12.07.2015 Views

180 Brockley Road SE4 PDF 306 KB - Council meetings

180 Brockley Road SE4 PDF 306 KB - Council meetings

180 Brockley Road SE4 PDF 306 KB - Council meetings

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

monitoring of pollutant linkages, maintenance and arrangements forcontingency action.Any changes to these components require the express written consent ofthe local planning authority. The scheme shall be implemented asapproved.Reason:To ensure any contamination resulting from previous uses of the site isaddressed in accordance with NPPF. To protect groundwater within theunderlying Principal Aquifer, which falls in Source Protection Zone 1 of apublic water supply.(2) Environmental Management PlanNo development shall commence on site (including demolition works) untilsuch time as an Environmental Management Plan has been submitted toand approved in writing by the local planning authority, which shall include,but is not limited to the following items: -• Dust mitigation measures.• Measures to mitigate against noise and air quality impacts associatedwith site preparation, demolition, earthworks, materials handling andstorage, vehicles and plant, construction and fabrication and waste.• Methods of monitoring construction impacts (noise and air quality).• Training of Site Operatives and ensuring the chosen contractorsubscribes to the ‘Considerate Contractors’ scheme.• The location of plant and wheel washing facilities and the operation ofsuch facilities.• Details of measures to be employed to mitigate against noise andvibration arising out of the construction process.• Construction traffic details (volume of vehicle movements likely to begenerated during the construction phase including routes and times).• Hours of workingWorks on site shall only take place in accordance with the approvedEnvironment and Construction Management Plan.Reason:In order that the local planning authority may be satisfied that the demolitionand construction process is carried out in a manner that recognises thelocational characteristics of the site and minimises nuisance to anyneighbouring residential occupiers, and to comply with Policies ENV.PRO10 Contaminated Land and HSG 4 Residential Amenity in the adoptedUnitary Development Plan (July 2004).(3) Construction Management and Logistics PlanNo works (including demolition and construction) shall commence until aConstruction Management and Logistics Plan (CMP) has been submitted to

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!