13.07.2015 Views

CONSTRUCTION PHASE PLAN - Shepway District Council

CONSTRUCTION PHASE PLAN - Shepway District Council

CONSTRUCTION PHASE PLAN - Shepway District Council

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

document: CS/DDS/Ingles Court/constructionphaseplan.doc rev 0date: 10th May 2013page no: 375.2 Site Access and EgressDDS will maintain the existing boundary Heras/Hoarding fencing already erected by Client McCarthy & Stone Ltd.Heras/Hoarding fencing gates have been incorporated into the Heras/Hoarding fencing at the site entrance byClient McCarthy & Stone Ltd. The gates will be kept closed whenever possible to prevent unauthorised entry to thedemolition site during the working day.Signs will be erected by DDS warning of the nature of the works to be undertaken and a signboard displayed withall relevant contact names including a 24hr telephone number.The fencing/hoarding will be kept closed to prevent unauthorised entry to the site during the working shift. At theend of each shift a check will be made to the security of the site to ensure it is properly secured.The local roads will be used to access the working area. All vehicles travelling along the local roads will obey thelocal speed limits.A banksman (wearing hi-vis) will be posted at the site entrance whilst marshalling wagons or delivery vehicleson/off the site. The gateman will liaise with all delivery drivers and ensure records (waste tickets etc) are in place.All deliveries to and from site, in particular H.G.V's, will be carefully coordinated to ensure minimal disruption tothe local environment is caused.Site and road conditions will be continuously monitored and adequate facilities will be provided for wheel washingand road cleaning should it be necessary.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!