13.07.2015 Views

Open PDF - Harworth Heating Ltd

Open PDF - Harworth Heating Ltd

Open PDF - Harworth Heating Ltd

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4.7 SCHEMATIC ELECTRICAL EXTERNAL CONTROLS.External electrical connections are made into the boiler via the 4 connections onthe bottom right hand side of the front panel.1. The cylinder stat connects via a two pin female.2. The room stat connects via a two-pin male.3. The power connects via a two-pin female housed in a three pin plastic cover.4. The time clock links out via a two-pin male housed in a three pin plastic cover.4.8 OIL SUPPLY.Oil supply to the burner can be via 8 or 10 mm pipe the diameter will depend uponthe length of run.Oil feed hoses used in the system must comply with ISO 7840Oil supply pipes must be level to avoid air traps and clipped at 500mm intervals13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!