12.07.2015 Views

Installation Operation Maintenance

Installation Operation Maintenance

Installation Operation Maintenance

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Operation</strong>Final installation checklist- Is the condenser fan and indoorblower operating correctly, i.e.:correct rotation and without unduenoise?- Are the compressors operatingcorrectly and has the systemcharge been checked?- Has the gas module been installedas per the procedure in thismanual?- Have the voltage and runningcurrents been checked todetermine if they are within limits?- Have the air discharge grilles beenadjusted to balance the system?- Has the ductwork been checked forair leaks and any condensation?- Has the heating air temperaturerise been checked?- Has the indoor airflow beenchecked and adjusted if necessary?- Has the unit been checked fortubing and sheet metal rattles orany unusual noises?- Are all covers and panels in placeand properly fastened?To keep the unit operating safelyand efficiently, the manufacturerrecommends that a qualified servicetechnician check the entire systemat least once each year, or morefrequently if conditions warrant.RT-SVX16C-E453

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!