(d)(e)the Contractor shall be fully responsible <strong>for</strong> the adequacy, stability <strong>and</strong>safety <strong>of</strong> all site operations <strong>and</strong> methods <strong>of</strong> construction, <strong>and</strong> <strong>for</strong> theremoval, if so required under the Contract or by the Superintending Officer,<strong>of</strong> all Temporary Works;the Contractor shall be fully responsible <strong>for</strong> the adequacy <strong>and</strong> integrity <strong>of</strong> the<strong>design</strong> <strong>and</strong> the Works, <strong>and</strong> <strong>for</strong> the Works being suitable or fit in all respects<strong>for</strong> the purpose <strong>for</strong> which the Works are constructed, <strong>and</strong> in accordance withthe Employer’s Requirements.4.2 Employment <strong>of</strong> Qualified Personnel(1) (a) The Contractor shall engage suitably qualified personnel as required byrelevant applicable laws. All fees, costs <strong>and</strong> expenses so incurred by theContractor shall be deemed to be included in the Contract Sum.(b)Where an Accredited Checker or Registered Inspector is required <strong>for</strong> theWorks, they shall be engaged by the Employer.(2) No person shall be engaged by the Contractor under Clause 4.2(1) if theSuperintending Officer objects to the engagement <strong>of</strong> such qualified personnel, inwhich event the Contractor shall promptly nominate <strong>and</strong> engage other suitablyqualified personnel.(3) In addition, the Superintending Officer shall have the authority to object to thecontinued engagement <strong>of</strong> any qualified personnel under Clause 4.2(1) at any time.The Contractor shall, upon receiving notice in writing <strong>of</strong> such objection, cease toengage or allow the qualified personnel from carrying out any work or undertakingany duties in any capacity with respect to the Contract <strong>and</strong> shall promptly replace himwith other suitably qualified personnel.(4) Upon the engagement <strong>of</strong> the qualified personnel under Clauses 4.2(1), (2) or (3), theContractor shall not replace such persons as the qualified personnel without the priorwritten concurrence <strong>of</strong> the Superintending Officer.4.3 Responsibility <strong>for</strong> Identifying Ambiguities, Discrepancies, etc(1) The Contractor shall <strong>for</strong>thwith notify the Superintending Officer in writing <strong>of</strong> anyambiguity, discrepancy, conflict, inconsistency or omission in or between any <strong>of</strong> theContract documents that may at any time be found. The Superintending Officerins<strong>of</strong>ar as it may affect the execution or completion <strong>of</strong> the Works shall then explain<strong>and</strong> adjust it <strong>and</strong> may issue to the Contractor an instruction so as to resolve theambiguity, discrepancy, conflict, inconsistency or omission. If, in the opinion <strong>of</strong> theContractor, compliance with any such instruction is likely to or has involved theContractor in any Loss <strong>and</strong> Expense which could not have been reasonably <strong>for</strong>eseenby an experienced <strong>contract</strong>or (assuming a diligent perusal <strong>of</strong> the documents submittedprior to Contract), the Contractor shall <strong>for</strong>thwith notify the Superintending Officer inwriting <strong>and</strong> subject to compliance by the Contractor with Clauses 14, 23 <strong>and</strong> 32, theSuperintending Officer may grant an extension <strong>of</strong> time pursuant to Clause 14 <strong>and</strong> maycertify pursuant to Clause 32 such sum as may be reasonable in respect <strong>of</strong> such Loss<strong>and</strong> Expense.___________________________________________________________________________________Public Sector St<strong>and</strong>ard Conditions <strong>of</strong> Contract <strong>for</strong> Design <strong>and</strong> Build (Fifth edition December <strong>2008</strong>) 9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!