Road King Manual - Mesa Boogie
Road King Manual - Mesa Boogie
Road King Manual - Mesa Boogie
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
CONTROLS: (Continued)A.C. MAINS: (power on)This switch delivers the A.C. power to your new <strong>Road</strong> <strong>King</strong>. Make sure the unit is grounded (all three terminals of the A.C. power cordmust be connected whenever possible to avoid injury to the user as well as to the unit) and that the proper voltage is present. Followthe cold start procedure described in the ON/ STANDBY section above when powering up yournew <strong>Road</strong> <strong>King</strong>.HI VOLTSONAC MAINSONNow that we have reviewed the Channels and their Modes we are ready to go aft and check out the treasure chest of features that ridethe Rear Panel.REST AREAPAGE 12