12.07.2015 Views

public sector standard conditions of contract for design and build 2008

public sector standard conditions of contract for design and build 2008

public sector standard conditions of contract for design and build 2008

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

(g)Any notice <strong>of</strong> disagreement submitted by the Contractor in accordance withClause 20.2(2)(e) which is not dealt with or resolved by the SuperintendingOfficer's amendment in the next Payment Certificate shall be reconsideredby the Superintending Officer when the Superintending Officer issues theInterim Final Account in accordance with Clause 32.5(1) <strong>and</strong> (2).20.3 Provisional Sum ItemsWhere the Contractor is instructed by the Superintending Officer to execute or provide some orall <strong>of</strong> the Plant, materials, goods or work described as a Provisional Sum Item, the valuation <strong>of</strong>that instruction shall be made in accordance with Clause 20.1 (unless otherwise provided in theContract).20.4 Dayworks(1) The Superintending Officer may, if in his opinion it is necessary <strong>and</strong> desirable, orderin writing that any work to be carried out as a result <strong>of</strong> an instruction ordered underClause 19.2 shall be executed on a daywork basis.(2) The Contractor shall then be paid <strong>for</strong> such work at the daywork rates set out in theContract or if no such rates are available as provided, then at the rates determined bySuperintending Officer as prevailing when the work is actually carried out(3) It is a condition precedent to payment that the Contractor shall submit to theSuperintending Officer the daywork sheets specifying the number <strong>of</strong> man-hours spenton the work on a daily basis, <strong>and</strong> statement showing any Plant, ConstructionEquipment, material <strong>and</strong> goods necessary in respect <strong>of</strong> all works executed on adaywork basis <strong>for</strong> verification within 3 days after the work has been executed.(4) The Contractor shall in<strong>for</strong>m the Superintending Officer in advance whenever heproposes to carry out works on a daywork basis.___________________________________________________________________________________Public Sector St<strong>and</strong>ard Conditions <strong>of</strong> Contract <strong>for</strong> Design <strong>and</strong> Build (Fifth edition December <strong>2008</strong>) 32

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!