(3) The inclusion by the Superintending Officer in any certificate under Clause 32 <strong>of</strong> anyamount in respect <strong>of</strong> any claim or any payment by the Employer in respect <strong>of</strong> anysuch amount shall not:(a)(b)prejudice the Employer’s right to dispute the Contractor's entitlement to theamount certified either in principle, or as to its quantification or fromreferring such dispute <strong>for</strong> decision pursuant to Clause 35; <strong>and</strong>be taken into account by the Superintending Officer or any arbitrator (orother tribunal) in deciding whether the Contractor shall repay to theEmployer the whole or any part <strong>of</strong> such amount.23.6 Failure to ComplyIf the Contractor shall have complied with Clause 23.1 but shall not have complied fully or atall with any <strong>of</strong> the provisions <strong>of</strong> Clause 23.2 to 23.4, the Superintending Officer shall beentitled to make such assessment, valuation or opinion as shall be reasonable on the basis <strong>of</strong> thein<strong>for</strong>mation available to him. If the Contractor should dispute such an assessment, valuation oropinion, such dispute shall be decided by the Superintending Officer or the arbitrator (or othertribunal) on the basis only <strong>of</strong> the in<strong>for</strong>mation available to the Superintending Officer at the timewhen he made his assessment, valuation or opinion <strong>and</strong> no account shall be taken <strong>of</strong> anyin<strong>for</strong>mation which the Contractor did not supply to the Superintending Officer, whether or nothe could have done so.24 CONSTRUCTION EQUIPMENT, TEMPORARY WORKS,MATERIALS AND GOODS24.1 Exclusive Use <strong>for</strong> the Works24.2 VestingAll Construction Equipment, Temporary Works, Plant, materials <strong>and</strong> goods provided by theContractor shall, when brought on to the Site, be deemed to be exclusively intended <strong>for</strong> theexecution <strong>of</strong> the Works <strong>and</strong> the Contractor shall not remove the same or any part <strong>of</strong> suchConstruction Equipment, Temporary Works, Plant, materials or goods except <strong>for</strong> the purpose<strong>of</strong> moving it from one part <strong>of</strong> the Site to another, without the consent in writing <strong>of</strong> theSuperintending Officer. Provided that consent shall not be required <strong>for</strong> vehicles engaged intransporting any staff, labour, Construction Equipment, Temporary Works, Plant, materials orgoods to <strong>and</strong> from the Site.All Construction Equipment, Temporary Works, Plant, materials <strong>and</strong> goods owned by theContractor, or by any company in which the Contractor has a controlling interest, shall, whenon the Site, be deemed to be the property <strong>of</strong> the Employer. Provided always that the vesting <strong>of</strong>such property in the Employer shall not prejudice the right <strong>of</strong> the Contractor to the sole use <strong>of</strong>the said Construction Equipment, Temporary Works, Plant, materials <strong>and</strong> goods <strong>for</strong> thepurpose <strong>of</strong> the Works nor shall it affect the Contractor's responsibility to operate <strong>and</strong> maintainthe same under the provisions <strong>of</strong> the Contract.___________________________________________________________________________________Public Sector St<strong>and</strong>ard Conditions <strong>of</strong> Contract <strong>for</strong> Design <strong>and</strong> Build (Fifth edition December <strong>2008</strong>) 36

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!