12.07.2015 Views

Fremantle Port Inner Harbour and Channel ... - Fremantle Ports

Fremantle Port Inner Harbour and Channel ... - Fremantle Ports

Fremantle Port Inner Harbour and Channel ... - Fremantle Ports

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Table 2.2AuditCode801:M1.1801:M2.1801:M2.2Audit tableSubject Action How Evidence Satisfy Advice Phase When Status Ref.ProposalImplementationProponentNomination <strong>and</strong>Contact DetailsProponentNomination <strong>and</strong>Contact DetailsThe proponent shall implement the proposal asdocumented <strong>and</strong> described in schedule 1 of thisstatement subject to the conditions <strong>and</strong> proceduresof this statementThe proponent for the time being nominated by theMinister for Environment under sections 38(6) or38(7) of the Environmental Protection Act 1986 isresponsible for the implementation of the proposalThe proponent shall notify the Chief ExecutiveOfficer of the Department of Environment <strong>and</strong>Conservation (CEO) of any change of the name <strong>and</strong>address of the proponent for the serving of noticesor other correspondence within 30 days of suchchange.Project implemented as describedin StatementProponent nominated toimplement the proposalWritten adviceAnnual ComplianceAssessment ReportProponent detailsas listed onMinisterialStatement 801Letter to CEOnotifying of changeof contact name<strong>and</strong> addressMin for EnvMin for EnvCEOOverallOverallOverallFor the life of theProposalFor the life of theProposalWithin 30 days of suchchange.Completed.Proposal implemented. See statusof conditions below.Completed.Proponent is <strong>Fremantle</strong> <strong>Port</strong>s aslisted on Ministerial Statement801.Satisfactory during this period.No change in proponent.801:M3.1Time Limit ofAuthorisationThe authorisation to implement the proposalprovided for in this statement shall lapse <strong>and</strong> bevoid five years after the date of this statement if theproposal to which this statement relates is notsubstantially commencedWritten adviceComplianceAssessmentReports, writtennotificationMin for EnvOverallCommenced by 18August 2014CompletedProposal was commenced withinfive years.Section 1.1801:M3.2801:M4.1801:M4.2801:M4.3Time Limit ofAuthorisationComplianceReportingComplianceReportingComplianceReportingThe proponent shall provide the CEO with writtenevidence which demonstrates that the proposal hassubstantially commenced on or before the expirationof five years from the date of this statementThe Proponent shall prepare <strong>and</strong> maintain aCompliance Assessment Plan to the satisfaction ofthe CEOThe Proponent shall submit to the CEO, theCompliance Assessment Plan required by Condition4.1 within 6 months of the date of this StatementThe Proponent shall assess compliance withconditions in accordance with the ComplianceAssessment Plan required by Condition 4.1Written advicePrepare Compliance AssessmentPlanThe Compliance Assessment Planshall indicate: 1. the frequency ofcompliance reporting; 2. theapproach <strong>and</strong> timing ofcompliance assessments; 3. theretention of complianceassessments; 4. reporting ofnon-compliances <strong>and</strong> correctiveactions taken; 5. the table ofcontents of ComplianceAssessment Reports; <strong>and</strong> 6.public availability of compliancereports.Follow Compliance AssessmentPlan when assessing complianceLetter to CEO ofOEPA outliningsubstantialcommencementComplianceAssessment PlanComplianceAssessment PlanComplianceAssessmentReportsDECCEOCEOOverallDesignCEO Overall AnnuallyWithin one month ofcommencementFor the life of theProposalWithin 6 months of thedate of this Statement.That is by 18 February2010CompletedLetter sent 5 February 2010 <strong>and</strong>approved 11 March 2010.CompletedCompliance Assessment Planprepared, maintained <strong>and</strong>approved (18 March).CompletedDraft Compliance Assessment Plansubmitted to OEPA 16 February2010, <strong>and</strong> approved 18 March.Completed.This Compliance AssessmentReport assesses complianceagainst the ComplianceAssessment Plan.ComplianceAssessmentReport: Phase 1(Oceanica 2010b)This document801:M4.4ComplianceReportingThe Proponent shall retain reports of all complianceassessments described in the ComplianceAssessment Plan required by Condition 4.1 <strong>and</strong> shallmake those reports available when requested by theCEOCompliance Assessment Reportswill be placed on <strong>Fremantle</strong> <strong>Port</strong>swebsiteReports on website CEO OverallWhen requested of theCEOCompletedCompliance Assessment Report:Phase 1 (Oceanica 2010b) madeavailable to the CEO <strong>and</strong> placed on<strong>Fremantle</strong> <strong>Port</strong>s website.Compliance Assessment Report:Phase 2 (Oceanica 2011) madeavailable to the CEO <strong>and</strong> placed on<strong>Fremantle</strong> <strong>Port</strong>s website.ComplianceAssessmentReport: Phase 1(Oceanica 2010b)ComplianceAssessmentReport: Phase 2(Oceanica 2011)Compliance Assessment Report:2012 (Oceanica 2012) madeavailable to the CEO.ComplianceAssessmentReport: 2012(Oceanica 2012)801:M4.5ComplianceReportingThe Proponent shall advise the CEO of any noncomplianceas soon as practicableA letter describing the noncompliancewill be sent to theCEO of OEPALetter to CEO ofOEPACEOOverallWithin 72 hours of anon-compliance beingidentified (subsequent toprocessing of data)Completed.There have been no noncomplianceswith the conditions ofMinisterial Statement 801 asspecified by this audit table todate.This TableOceanica: <strong>Fremantle</strong> <strong>Port</strong>s: <strong>Fremantle</strong> <strong>Port</strong> <strong>Inner</strong> <strong>Harbour</strong> <strong>and</strong> <strong>Channel</strong> Deepening, Compliance Assessment Report 2013 5

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!