November 2010 - Central Florida Chapter Associated Builders and ...
November 2010 - Central Florida Chapter Associated Builders and ...
November 2010 - Central Florida Chapter Associated Builders and ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Plumbing • HVAC • Process Piping<br />
Lake Mechanical Contractors, Inc. will be the<br />
benchmark for our industry as an employee owned<br />
company, through commitment, integrity <strong>and</strong> superior<br />
service. Our Employees will be the dynamic driving<br />
force in our company <strong>and</strong> community.<br />
P.O. Box 1924<br />
343 North Bay Street<br />
Eustis, FL 32726<br />
ABC 2009<br />
CONTRACTOR<br />
OF THE YEAR<br />
Tel: (352) 357-3136<br />
Fax (352) 483-2713<br />
www.lakemechanical.net<br />
In addition, Quality Metals has also contracted<br />
with MM Parrish for the new Gainesville Fire<br />
Station #8.<br />
… was selected by Wharton-Smith Construction<br />
Group to provide services for<br />
both the new Orange County Southern<br />
Regional Water Supply Facility, <strong>and</strong> Volusia<br />
County Holly Hill Elementary School projects.<br />
R<strong>and</strong>all Mechanical Inc.<br />
… newly-exp<strong>and</strong>ed High Purity Piping Business<br />
Group has completed a high-tech passivation<br />
project at the 500,000-square-foot Catalent<br />
Pharma Solutions facility located at 2725<br />
Scherer Drive North, St. Petersburg, FL, announced<br />
Jeffrey S. Condello, R<strong>and</strong>all Mechanical’s<br />
founder <strong>and</strong> president/CEO. Passivation<br />
is a critical highly-specialized process that<br />
purifies the interior surfaces of high purity<br />
piping <strong>and</strong> improves corrosion resistance by<br />
flushing <strong>and</strong> chemically cleaning the process<br />
piping systems. R<strong>and</strong>all’s expert technicians<br />
performed the passivation process on over<br />
one linear mile of high purity piping which required<br />
a dem<strong>and</strong>ing 10-day around-the-clock<br />
schedule during Catalent’s two-week annual<br />
maintenance shutdown. Catalent is one of<br />
the world’s leading providers of advanced<br />
dose form <strong>and</strong> packaging technologies as well<br />
as development, manufacturing <strong>and</strong> packaging<br />
services for pharmaceutical, biotechnology<br />
<strong>and</strong> consumer health companies.<br />
In making the announcement, Condello<br />
added “I am especially pleased that longtime<br />
industry veterans Gary Hamilton <strong>and</strong> Robert<br />
Elliott have recently joined the R<strong>and</strong>all<br />
Mechanical team, serving as manager <strong>and</strong><br />
project manager, respectively, for our High<br />
Purity Piping Business Group. Both are widely<br />
respected experts in the high-technology high<br />
purity process piping field, <strong>and</strong> complement<br />
R<strong>and</strong>all Mechanical’s renowned integrated<br />
design <strong>and</strong> 3D Building Information Modeling<br />
(BIM) leadership.”<br />
… ranks as the 7th largest <strong>Florida</strong>-based mechanical<br />
contractor according to Southeast<br />
Construction magazine’s “Top Specialty Contractors”<br />
survey published September <strong>2010</strong>.<br />
The company, with reported 2009 revenues<br />
of $26.4 million, is also the 11th largest mechanical<br />
contractor in the Southeast.<br />
… is under way on $6.5 million of campuswide<br />
mechanical system upgrades at Orange<br />
County Public Schools’ University High School<br />
in Orl<strong>and</strong>o, FL. The project includes a new<br />
<strong>Central</strong> Energy Plant that features a state-ofthe-art<br />
thermal storage chill water system.<br />
Completion is slated for June 2012.<br />
(continued next page)<br />
NOVEMBER <strong>2010</strong> BUILDING CENTRAL FLORIDA 13