12.07.2015 Views

Nam Theun 2 Trip Report and Project Update - BankTrack

Nam Theun 2 Trip Report and Project Update - BankTrack

Nam Theun 2 Trip Report and Project Update - BankTrack

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Nam</strong> <strong>Theun</strong> 2 <strong>Trip</strong> <strong>Report</strong> <strong>and</strong> <strong>Project</strong> <strong>Update</strong>Detailed Concerns <strong>and</strong> RecommendationsXe Bang Fai Downstream Program■ Implementation of NTPC’s Downstream Livelihood <strong>and</strong> Asset Restoration Pilot Program has only recentlybeen initiated in 21 villages, which constitutes less than 10% of the downstream villages that will be affectedwhen NT2 operations begin in 2009.■ The Downstream Program plan has not been disclosed to the public, despite World Bank <strong>and</strong> ADB policyrequirements.■ NTPC says it is planning for the worst-case scenarioalong the Xe Bang Fai, which means 85% fish losses,increased high frequency floods, erosion, major waterquality problems, <strong>and</strong> transportation difficulties fordownstream villages. However, the DownstreamProgram budget is only $16 million, of which more than$1 million will be spent on consultants. 3 Using NTPC’sfigure of 75,000 affected people (versus the 120,000affected people identified by independent experts 4 ), only$200 per person is available to compensate <strong>and</strong> mitigatefor all these long-term livelihood impacts. Villagers toldIRN that their main priorities were flood protection <strong>and</strong>irrigation, but NTPC has reportedly told villagers thereis not enough money for these measures.■ The primary livelihood restoration pilot projects—livestockraising, fish ponds <strong>and</strong> cash crops using a microcreditvillage savings fund, as well as water <strong>and</strong> sanitationimprovements—are inadequate to deal with thescale of impacts that villagers will face. Some peoplewere having trouble selling their vegetables, the pigsthey purchased had died, <strong>and</strong> they couldn’t pay backtheir loans to the village savings fund. The reliance onthe micro-credit scheme to deliver compensation createsa cycle of debt if projects fail.Recommendations:■ NTPC should commit to develop <strong>and</strong>implement an interim compensationscheme to address the impacts of NT2operations on downstream villagersuntil livelihood restoration programsyield sustainable results. Additionalfunding will be required, as the $16million budget is likely to be inadequateto deal with the scale of anticipateddownstream impacts.■ The GoL, World Bank <strong>and</strong> ADB shouldwork with villagers <strong>and</strong> donor partnersto develop an integrated rural developmentplan for the Xe Bang Fai region.■ NTPC, the GoL, the World Bank <strong>and</strong> theADB should ensure disclosure of: 1) theDownstream Livelihood <strong>and</strong> AssetRestoration Program Phase 1 in itsentirety; 2) marketing surveys for theXe Bang Fai; 3) biomass clearance plans<strong>and</strong> for the Nakai Plateau; <strong>and</strong> 4)hydraulics <strong>and</strong> water quality studies forthe downstream areas.4

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!