19.3 Submission <strong>of</strong> QuotationsThe Superintending Officer may, be<strong>for</strong>e issuing an instruction <strong>for</strong> any variation, require theContractor to submit a quotation <strong>for</strong> any proposed variation <strong>and</strong> the Contractor shall be obligedto submit such quotation in writing at his own cost. The Superintending Officer may be<strong>for</strong>e orafter issuing an instruction under Clause 19.2 accept in writing the Contractor's quotation <strong>and</strong>the provisions <strong>of</strong> Clause 20 shall not apply to the valuation <strong>of</strong> that variation nor shall theContractor be entitled to any Loss <strong>and</strong> Expense in respect <strong>of</strong> that instruction or any othercompensation, damages or other amount whatsoever other than a valuation made in accordancewith the accepted quotation. An instruction requiring a variation shall not be treated as anacceptance <strong>of</strong> any quotation.20 VALUATION OF VARIATIONS20.1 Valuation MethodsSubject to Clause 19.3, all variations shall be valued as follows:(a)(b)Where there is an increase or decrease in the scope <strong>of</strong> the Contractor’s <strong>design</strong> servicesfrom changes <strong>of</strong> whatever nature in the Employer’s Requirements, the SuperintendingOfficer shall assess the amount <strong>of</strong> <strong>design</strong> fee to be paid to the Contractor or recoveredfrom the Contractor, as the case may be, based on a percentage <strong>of</strong> the value <strong>of</strong> thevaried work as set out in the Appendix; orSubject to Clause 20.1(a) above,(i)(ii)Where the varied work is <strong>of</strong> a similar character to, is executed under similar<strong>conditions</strong> as <strong>and</strong> does not significantly change the quantity <strong>of</strong> workdescribed in the Contract, the Rates <strong>for</strong> the Works as set out in the Contractshall determine the valuation; orWhere the varied work is <strong>of</strong> similar character to work described in theContract but is not executed under similar <strong>conditions</strong> <strong>of</strong> such work describedin the Contract or involves significant changes in the quantity <strong>of</strong> such workdescribed in the Contract, the Rates <strong>for</strong> the Works as set out in the Contractshall be the basis <strong>for</strong> determining the valuation but with a fair allowance <strong>for</strong>any differences in such <strong>conditions</strong> <strong>and</strong>/or quantity; or(c)(d)Where (a) <strong>and</strong> (b) above do not apply, then by measurement <strong>and</strong> valuation at fairmarket rates <strong>and</strong> prices;Where none <strong>of</strong> the above methods is applicable or appropriate in the circumstances <strong>of</strong>the particular varied work, then the valuation shall be based on the cost <strong>of</strong> necessaryPlant, materials or goods labour <strong>and</strong> any additional equipment necessary <strong>for</strong> theexecution <strong>of</strong> the varied work plus 15 per cent. This percentage shall be deemed tocompensate adequately the Contractor in respect <strong>of</strong> all supervision, the use <strong>of</strong>Construction Equipment, overheads, pr<strong>of</strong>it <strong>and</strong> all other costs or damages incurred inor connected with the execution <strong>of</strong> the varied work;(e)The Rates <strong>for</strong> the Works as set out in the Contract shall determine the valuation <strong>of</strong>items omitted; provided that if omissions vary the <strong>conditions</strong> under which anyremaining items <strong>of</strong> work are carried out, the values <strong>for</strong> such remaining items shall bedetermined under Clauses 20.1(b) or (c) or (d) as the case may be.___________________________________________________________________________________Public Sector St<strong>and</strong>ard Conditions <strong>of</strong> Contract <strong>for</strong> Design <strong>and</strong> Build (Fifth edition December <strong>2008</strong>) 30

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!