12.07.2015 Views

Technical Paper 2 – Heritage Assessment - Transport for NSW ...

Technical Paper 2 – Heritage Assessment - Transport for NSW ...

Technical Paper 2 – Heritage Assessment - Transport for NSW ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

The documents reviewed, in preparation of this report, were:• Monorail Removal Project Removal Methodology Concept (Evans and Peck, dated 3 October 2012)• Monorail Removal Project Removal Methodology Concept (Evans and Peck, dated 5 October 2012)• Monorail Removal Project Station Removal Methodology - DRAFT (Evans and Peck, dated 10October 2012)• Monorail Removal Project Galeries Victoria Station Removal Methodology - DRAFT (Evans andPeck, dated 24 October 2012)• Monorail Removal Project Removal of Monorail on Pyrmont Bridge - DRAFT (Evans and Peck,dated 23 October 2012)• Report Pyrmont Bridge Control Tower Restoring to original location, (Waterman AHW Pty Ltd, dated 22October 2012)• Pyrmont Bridge Darling Harbour Sydney Conservation Management Plan (Otto Cserhalmi & Partners, June2006)1.4 Site IdentificationThe Monorail network extends <strong>for</strong> 3.6 kms within the Sydney Central Business District (CBD), connecting the citywith Pyrmont, Darling Harbour, the Sydney Convention & Exhibition Centre and Chinatown. A map of the monorailnetwork is shown in Figure 1.1.Figure 1.1Map showing the Monorail network marked inredSource: Tf<strong>NSW</strong>5Monorail Removal ProjectStatement of <strong>Heritage</strong> ImpactNovember 2012Graham Brooks & Associates Pty Ltd

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!