12.07.2015 Views

Nam Theun 2 Trip Report and Project Update - BankTrack

Nam Theun 2 Trip Report and Project Update - BankTrack

Nam Theun 2 Trip Report and Project Update - BankTrack

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Nam</strong> <strong>Theun</strong> 2 <strong>Trip</strong> <strong>Report</strong> <strong>and</strong> <strong>Project</strong> <strong>Update</strong>NAM THEUN 2: At a GlanceLOCATION:Central Laos, primarily inKhammouane province<strong>Nam</strong> KadingVIETNAMSTRUCTURE:• 39 meter high dam onthe <strong>Nam</strong> <strong>Theun</strong>• 450 square kilometerreservoir on the NakaiPlateau• After passing througha powerhouse belowthe Nakai Plateau,water from the reservoiris diverted to theXe Bang Fai via a 27kilometer downstreamchannelOUTPUT:• 1070 MW of power,more than 90% exportedto Thail<strong>and</strong>• Power productionscheduled to begin inDecember 2009THAILANDSPONSORS:<strong>Nam</strong> <strong>Theun</strong> 2 Power Company (NTPC): Electricitéde France International (35%), the ElectricityGenerating Company of Thail<strong>and</strong> (25%), LaoHolding State Enterprise (25%) <strong>and</strong> Ital-ThaiDevelopment (15%)HEAD CONSTRUCTION CONTRACTOR:Electricité de France<strong>Nam</strong> Hinboun0 10 20 30 40 50kmMekong River<strong>Theun</strong>HinbounDamo Thakek<strong>Nam</strong> <strong>Theun</strong><strong>Nam</strong><strong>Theun</strong> 2Dampower stationdownstreamchannelXe Bang FaiNakai PlateaureservoirLAO PDRMAIN SOCIAL AND ENVIRONMENTAL IMPACTS:> 6,200 indigenous peoples forcibly resettledfrom reservoir area on Nakai Plateau; elephant<strong>and</strong> other wildlife <strong>and</strong> wetl<strong>and</strong>s habitat flooded> 120,000 downstream villagers affected byincreased water flows in Xe Bang Fai, <strong>and</strong> dramaticallydecreased flows in <strong>Nam</strong> <strong>Theun</strong>; majorfisheries <strong>and</strong> aquatic resources losses, erosion,flooding, sedimentation along the Xe Bang Fai> 2,000 households affected by NT2 constructionactivities, losing l<strong>and</strong>, assets, access to resources;water quality impacts, erosion, sedimentation,logging in construction areas10

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!