12.07.2015 Views

Nam Theun 2 Trip Report and Project Update - BankTrack

Nam Theun 2 Trip Report and Project Update - BankTrack

Nam Theun 2 Trip Report and Project Update - BankTrack

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Nam</strong> <strong>Theun</strong> 2 <strong>Trip</strong> <strong>Report</strong> <strong>and</strong> <strong>Project</strong> <strong>Update</strong>The Concession Agreement signed by NTPC <strong>and</strong> theGoL requires that a biomass survey be conducted <strong>and</strong>used to propose means for “maximising removal of biomassin high biomass areas of the Nakai Reservoir. Thepriority shall be to clear the vegetation in areas whichwill be permanently flooded” (Schedule 4, Part 2,Section 3a). The Concession Agreement also requiresthat “... water in the Downstream Channel must atleast be suitable for irrigation purposes” (Schedule 4,Part 2, Section 9.1f ).Despite these Failure to clear biomasscommitments,will cause water qualityapproved by theWorld Bank, problems downstream.the ADB <strong>and</strong>NT2’s otherfunders, neither the GoL nor NTPC has plans toremove or ensure the maximum removal of biomassfrom the reservoir. NTPC says it is conducting a studyon water quality optimization during reservoirimpoundment <strong>and</strong> that “biomass clearance may be partof the answer.” According to NTPC, it has no obligationto clear biomass except where it may impact itsprograms.There is one dry season remaining before reservoirimpoundment <strong>and</strong> it is unclear what options are leftfor maximizing biomass clearance from such a largearea in such a short period of time. The time for studies<strong>and</strong> debate is over, <strong>and</strong> action must be takenurgently to avoid downstream disaster.Recommendations:■ NTPC <strong>and</strong> the GoL should commit to clear biomassfrom at least all permanently flooded areas of theNT2 reservoir.■ NTPC <strong>and</strong> the GoL should implement an independentlyreviewed clearance plan <strong>and</strong> impoundmentstrategy to minimize downstream water quality problemsin the first years of NT2 operations.NT2 downstream channel. Photo by Henrik Lindholm, SwedWatch.18

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!