attributable to any
- Page 329 and 330:
ectifying this loss or damage, the
- Page 331 and 332:
liable, the Contractor shall, at hi
- Page 333 and 334:
[Contractor’s Claims], as applica
- Page 335 and 336:
[Insurance for Contractor’s Perso
- Page 337 and 338:
the performance of which is or will
- Page 339 and 340:
limited to, Force Majeure) arises w
- Page 341 and 342:
ejected by the Engineer and any of
- Page 343 and 344:
20.4 ObtainingDispute Board’sDeci
- Page 345 and 346:
language for communications defined
- Page 347 and 348:
impartiality and independence.When
- Page 349 and 350:
from which he is relieved from liab
- Page 351 and 352:
half of these payments, plus all co
- Page 353 and 354:
PROCEDURAL RULESUnless otherwise ag
- Page 355 and 356:
Section IX. Particular Conditions (
- Page 357 and 358:
Conditions Sub-Clause Datasub-contr
- Page 359 and 360:
Conditions Sub-Clause DataLimit of
- Page 361 and 362:
Conditions Sub-Clause DataMaximum t
- Page 363 and 364:
Conditions Sub-Clause Data(b)In the
- Page 365 and 366:
Conditions Sub-Clause Data(e)The de
- Page 367 and 368:
APPENDIX-IIIStage wise PaymentsSTAG
- Page 369 and 370:
Notification of AwardLETTER OF ACCE
- Page 371 and 372:
IN WITNESS whereof the parties here
- Page 373 and 374:
This guarantee is subject to the Un
- Page 375 and 376:
Any suit under this Bond must be in
- Page 377 and 378:
The maximum amount of this guarante
- Page 379:
its obligation(s) under the Contrac