12.07.2015 Views

TAB-7 - Islamorada, Village of Islands

TAB-7 - Islamorada, Village of Islands

TAB-7 - Islamorada, Village of Islands

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Islamorada</strong>, <strong>Village</strong> <strong>of</strong> <strong>Islands</strong>Monthly Program Report, Period: 2/25/13 to 3/30/13Wastewater Collection & Transmission ProjectORT Budget SummaryServicesAmount Expended Amount ExpendedThis PeriodTo DateOwner’s Representative Service $24,532.25 $177,262.95Design Management Services $112,613.75 $308,849.99Construction Management Services $163,411.25 $695,160.50Project Controls Management Services $52,590.50 $230,091.00Totals $353,147.75 $1,411,364.44ORT fees for this reporting period trended upward from last period in order to properly cover the workthat required completion. Effort contributing to the upward trend included: 1) the effort required to redesignthe Middle Plantation Key Vacuum Pump Station to site the structure on a parcel <strong>of</strong> propertyowned by Monroe County; 2) the effort required to cover the increase in design submittals that werereceived and reviewed during the period; 3) the effort required to cover the field inspection due to theincreased level <strong>of</strong> construction activity during the period. This reporting period also covered a five-weekperiod, longer than the typical four-week reporting periods that have been evident. It is anticipated thateffort covering the next period should trend downward due to the expected completion <strong>of</strong> the MiddlePlantation Key Vacuum Pump Station re-location work in early April 2013 as well as going back to afour-week reporting period.3.3 Owner’s Representative Tasks Performed this PeriodDuring the reporting period, the ORT has performed various tasks under the four primary pr<strong>of</strong>essionalservices categories discussed earlier. A summary <strong>of</strong> the major tasks being worked on or completedduring this reporting period are summarized below.3.3.1 Owner’s Representative ServicesSeveral coordination meetings and discussions have taken place during the period between the ORT,<strong>Village</strong> staff, and DBO Contractor. On February 28, 2013, the monthly Project Status Meeting was heldbetween the ORT, <strong>Village</strong>, and DBO Contractor to review project progress and to discuss and resolvecurrent issues facing the project. Key tasks accomplished during the period under this category include: Monthly Report for period January 28, 2012 through February 24, 2013 was completed anddistributed at the March 28, 2013, <strong>Village</strong> Council Meeting. Prepared for and attended the February 27, 2013 Sewer Connection and AbandonmentWorkshop hosted by the FDEP and <strong>Village</strong> staff for package wastewater plant owners andcommercial property owners. Prepared for and attended the March 5, 2013 South Plantation Key Residents’ meeting toreview the 30% design drawings for the area’s collection system. Prepared for and attended the March 21, 2013 Windley Key Residents’ meeting to review the30% design drawings for the area’s collection system. Chaired a Wastewater Utility Policy review meeting with <strong>Village</strong> staff and the <strong>Village</strong> Attorney toreview the current document and develop action items to complete the Wastewater Utility Policyfor <strong>Village</strong> Council review at a future <strong>Village</strong> Council Meeting.Page | 4 April 2013

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!