12.07.2015 Views

TAB-7 - Islamorada, Village of Islands

TAB-7 - Islamorada, Village of Islands

TAB-7 - Islamorada, Village of Islands

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>Islamorada</strong>, <strong>Village</strong> <strong>of</strong> <strong>Islands</strong>Monthly Program Report, Period: 2/25/13 to 3/30/13Wastewater Collection & Transmission Project1.0 INTRODUCTIONThe State <strong>of</strong> Florida, as part <strong>of</strong> Chapter 380 <strong>of</strong> 2010 Florida Statutes, identified the Florida Keys as anarea <strong>of</strong> critical concern to land and water management. The associated Administration CommissionRule requires installing a sanitary sewer system to meet advanced wastewater treatment for thecommunity by December 2015. <strong>Islamorada</strong>, <strong>Village</strong> <strong>of</strong> <strong>Islands</strong> (<strong>Village</strong>) procured the services <strong>of</strong> aDesign-Build-Operate (DBO) firm to perform all services required to bring a fully functional wastewatersystem into operation.The Project involves the design, construction and 20 year operation <strong>of</strong> a <strong>Village</strong>-wide wastewatercollection and transmission system using vacuum sewer and low pressure technology. Wastewater flowwill be transmitted to the Key Largo Wastewater Treatment District (KLWTD) wastewater treatmentplant for treatment and disposal. Phases <strong>of</strong> the Work will be delivered via two methods: Contractordesign/build/operate and Contractor build/operate. <strong>Islamorada</strong>, <strong>Village</strong> <strong>of</strong> <strong>Islands</strong> (the <strong>Village</strong>) holdscontracts with:Reynolds Water <strong>Islamorada</strong> (RWI) - Design Build Operate (DBO) ContractorWade Trim and Weiler Engineering- Owner’s Representative Team (ORT).The DBO scope <strong>of</strong> work included is as follows: Interim Operation and Maintenance <strong>of</strong> existing North Plantation Key (NPK) WastewaterTreatment Plant and Collection Systems. Decommissioning <strong>of</strong> existing NPK Wastewater Treatment Plant. Build/Operate NPK Vacuum Sewer Improvements, Middle Plantation Key (MPK) CollectionSystem and Vacuum Pump Station Improvements, and NPK Fontaine Road Collection Systemusing issued plans and specifications. Design/Build/Operate South Plantation Key Collection System and Vacuum Pump Station,Windley Key Collection System, Upper Matecumbe Key Collection System and Vacuum PumpStation, and Lower Matecumbe Key Collection System and Vacuum Pump Station. Design/Build/Operate transmission mains to the KLWTD.The contract Notice to Proceed (NTP) was issued to RWI on September 28, 2012 and has a term <strong>of</strong>1,174 days for the Design-Build elements <strong>of</strong> the contract.The <strong>Village</strong> has engaged in an Owner’s Representative to assist in managing the DBO Project. TheORT provides pr<strong>of</strong>essional engineering services as described in their Work Authorization No. 10,effective May 1, 2012 through December 31, 2015. The four (4) primary pr<strong>of</strong>essional services include:Owner’s Representative ServicesDesign Management ServicesConstruction Management ServicesProject Controls Management ServicesPage | 1 April 2013

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!