12.07.2015 Views

TAB-7 - Islamorada, Village of Islands

TAB-7 - Islamorada, Village of Islands

TAB-7 - Islamorada, Village of Islands

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Islamorada</strong>, <strong>Village</strong> <strong>of</strong> <strong>Islands</strong>Monthly Program Report, Period: 2/25/13 to 3/30/13Wastewater Collection & Transmission Project3.3.2 Design Management ServicesReceived several design packages over the period. Set up and monitored design submittals andreview schedules, prepared design review assignments, and produced consolidated sets <strong>of</strong> commentsfor each design review. Key tasks performed this period include the following: Reviewed the 60% design drawings for the Conveyance Force Main Phase 1.B which willcomplete the work along US-1 in Key Largo. Reviewed the 30% design drawings for the Middle Plantation Key Low Pressure Force Main. Reviewed the 30% design drawings <strong>of</strong> the South Plantation Key vacuum collection system. Reviewed the 30% design drawings <strong>of</strong> the Windley Key Low Pressure Force Main. Received and began review <strong>of</strong> the 60% design drawings for the North Plantation Key Re-PumpStation. Continued the redesign <strong>of</strong> the MPK vacuum pump station to the proposed location on MonroeCounty’s DPW property.3.3.3 Construction Management ServicesWeekly Construction Progress Meetings have occurred with the ORT, <strong>Village</strong>, and DBO Contractor.Work within Middle Plantation Key, North Plantation Key, and Fontaine Drive continues. The ORT hasinspected vacuum line installation in MPK, NPK, Fontaine Drive, and the CFM 1.A work within KeyLargo. Other key tasks performed this period include the following: Received and processed 30 new technical submittals, and reviewed and provided responses to28 technical submittals. Received and processed 5 new Requests <strong>of</strong> Information (RFI), and reviewed and providedresponses to 4 RFIs.There are currently nine FDOT projects the ORT is coordinating between the DBO Contractor andFDOT. The table below highlights the status <strong>of</strong> the Utility Work Schedules (UWS) being prepared forFDOT.FDOT Permit StatusFDOT Project Submitted to Approved byNumberFDOTFDOTComments432276-1 March 2013 March 2013 Letter <strong>of</strong> “No-conflict” instead <strong>of</strong> UWS425600-2 February 2013 Pending FDOT reviewing425600-3 March 2013 April 2013 Completed425600-6 March 2013 Pending FDOT reviewing425600-8 October 2012 March 2013 Completed425600-9 October 2012 March 2013 Completed425717-1 FDOT plans not yet available419848-1 March 2013 Pending FDOT reviewing419859-1 September 2012 September 2012 CompletedPage | 5 April 2013

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!