Rehabilitation Strategy<br />

• Conduct Sectional Repairs/re-coating<br />

• Complete planned mitigation measures<br />

– Replacement of the depleted ground bed at start of pipeline<br />

– Installment of a rectifier <strong>and</strong> deep well ground bed at 25<br />

miles or recoating of the last 5 miles of the pipeline<br />

– It is noted that if coating disbondment is a particular issue in<br />

this area, then either sectional replacement or recoating of<br />

the pipeline would be required <strong>to</strong> control the corrosion<br />

• Conduct re-inspection in 3 years, this will:<br />

– Ensure any further areas of coating disbondment are<br />

identified<br />

– Enable confirmation of external corrosion growth rates<br />

predicted here<br />

– Confirm the effectiveness of any planned mitigation<br />

measures<br />

– Ultimately assist in reducing the numbers of repairs required<br />

in subsequent years