document: CS/DDS/Ingles Court/constructionphaseplan.doc rev 0date: 10th May 2013page no: 284.4 Asbestos (continued)NNLW materials will be notified to the HSE however these materials can be removed by a non-licensed contractorhowever the materials must be taken by a licensed carrier to a licensed tip.NLW materials will not be notified to the HSE and these materials can be removed by a non-licensed contractor.Similarly the materials must be taken by a licensed carrier to a licensed tip.DDS’s operatives have attended UKATA Asbestos Operatives Three Day Training Course and the management teamhave attended a UKATA Three Day Asbestos Supervisors course.During the removal operation the following precautions will be taken to ensure that the operatives are not exposedto fibre concentrations above the Control Limits.oooooAt the site induction, the operatives who will be involved in the removal works will undertake a thoroughinduction explaining the respective hazards and control measures, method statement and emergencyprocedures.All operatives will be issued with FFP3 ori-nasal dust masks or Sundstrom oral / nasal half masks,instructed regarding their correct fitting, cleaning and storage.Strict hygiene procedures must be maintained - No smoking, drinking or eating whilst working, removeoveralls and wash hands, arms and face thoroughly before meal breaksAll operatives will wear Type 5 disposable overalls of a suitable type that will be regularly disposed ofwhen dirty and not washed then re-worn.Under the supervision of an analyst, background monitoring may be carried out - the number of the tests,frequency and duration will depend upon the advice from the analyst.DDS’s operatives continuously work in environments where the possibility of discovering further asbestos, notpicked up on surveys or during asbestos stripping procedures, exists. Such locations are:ooooooobeneath items of heavy plantwithin items of plantin live electrical apparatussealed in pipes and ductworkin ducts / risers inaccessible at time of surveythrough concrete slabs and beams - cast in situmaterials used as permanent shutteringIf during strip out, de-planting or demolition further asbestos based materials are discovered the GeneralForeman/Site Supervisor will be notified at once and the area will be sealed off and all works in the immediate areawill cease.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!