01.12.2012 Views

moog_series_rkp_radial_piston_pumps_cataoue_de_en.pdf

moog_series_rkp_radial_piston_pumps_cataoue_de_en.pdf

moog_series_rkp_radial_piston_pumps_cataoue_de_en.pdf

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

REGLER<br />

COMPENSATORS<br />

RKP 19 - 100<br />

KOMBINIERTER DRUCK- UND FÖRDERSTROMREGLER<br />

„LOAD SENSING“<br />

MIT P-T-STEUERKANTE �R<br />

D2<br />

T<br />

D1 D2<br />

RKP 16 … 45 DN 6 0,9 1,2<br />

RKP 63 … 100 DN 8 0,9 1,2<br />

RKP 140 DN 8 0,8 1,1<br />

I ≈ 800 mm<br />

42 Moog • RKP<br />

Ø0,8 ... 0,9mm<br />

D1<br />

B (A)<br />

A (B) L<br />

RKP<br />

COMBINED PRESSURE AND FLOW COMPENSATOR<br />

„LOAD SENSING“<br />

WITH P-T CONTROL NOTCH �R<br />

Q [l/min]<br />

p [bar]<br />

*Empfehlung Schlauch für Steuerleitung * Hose recomm<strong>en</strong>dation for control line<br />

Schaltungshinweis für Mehrfachpump<strong>en</strong><br />

Bei Mehrfachpump<strong>en</strong>, die in ein<strong>en</strong> Kreis för<strong>de</strong>rn, darf nur am<br />

Regler <strong>de</strong>r erst<strong>en</strong> Pumpe die P-T-Steuerkante durch Verbindung<br />

<strong>de</strong>s T-Anschlusses mit <strong>de</strong>m Tank aktiviert wer<strong>de</strong>n.<br />

Bei <strong>de</strong>n Reglern <strong>de</strong>r Anbaupump<strong>en</strong> muß <strong>de</strong>r T-Anschluß <strong>de</strong>r<br />

Regler verschloss<strong>en</strong> wer<strong>de</strong>n.<br />

Achtung!<br />

Die Tankleitung <strong>de</strong>s Reglers darf nicht mit <strong>de</strong>r Leckölleitung<br />

<strong>de</strong>r Pumpe zusamm<strong>en</strong>gefaßt wer<strong>de</strong>n.<br />

Notes on multiple pump circuits<br />

Einstellung am<br />

Vorsteuerv<strong>en</strong>til<br />

Set at pilot valve<br />

Einstellung an<br />

<strong>de</strong>r Meßdrossel<br />

Set at metering<br />

throttle<br />

In the case of multiple <strong>pumps</strong> which <strong>de</strong>liver in a circuit, the P-<br />

T control notch may only be activated for the comp<strong>en</strong>sator of<br />

the first pump by connecting the T-connection to the tank.<br />

The T-connection of the comp<strong>en</strong>sators of add-on <strong>pumps</strong> must<br />

be sealed off.<br />

Caution!<br />

The tank line of the comp<strong>en</strong>sator must not be combined with<br />

the drain line of the pump.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!