An Advanced Approach to Fitness-For-Service (FFS) and Corrosion ...
An Advanced Approach to Fitness-For-Service (FFS) and Corrosion ...
An Advanced Approach to Fitness-For-Service (FFS) and Corrosion ...
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Immediate Integrity Assessment<br />
• Assessment Pressure: MAOP 850 psi<br />
• The corrosion anomalies were assessed:<br />
– <strong>to</strong> Modified B31G in terms of their axial dimensions<br />
– <strong>An</strong>omalies that require repair within 5 years have also<br />
been assessed <strong>to</strong> Detailed RSTRENG<br />
– Kastner in terms of circumferential dimensions<br />
• The manufacturing <strong>and</strong> girth weld features were assessed <strong>to</strong><br />
Shannon <strong>and</strong> Kastner<br />
• <strong>An</strong>omalies require repair if:<br />
– Their reported dimensions exceed the size <strong>to</strong>lerable at the<br />
MAOP x safety fac<strong>to</strong>r (1.39); or<br />
– Their maximum reported depths exceed 80% wt.<br />
• The assessment has been conducted allowing for <strong>to</strong>ol depth<br />
sizing <strong>to</strong>lerances