12.07.2015 Views

Nam Theun 2 Trip Report and Project Update - BankTrack

Nam Theun 2 Trip Report and Project Update - BankTrack

Nam Theun 2 Trip Report and Project Update - BankTrack

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Nam</strong> <strong>Theun</strong> 2 <strong>Trip</strong> <strong>Report</strong> <strong>and</strong> <strong>Project</strong> <strong>Update</strong>The primary compensation strategy in <strong>and</strong> aroundthe Gnommalath Plain is the provision of replacementl<strong>and</strong> by using the Regulating Pond <strong>and</strong>Downstream Channel as the source of irrigationwater for: (i) transforming rainfed paddy into irrigatedpaddy; (ii) bringing new l<strong>and</strong> into irrigated production;(iii) resorting irrigation facilities directlyimpacted by the project; <strong>and</strong> (iv) the development offish ponds (SDP, Vol 4, Ch. 7, p.16, emphasis added).In its October 2006 report, the Panel of Experts citedthe 2006 Resettlement Action Plan’s belated conclusionthat NT2’s power production regime results in anunpredictable downstream channel flow, “making planningfor irrigation difficult <strong>and</strong> unreliable” (PoE, 10th<strong>Report</strong>, p. 28).Furthermore, considering the absence of any biomassclearance plans for the reservoir area, the water in thedownstream channel is likely to be of extremely poorquality <strong>and</strong> unsuitable for irrigation for at least severalyears beyond 2009. As mentioned previously, this violatesthe Concession Agreement which requires that“... water in the Downstream Channel must at least besuitable for irrigation purposes” (Schedule 4, Part 2,Section 9.1f ).Recommendations:NT2 transmission lines. Photo by Shannon Lawrence, IRN.which they determine that no replacement l<strong>and</strong> isavailable for <strong>Project</strong> L<strong>and</strong>s villagers.Additionally, the 2005 NT2 Social Development Planincludes seven pages that detail plans for using thedownstream channel <strong>and</strong> regulating pond to provideirrigation to affected villages in the area. Downstreamchannel irrigation was a key benefit of the <strong>Nam</strong> <strong>Theun</strong>2 project touted at the time of its approval by funderssuch as the World Bank <strong>and</strong> the ADB. The SocialDevelopment Plan states:■ The Independent Monitoring Agency for theResettlement Management Unit (RMU) shouldurgently undertake a comprehensive review of<strong>Project</strong> L<strong>and</strong>s compensation <strong>and</strong> mitigation measures<strong>and</strong> publicly disclose its findings.■ NTPC <strong>and</strong> the GoL should: 1) urgently find comparablereplacement l<strong>and</strong> for <strong>Project</strong> L<strong>and</strong>s villagers,<strong>and</strong> 2) detail the livelihood restoration options thatwill replace irrigation for significantly affected<strong>Project</strong> L<strong>and</strong>s villagers.■ NTPC, the GoL, the World Bank <strong>and</strong> the ADBshould ensure immediate disclosure of theResettlement Action Plans (RAPs) for <strong>Project</strong>L<strong>and</strong>s. 1522

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!