<strong>Islamorada</strong>, <strong>Village</strong> <strong>of</strong> <strong>Islands</strong>Monthly Program Report, Period: 2/25/13 to 3/30/13Wastewater Collection & Transmission Project6.3 Middle Plantation Key and Fontaine DriveAt North MPK, installation <strong>of</strong> vacuum main pipe and vacuum pits are complete along Indian MoundTrail, Seminole Boulevard, Iroquois, Mohawk, Sioux, Pueblo, Navajo, and Apache Streets. Pretrenchingfor vacuum pipe continued along Tequesta and Caloosa Streets. Service lead relocationrequests by homeowners continue to be implemented by RWI.At MPK South, trenching and installation <strong>of</strong> vacuum pipe, most vacuum pits, and service stub-outs havebeen completed along Monroe, Cocoa, Sebring, Ocala, Tampa, Orlando, Key Heights Drive, HighPoint, Rolling Hills, and North Rolling Hills. Trenching for sewer main and vacuum pits continued alongAirstream Lane and <strong>Village</strong> Street.Installation <strong>of</strong> vacuum sewer, vacuum pits, laterals, and most <strong>of</strong> the punch-list items have beencompleted at Fontaine Drive. Final testing <strong>of</strong> the system is currently underway.Middle Plantation Key - Installation <strong>of</strong> Vacuum Pit and Cleaning Prior to Testing6.4 Key Largo Conveyance Force Main (CFM1.A)Installation <strong>of</strong> open-cut conveyance force main pipe in the US-1 right-<strong>of</strong>-way was completed this month.Work continues on the directional bore component <strong>of</strong> the force main. Restoration <strong>of</strong> curbs, asphaltpavement, and sod is underway. Heavy traffic volumes along US-1 required RWI to transition to nighttime work for work impacting traffic lanes.Page | 12 April 2013
<strong>Islamorada</strong>, <strong>Village</strong> <strong>of</strong> <strong>Islands</strong>Monthly Program Report, Period: 2/25/13 to 3/30/13Wastewater Collection & Transmission ProjectKey Largo Conveyance Force Main - DirectionDrilling <strong>of</strong> CFM at MM 99.6Key Largo Conveyance Force Main - RestrainedVertical Bend to Address Conflicts with ExistingUtilityKey Largo Conveyance Force Main - Trenching andInstalling Force MainPage | 13 April 2013
- Page 1 and 2: Islamorada,Village of IslandsWastew
- Page 3 and 4: Islamorada, Village of IslandsMonth
- Page 5 and 6: Islamorada, Village of IslandsMonth
- Page 7 and 8: Islamorada, Village of IslandsMonth
- Page 9 and 10: Islamorada, Village of IslandsMonth
- Page 11 and 12: Islamorada, Village of IslandsMonth
- Page 13: Islamorada, Village of IslandsMonth
- Page 17 and 18: Islamorada, Village of IslandsMonth
- Page 32: Islamorada, Village of IslandsMonth
- Page 45: Islamorada, Village of IslandsMonth
- Page 62: Islamorada, Village of IslandsMonth