13.07.2015 Views

Open PDF - Harworth Heating Ltd

Open PDF - Harworth Heating Ltd

Open PDF - Harworth Heating Ltd

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4.9 Fire Prevention. _________________________________________ 144.10 Flueing.______________________________________________ 144.10.1 Vertical _______________________________________________ 154.10.2 Horizontal _____________________________________________ 164.11 Ventilation. ___________________________________________ 165 Time Control ________________________________________________175a Internal Controller __________________________________________175a.1 Setting the Current Time and Date. _________________________ 175a.2. Summer/Winter Switch. _________________________________ 195a.3 Turning The Millenium two controller into its run mode. _____________206 Commissioning The Boiler ______________________________________206.1 Firing up. ______________________________________________206.2 Vent air from the boiler and heating system. ____________________ 216.3 Commission the heating pressure system. ______________________ 216.4 Check the heating system. _________________________________ 216.5 The effect of TRV’s. _____________________________________ 216.6 Check hot water system, expansion vessel and pressure release devices. 216.7 Checking The Flue Gas Emissions And Temperature. _______________227 Routine Maintenance __________________________________________237.1 Introduction. ___________________________________________237.2 Removing and cleaning the burner.____________________________237.3 To remove and clean the flame tube. __________________________257.5 To remove examine and adjust the electrode. ___________________257.6 To remove and clean the photocell. ___________________________257.7 To check the fuel pump pressure. ____________________________267.8 To set the burner combustion. ______________________________267.9 Removing the baffle systems and cleaning the boiler. ______________277.10 Checking the oil line.______________________________________287.10a Changing The Brushes in the Burner Motor. _____________________287.11 Checking the firevalve. ____________________________________287.12 Checking the flue system. __________________________________287.13 Checking the provision of ventilation. _________________________288 Fault Finding and electrical diagrams _____________________________288.2 Internal Hard Wiring Layout________________________________308-3 12 Volt DC to 24 Volt DC Converter Wiring Diagram ________________ 319 Fill in the Warranty Form _____________________________________3210 Running Costs ______________________________________________323

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!