6.3 Submission <strong>of</strong> Documents after CompletionUpon the Date <strong>of</strong> Substantial Completion (or the latest Date <strong>of</strong> Substantial Completion if thereis more than one Date <strong>of</strong> Substantial Completion), the Contractor shall submit <strong>for</strong> theacceptance <strong>of</strong> the Superintending Officer operation <strong>and</strong> maintenance manuals together withDrawings <strong>of</strong> the Permanent Works <strong>design</strong>ed by the Contractor as completed in sufficient detailto enable the Employer to operate, maintain, dismantle, reassemble <strong>and</strong> adjust the PermanentWorks incorporating such <strong>design</strong>.6.4 Amendment <strong>and</strong> Modification <strong>of</strong> Accepted DesignThe Superintending Officer may instruct the Contractor at any time, be<strong>for</strong>e, during or after theexecution or completion <strong>of</strong> the Works to amend or modify the <strong>design</strong> provided by theContractor in respect <strong>of</strong> any deficiency <strong>of</strong> any kind or nature discovered by the SuperintendingOfficer <strong>and</strong> to carry out such work as is necessary to give effect to such amended or modified<strong>design</strong> in accordance with the Superintending Officer's instruction. All work necessary(including re-<strong>design</strong> work) or variations required as a result <strong>of</strong> such an instruction <strong>and</strong> theircosts shall be the entire responsibility <strong>of</strong> <strong>and</strong> shall be borne by the Contractor.7 NOTICES AND FEES7.1 GenerallyThe Contractor shall comply with <strong>and</strong> give notices required by any law, regulation or by-law,or by any <strong>public</strong> authority or <strong>public</strong> service company, relating to the Works or, in the case <strong>of</strong> a<strong>public</strong> authority or <strong>public</strong> service company, with whose systems the same are or will beconnected. The Contractor shall pay <strong>and</strong> indemnify the Employer against any fees or chargesimposed by law, regulation or by-law, or by any <strong>public</strong> authority or <strong>public</strong> service company inrespect <strong>of</strong> the Works.7.2 Variations Arising from ComplianceThe Contractor shall, be<strong>for</strong>e making any variation from the Contractor’s Proposals necessitatedby the compliance with Clause 7.1, give to the Superintending Officer notice in writingspecifying <strong>and</strong> giving the reasons <strong>for</strong> such variation <strong>and</strong> applying <strong>for</strong> instructions in referencethereto. Provided that if the Contractor does not receive instructions from the SuperintendingOfficer within 7 days from the date <strong>of</strong> the receipt <strong>of</strong> his application by the SuperintendingOfficer, he shall proceed with the Works con<strong>for</strong>ming to the law, regulation, by-law orrequirements <strong>of</strong> the <strong>public</strong> authority or <strong>public</strong> service company in question. Any variationnecessitated as a<strong>for</strong>esaid which could not have been reasonably <strong>for</strong>eseen by an experienced<strong>contract</strong>or at the time <strong>of</strong> submission <strong>of</strong> the Tender (<strong>and</strong> if it is not required by or inconsequence <strong>of</strong> any deficiency or fault in the <strong>design</strong>) shall be deemed a variation under Clause19 <strong>and</strong> dealt with as such.___________________________________________________________________________________Public Sector St<strong>and</strong>ard Conditions <strong>of</strong> Contract <strong>for</strong> Design <strong>and</strong> Build (Fifth edition December <strong>2008</strong>) 14

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!