12.07.2015 Views

Gauteng SDI Rail Link - Gautrain

Gauteng SDI Rail Link - Gautrain

Gauteng SDI Rail Link - Gautrain

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

541.4.3 Project ScopingIn order to focus the scope of the project, together with the study approach andmethod, a number of key issues were identified.As far as possible, these key issueswere clarified during the first working session between Gautrans, the ConsultingTeam and some of the key role players.These key issues were, therefore, applied as the short-term focus of the study for theperiod running to this Inception Report, as compared to the longer-term focus of thestudy on the study elements.Initial Identification of Alternatives:- Stations and Routes- TechnologyConceptual Demand1:50 000 ContourPlansKnown land-useStrategicSifting ofAlternativesStage One SiftingDemand: ExtendPWV-ModelOrto-photosInvestigateExisting andFuture land-useTechnicalPrioritisationand Sifting ofAlternativesStage Two SiftingStatedPreference andModal ChoiceModelVertical SectionsProjected andderived land-useSifting ofFEASIBLE andpreferredalternativesStage Three SiftingProject SpecificationsFIGURE 7: SIFTING OF ALTERNATIVESINCREASINGLEVEL OFDETAIL ANDACCURACY<strong>Gauteng</strong> <strong>SDI</strong> <strong>Rail</strong> <strong>Link</strong> – Inception Report, 15 June 2000

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!