Installation Operation Maintenance
Installation Operation Maintenance
Installation Operation Maintenance
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
<strong>Installation</strong>General information: Theinstallation must conform to alllocal standards and regulations.Reception of unitsRooftop unitThe unit is supplied on woodenbeams. It is recommended to checkthe machine's condition uponreception.There are two ways to handle theunit:1) Handle the machine using aforklift, in accordance withapplicable safety regulations.2) Use a lifting beam correctlyadjusted to fit the unit (SeeFigure 1).Unit HandlingThe units are supplied on the truckbut are not unloaded. A lifting lug isprovided on each corner of theunit's base to facilitate handling.4 shackles and 4 slings are required.Use a lifting beam to prevent thecables pressing too hard on top ofthe unit during lifting. (SeeFigure 1).Important: For unit to fit on theroof curb the forklift pockets mustbe removed.Figure 1 - Unit handlingCMU (kg) OT800 1T100 1T100(mm) 16,0 18,0 20,0F (mm) 64,0 72,0 72,0A (mm) 30,0 35,0 35,0C (mm) 31,0 41,0 41,0B (mm) 64,0 78,0 78,0E (mm) 18,0 19,5 19,5G (mm) 48,0 59,0 59,0Weight (kg) 0,480 0,960 0,960RT-SVX16C-E47