12.07.2015 Views

ERTMS/ETCS future train control

ERTMS/ETCS future train control

ERTMS/ETCS future train control

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

European Rail Traffic Management System<strong>ERTMS</strong>/<strong>ETCS</strong>/GSM-RMigration from INDUSI/PZB to <strong>ETCS</strong> Level 1•Decision of the ÖBB Board in September2001:•Installation of <strong>ETCS</strong> level 1 in the A-network(2475 km)EURAIL FORUM San Sebastian 9 June 2004

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!