12.07.2015 Views

TAB-7 - Islamorada, Village of Islands

TAB-7 - Islamorada, Village of Islands

TAB-7 - Islamorada, Village of Islands

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Islamorada</strong>, <strong>Village</strong> <strong>of</strong> <strong>Islands</strong>Monthly Program Report, Period: 2/25/13 to 3/30/13Wastewater Collection & Transmission ProjectWork PhaseDescriptionDeliveryMethodDesign StatusEstimatedConstructionStatusLandAcquisitionStatusEasementStatusSummary <strong>of</strong> ProgressUpper MatecumbeForce MainDesign / Build /OperateRevised PDRSubmitted0% Ongoing OngoingAnticipate RWI 30% design submittalApril 2013.Lower MatecumbeCollection Systemand Vacuum PumpStationDesign / Build /Operate30% DesignSubmitted for theVPS0% Ongoing Ongoing30% design submittal for the VPSreturned to RWI on March 4, 2013.Lower MatecumbeForce MainDesign / Build /OperateRevised PDRSubmitted0% Ongoing OngoingAnticipate RWI 30% submittal June2013.KLWTD Meters,SCADA, Telemetry Design / Build /and Design OperateCoordinationRevised PDRSubmitted0% Ongoing N/AORT comments on re-submitted PDRwere provided to RWI.Pavement OverlayProgram for NPK Design / Build /and MPK (Change OperateOrder No. 1)Submit DraftPavement OverlayInvestigation andDesign0% N/A N/AThe draft Investigation and DesignReport was returned to RWIon April 3, 2013.6.2 North Plantation Key (NPK)Vacuum main and vacuum pit installation has been completed, tested, and accepted for service by theFDEP. Asphalt milling and patching <strong>of</strong> the vacuum and gravity sewer trenches along South GardeniaStreet has been completed.North Plantation Key – Testing <strong>of</strong> aVacuum PitPage | 11 April 2013

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!