DOT 49CFR195 High Consequence Area Requirements<br />

Immediate Repair<br />

• Calculation of the remaining strength of the pipe (using ASME/ANSI B31G;<br />

RSTRENG) shows a predicted burst pressure less than the established maximum<br />

operating pressure at the location of the anomaly.<br />

• In addition any metal loss greater than 80% wt is also considered <strong>to</strong> be an<br />

immediate repair regardless of the feature dimensions.<br />

180 – Day Conditions<br />

• Calculation of the remaining strength of the pipe shows an operating pressure<br />

that is less than the current established maximum operating pressure at the<br />

location of the anomaly. <strong>For</strong> this pipeline this has been calculated by assuming<br />

that the pipeline is operating at 72% SMYS resulting in a safety fac<strong>to</strong>r of 1.39.<br />

• <strong>An</strong> area of general corrosion with a predicted metal loss greater than 50% wt.<br />

• Predicted metal loss greater than 50% of nominal wall that is located at a<br />

crossing of another pipeline, is in an area with widespread circumferential<br />

corrosion, or is in an area than could affect a girth weld.<br />

• <strong>Corrosion</strong> of, or along a longitudinal seam weld.<br />

To maintain safety prior <strong>to</strong> any immediate repairs an opera<strong>to</strong>r must temporarily<br />

reduce the operating pressure or shut down the pipeline until the opera<strong>to</strong>r<br />

completes these repairs.<br />

On the basis of the above, 1 external feature requires immediate repair <strong>and</strong> 12<br />

external features require remediation within 180 days of the date of discovery.