01.12.2012 Views

An Advanced Approach to Fitness-For-Service (FFS) and Corrosion ...

An Advanced Approach to Fitness-For-Service (FFS) and Corrosion ...

An Advanced Approach to Fitness-For-Service (FFS) and Corrosion ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

Pipeline Summary<br />

• 12” x 30 mile refined product pipeline.<br />

• Constructed in 1975 from seamless pipe.<br />

• API 5L Grade X42.<br />

• The nominal wall thickness varies from 0.188” <strong>to</strong> 0.322”.<br />

• Reported Maximum Operating Pressure (MOP) is 850 psi.<br />

• Tar Tape Wrap Coating.<br />

• Impressed current CP system.<br />

• Inspected in 2009 by ROSEN (CDX) <strong>and</strong> in 2006 by ROSEN<br />

(CDP & EGP).

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!