RISKASSESSMENTS


This general assessment can be amended to deal with any additional or alternative situation that may apply to a particular site. The contract detail is then to be entered and distribution noted below.RISK ASSESSMENT <strong>Risk</strong> <strong>Assessment</strong> No. Demo.000Operation / Task: All Tasks Core <strong>Assessment</strong> Employees at <strong>Risk</strong>: Those carrying out the workLocation / Area: The Pavillion - Cheriton Sports Ground Other Persons at <strong>Risk</strong>: Those nearbyKey Responsible Persons:Site SupervisorActivity Hazard <strong>Risk</strong>Pre-Control <strong>Risk</strong>RatingControl MeasuresPost-Control <strong>Risk</strong>Rating1* 2* 1x2 1* 2* 1x2Pedestrian Activity. Plant & vehicleContact by 5 6 30 Personal awareness of operations on site.2 5 10movements.Use of pedestrian only routes where available/possible.Wearing high viz clothing to EN471.Secure site from general public and other campus users (staff &students).All Tasks. Incompetence Various 4 6 24 All site personnel to be competent to perform the tasks they are 1 5 5asked to do.Compliance with Site Rules.CommentAll Tasks. Noise from operations. Hearing damage. 3 4 12 All construction plant and vehicles constructed to nationalstandards and industry norm that includes noise attenuation.Noise levels identified on machine when possible.Noise <strong>Risk</strong> <strong>Assessment</strong> carried out for various items of plantand hearing protection identified.1 2 2 High level of awareness.Restricted hours of working tominimise environmental concerns.Please refer to the <strong>Risk</strong> <strong>Assessment</strong> Guidance Notes for information on interpretation. Target Post-Control Rating = 10 Some Pre-Control ratings may be less than 10 but further controls are still to be considered.<strong>Assessment</strong> Date: March 13 Review Date: January 2014Client / Principal ContractorCopies Issued To:(For Contract Specific SiteApproved for Issue:(Signature)UseGoody Demolition SupervisorKey:- Hazard Rating based onexposure:Key:- <strong>Risk</strong> Rating based on severity:1 =Highly Unlikely, 2 =Unlikely, 3 = Possible, 4 = Probable, 5 = Regular, 6 = Continuous1 = Trivial, 2 = Minor, 3 = Under”3-day” Injury, 4 = Over “3-day” Reportable Injury, 5 = Major Injury, 6 = FatalityPage 1 of 1


This general assessment can be amended to deal with any additional or alternative situation that may apply to a particular site. The contract detail is then to be entered and distribution noted below.RISK ASSESSMENT <strong>Risk</strong> <strong>Assessment</strong> No. Demo.001Operation / Task: Dealing with unknown or unidentified materials Employees at <strong>Risk</strong>: Those carrying out the workLocation / Area: The Pavillion - Cheriton Sports Ground Other Persons at <strong>Risk</strong>: Those nearbyKey Responsible Persons:Site SupervisorHazard<strong>Risk</strong>Pre-Control <strong>Risk</strong>RatingControl MeasuresPost-Control <strong>Risk</strong>Rating1 2 1x2 1 2 1x2CommentCaustic or acid materialsChemical reactionsChemical burnsRelease of potentially toxic gases,heat or explosion33551515Objectives to be instructed in “Emergency Procedures”Unknown chemicals or smells shall require cessation of work at thatpoint114444Provided that the controls areimplemented & maintained, theresidual risk will be lowInhalation of potentially toxicmaterialInhalation can lead to death3618Senior staff shall ensure that the area is quarantined and marked144Pollution of the aquaticenvironmentPoisoning of fish, plant & otherwater life339Safety plan/ Safety file shall be inspected for information122Pollution of the air environmentPotentially harmful exposure ofothers adjacent to the work339Client or Principal contractor shall carry out detailed assessment,including chemical analysis before finalising assessment122Work can recommence only after fully detailed specific assessment &controls are in place.DO NOT TOUCH ANY UNKNOWN CHEMICALS, REPORT TOSUPERVISOR AND H&S ADVISORPlease refer to the <strong>Risk</strong> <strong>Assessment</strong> Guidance Notes for information on interpretation. Target Post-Control Rating = 10 Some Pre-Control ratings may be less than 10 but further controls are still to be considered.<strong>Assessment</strong> Date: March 13 Review Date: January 2014 Copies Issued To: Client / Principal Contractor(For Contract SpecificSiteApproved for Issue:(Signature)UseGoody Demolition SupervisorKey:- Hazard Rating based on1 =Highly Unlikely, 2 =Unlikely, 3 = Possible, 4 = Probable, 5 = Regular, 6 = Continuousexposure:Key:- <strong>Risk</strong> Rating based on severity:1 = Trivial, 2 = Minor, 3 = Under”3-day” Injury, 4 = Over “3-day” Reportable Injury, 5 = Major Injury, 6 = FatalityPage 1 of 1


This general assessment can be amended to deal with any additional or alternative situation that may apply to a particular site. The contract detail is then to be entered and distribution noted below.RISK ASSESSMENT <strong>Risk</strong> <strong>Assessment</strong> No. Demo.002Operation / Task: Work in dusty conditions Employees at <strong>Risk</strong>: Those carrying out the workLocation / Area: The Pavillion - Cheriton Sports Ground Other Persons at <strong>Risk</strong>: Those nearbyKey Responsible Persons:Site SupervisorHazard<strong>Risk</strong>Pre-Control <strong>Risk</strong>RatingControl MeasuresPost-Control <strong>Risk</strong>Rating1 2 1x2 1 2 1x2CommentInhalation of dust hazard materialse.g. silica, Portland cement, MMMFetc. General dust is a hazardmaterialLong term damage to therespiratory system4520Ensure that dust control measures are in placeCarry out site survey for chemicals or specific materials144Provided that the controls areimplemented & maintained, theresidual risk will be lowInhalation of unknown materialsContact with the eyesContact with the skinAcute irritation with unknownmaterialsLong term damage to eyesDermatitis343555152015Provide & use respiratory protective equipment as a last resortProvide & use eye protectionEnsure welfare facilities are fully stocked, including barrier creams andoperators wash after every shift.231433893Please refer to the <strong>Risk</strong> <strong>Assessment</strong> Guidance Notes for information on interpretation. Target Post-Control Rating = 10 Some Pre-Control ratings may be less than 10 but further controls are still to be considered.<strong>Assessment</strong> Date: March 13 Review Date: January 2014Client / Principal ContractorCopies Issued To:(For Contract Specific SiteApproved for Issue:(Signature)UseGoody Demolition SupervisorKey:- Hazard Rating based on1 =Highly Unlikely, 2 =Unlikely, 3 = Possible, 4 = Probable, 5 = Regular, 6 = Continuousexposure:Key:- <strong>Risk</strong> Rating based on severity:1 = Trivial, 2 = Minor, 3 = Under”3-day” Injury, 4 = Over “3-day” Reportable Injury, 5 = Major Injury, 6 = FatalityPage 1 of 1


This general assessment can be amended to deal with any additional or alternative situation that may apply to a particular site. The contract detail is then to be entered and distribution noted below.RISK ASSESSMENT <strong>Risk</strong> <strong>Assessment</strong> No. Demo.006Operation / Task: Internal soft strip Employees at <strong>Risk</strong>: Those carrying out the workLocation / Area: The Pavillion - Cheriton Sports Ground Other Persons at <strong>Risk</strong>: Those working nearbyKey Responsible Persons:Site SupervisorHazard<strong>Risk</strong>Pre-Control <strong>Risk</strong>RatingControl MeasuresPost-Control <strong>Risk</strong>Rating1 2 1x2 1 2 1x2CommentDust & glass from partitions,carpets & furnishingsInjury to eyes from dust & glassCuts to hands from glass & metal33441212Enforce dust control; measures and/or use PPE (Dust masks,goggles, gloves)Heavy duty leather gloves available and worn112222Provided that the controls areimplemented & maintained, theresidual risk will be lowMan made mineral fibre MMMFfrom ceilings & partition insulationPuncture of feet from nails inupturned boards - (Tetanus)3412Keep nails downwards AND safety footwear worn236Metal fumes or dust from fittings &pipeworkLead / zinc / chrome or poisoningby other metals3515Avoid breakage of mercury strip lights & dispose to licensed tip155Mercury compounds from striplightingBroken timber & protruding nailsHand held toolsFire from flame cuttingSevere poisoning by mercurycompoundsPuncture of hands & feet fromnails. Cuts & abrasions333564151812Ensure that fire wardens & fire fighting equipment are close by. HotWork Permit may be usedUse fume extract when flame cutting PERMIT TO WORKHeavy duty leather gloves available and worn.Keep nails downwards AND safety footwear worn111333333Noise & vibration from hand heldtools3412Ensure that all tools are correctly maintainedAnti-vibration equipment where possible and good PPE as determined144Please refer to the <strong>Risk</strong> <strong>Assessment</strong> Guidance Notes for information on interpretation. Target Post-Control Rating = 10 Some Pre-Control ratings may be less than 10 but further controls are still to be considered.<strong>Assessment</strong> Date: March 13 Review Date: January 2014 Copies Issued To: Client / Principal Contractor(For Contract Specific SiteApproved for Issue:(Signature)UseGoody Demolition SupervisorKey:- Hazard Rating based on1 =Highly Unlikely, 2 =Unlikely, 3 = Possible, 4 = Probable, 5 = Regular, 6 = Continuousexposure:Key:- <strong>Risk</strong> Rating based on severity:1 = Trivial, 2 = Minor, 3 = Under”3-day” Injury, 4 = Over “3-day” Reportable Injury, 5 = Major Injury, 6 = FatalityPage 1 of 1


This general assessment can be amended to deal with any additional or alternative situation that may apply to a particular site. The contract detail is then to be entered and distribution noted below.RISK ASSESSMENT <strong>Risk</strong> assessment No. Demo.007Operation / Task: High Level Demolition Employees at <strong>Risk</strong>: Those carrying out the workLocation / Area: The Pavillion - Cheriton Sports Ground Other Persons at <strong>Risk</strong>: Those working nearbyKey Responsible Persons:Site SupervisorHazard<strong>Risk</strong>Pre-Control <strong>Risk</strong>RatingControl MeasuresPost-Control <strong>Risk</strong>Rating1 2 1x2 1 2 1x2CommentWork at heightsPersonnel falling from edges ofwork areaFalls of personnel can lead toserious injury or deathFalls of equipment can lead toserious injury or death66663636Use correct access equipment e.g. scaffoldEnsure that edge protection is in place116666Provided that the controls areimplemented & maintained, theresidual risk will be lowEquipment falling on to personnelbelowEquipment handling falling fromheight can lead to equipmentdamage or injuries to personnel6636Ensure that safety zones are established around work at high level155Debris falling from heightDebris falling from height can leadto serious injury6530Where necessary provide & use safety harness & netsEnsure that any equipment supplied has been erected and inspectedby competent persons prior to use.144Please refer to the <strong>Risk</strong> <strong>Assessment</strong> Guidance Notes for information on interpretation. Target Post-Control Rating = 10 Some Pre-Control ratings may be less than 10 but further controls are still to be considered.<strong>Assessment</strong> Date: March 13 Review Date: January 2014 Copies Issued To: Client / Principal Contractor(For Contract Specific SiteApproved for Issue:(Signature)UseGoody Demolition SupervisorKey:- Hazard Rating based onexposure:1 =Highly Unlikely, 2 =Unlikely, 3 = Possible, 4 = Probable, 5 = Regular, 6 = ContinuousKey:- <strong>Risk</strong> Rating based on severity:1 = Trivial, 2 = Minor, 3 = Under”3-day” Injury, 4 = Over “3-day” Reportable Injury, 5 = Major Injury, 6 = FatalityPage 1 of 1


This general assessment can be amended to deal with any additional or alternative situation that may apply to a particular site. The contract detail is then to be entered and distribution noted below.RISK ASSESSMENT <strong>Risk</strong> <strong>Assessment</strong> No. Demo.011Operation / Task: Unintentional fire Employees at <strong>Risk</strong>: Those carrying out the workLocation / Area: The Pavillion - Cheriton Sports Ground Other Persons at <strong>Risk</strong>: Those working nearbyKey Responsible Persons:Site SupervisorsHazard<strong>Risk</strong>Pre-Control <strong>Risk</strong>RatingControl MeasuresPost-Control <strong>Risk</strong>Rating1 2 1x2 1 2 1x2CommentFlame cuttingSmokingSerious injuries to personnelSerious damage to structures33561518No flame cutting/ burning without HOT WORK PERMITSmoking only in permitted areas of the site113232Provided that the controls areimplemented & maintained, theresidual risk will be lowFlammable litterFlammable materialsEmission of toxic fumes frommaterials on siteExplosion of fuels or gas stores33561518Ensure that first aid fire fighting equipment is available around the siteEnsure that all hot work is stopped at least 30 minutes before siteclosureEnsure that any hot work is damped down before site closureCarry out site inspection at close of work each day AND RECORD IT112323Please refer to the <strong>Risk</strong> <strong>Assessment</strong> Guidance Notes for information on interpretation. Target Post-Control Rating = 10 Some Pre-Control ratings may be less than 10 but further controls are still to be considered.<strong>Assessment</strong> Date: March 13 Review Date: January 2014 Copies Issued To: Client / Principal Contractor(For Contract Specific SiteApproved for Issue:(Signature)UseGoody Demolition SupervisorKey:- Hazard Rating based on<strong>Assessment</strong> No. Dem/0111 =Highly Unlikely, 2 =Unlikely, 3 = Possible, 4 = Probable, 5 = Regular, 6 = Continuousexposure:Key:- <strong>Risk</strong> Rating based on severity:1 = Trivial, 2 = Minor, 3 = Under”3-day” Injury, 4 = Over “3-day” Reportable Injury, 5 = Major Injury, 6 = FatalityPage 1 of 1


This general assessment can be amended to deal with any additional or alternative situation that may apply to a particular site. The contract detail is then to be entered and distribution noted below.RISK ASSESSMENT <strong>Risk</strong> <strong>Assessment</strong> No. Demo.012cOperation / Task: Operation of 360 machine with bucket attachment Employees at <strong>Risk</strong>: Those carrying out the workLocation / Area: The Pavillion - Cheriton Sports Ground Other Persons at <strong>Risk</strong>: Those working nearbyKey Responsible Persons:Site SupervisorsHazard<strong>Risk</strong>Pre-Control <strong>Risk</strong>RatingControl MeasuresPost-Control <strong>Risk</strong>Rating1 2 1x2 1 2 1x2CommentFalls of size reduced materialsMoving parts of excavationequipmentInjuries by movement ofmechanical plantAmputation or crushing on contactwith moving parts of the excavator44652420Provide warning signs & set up exclusion zoneEnsure that all necessary guards are in place & observed214484Provided that the controls areimplemented & maintained, theresidual risk will be lowProjectilesDustInjury due to projectiles from theexcavations operationsInhalation of dust from excavationof ground.Eye irritation by dust from handling333544151212Set up exclusion zone ensure all operatives wear the correct PPE atall times – goggles or glasses, gloves furniture hide, boots, hi viz ,dust masks and helmetsProvide water sprays to limit dust emission, continuous use ifnecessary. Provide & ensure use of RPE for all personnel.Provision & use of eye protection111322322NoiseExposure to noise above secondexposure level3413Provide & ensure the use of adequate hearing protection122Rupture of hydraulic linesSpillage of hot oil and subsequentskin burns3515Good maintenance of machines and spill kitsProvide & ensure use of PPE122Please refer to the <strong>Risk</strong> <strong>Assessment</strong> Guidance Notes for information on interpretation. Target Post-Control Rating = 10 Some Pre-Control ratings may be less than 10 but further controls are still to be considered.<strong>Assessment</strong> Date: March 13 Review Date: January 2014 Copies Issued To: Client / Principal Contractor(For Contract Specific SiteApproved for Issue:(Signature)UseGoody Demolition SupervisorKey:- Hazard Rating based on1 =Highly Unlikely, 2 =Unlikely, 3 = Possible, 4 = Probable, 5 = Regular, 6 = Continuousexposure:Key:- <strong>Risk</strong> Rating based on severity:1 = Trivial, 2 = Minor, 3 = Under”3-day” Injury, 4 = Over “3-day” Reportable Injury, 5 = Major Injury, 6 = FatalityPage 1 of 1


This general assessment can be amended to deal with any additional or alternative situation that may apply to a particular site. The contract detail is then to be entered and distribution noted below.RISK ASSESSMENT <strong>Risk</strong> <strong>Assessment</strong> No. Demo.014Operation / Task: Hard demolition Employees at <strong>Risk</strong>: Those carrying out the workLocation / Area: The Pavillion - Cheriton Sports Ground Other Persons at <strong>Risk</strong>: Those working nearbyKey Responsible Persons:Site SupervisorsHazard<strong>Risk</strong>Pre-Control <strong>Risk</strong>RatingControl MeasuresPost-Control <strong>Risk</strong>Rating1 2 1x2 1 2 1x2CommentFalling debrisUnplanned collapseInjury to personnel or the publicSerious injury to numbers ofpersonnel54663024All work carried out in strict accordance with the method of workAll demolition procedures to be determined by competent designers.All machinery to be fitted with safety cages115555Provided that the controls areimplemented & maintained, theresidual risk will be lowDust emissionEnvironmental pollution by dust5420Demolition zones to be clearly identified122NoiseInhalation of hazard dusts by sitepersonnel & the publicHearing damage and/orenvironmental nuisance54442016All site personnel to use correct RPE and other PPE, including safetyhelmets, safety boots, hi vi vests.Provision and use of ear defenders112222Unstable debris heapsCollapse & entrapment4624All debris cleared systematically from the work area133Please refer to the <strong>Risk</strong> <strong>Assessment</strong> Guidance Notes for information on interpretation. Target Post-Control Rating = 10 Some Pre-Control ratings may be less than 10 but further controls are still to be considered.<strong>Assessment</strong> Date: March 13 Review Date: January 2014 Copies Issued To: Client / Principal Contractor(For Contract SpecificSiteApproved for Issue:(Signature)UseGoody Demolition SupervisorKey:- Hazard Rating based on1 =Highly Unlikely, 2 =Unlikely, 3 = Possible, 4 = Probable, 5 = Regular, 6 = Continuousexposure:Key:- <strong>Risk</strong> Rating based on severity:1 = Trivial, 2 = Minor, 3 = Under”3-day” Injury, 4 = Over “3-day” Reportable Injury, 5 = Major Injury, 6 = FatalityPage 1 of 1


This general assessment can be amended to deal with any additional or alternative situation that may apply to a particular site. The contract detail is then to be entered and distribution noted below.RISK ASSESSMENT <strong>Risk</strong> <strong>Assessment</strong> No. Demo.016Operation / Task: Site security Employees at <strong>Risk</strong>: Those carrying out the workLocation / Area: The Pavillion - Cheriton Sports Ground Other Persons at <strong>Risk</strong>: Those working nearbyKey Responsible Persons:Site SupervisorHazard<strong>Risk</strong>Pre-Control <strong>Risk</strong>RatingControl MeasuresPost-Control <strong>Risk</strong>Rating1 2 1x2 1 2 1x2CommentUnauthorized access bypedestriansVehicular entry & exitVandalismTheft of machinery & plantParking of unauthorized vehicles(Squatters)Damage to plant & machinery---------Site secured by a substantial boarding or fencingAll entrances manned during working hoursAll work areas within the site secured to avoid access to unsafestructures or excavations or unprotected platforms e.g. flat roof areas---------Provided that the controls areimplemented & maintained, theresidual risk will be lowChildren outside working hoursSerious incidents & possible death5630All entrances securely locked whilst not in use and manned during theday & locked during non - working times.248Please refer to the <strong>Risk</strong> <strong>Assessment</strong> Guidance Notes for information on interpretation. Target Post-Control Rating = 10 Some Pre-Control ratings may be less than 10 but further controls are still to be considered.<strong>Assessment</strong> Date: March 13 Review Date: January 2014 Copies Issued To: Client / Principal Contractor(For Contract Specific SiteApproved for Issue:(Signature)UseGoody Demolition SupervisorKey:- Hazard Rating based on1 =Highly Unlikely, 2 =Unlikely, 3 = Possible, 4 = Probable, 5 = Regular, 6 = Continuousexposure:Key:- <strong>Risk</strong> Rating based on severity:1 = Trivial, 2 = Minor, 3 = Under”3-day” Injury, 4 = Over “3-day” Reportable Injury, 5 = Major Injury, 6 = FatalityPage 1 of 1


This general assessment can be amended to deal with any additional or alternative situation that may apply to a particular site. The contract detail is then to be entered and distribution noted below.RISK ASSESSMENT <strong>Risk</strong> <strong>Assessment</strong> No. Demo.017Operation / Task: Existing services (Overhead & Underground) Employees at <strong>Risk</strong>: Those carrying out the workLocation / Area: The Pavillion - Cheriton Sports Ground Other Persons at <strong>Risk</strong>: Those working nearbyAssessor: Key Responsible Persons: Site SupervisorHazardLive electricity cablesLive gas mainsGas mains not purgedLive water mainsSewers<strong>Risk</strong>Cutting into live electric cables canlead to serious burns or deathFracture of gas mains can lead toexplosion and/or fireNon-purged gas mains can lead toexplosion and/or fireFracture of water mains can lead tofloods & loss of supply to othersUnplanned break into sewers canlead to pollution & diseaseFracture of oil service pipes canlead to pollution & firePre-Control <strong>Risk</strong>RatingControl MeasuresPost-Control <strong>Risk</strong>Rating1 2 1x2 1 2 1x2All Services:6 6 361 6 6-Ensure as far as practicable all main services are traced prior to startof demolition work-Obtain certification from the client / main contractor the services are6 6 36 cut off by the relevant supplier.1 5 5-Where services are cut off then the point of isolation shall beidentified by the client’s agent.5 6 30 -Obtain & check drawings of underground services (these should be 1 5 5within the client’s paperwork)-If necessary carry out an internal survey for all services5 5 25 -Scan area for buried services with a cable location device prior to 1 4 4excavation.-Ensure that all procedures are in place for emergencies the client willissue us a fire plan which all operatives will follow in case of5 4 20 emergencies – this will form part of the site induction.1 3 3CommentProvided that the controls areimplemented & maintained, theresidual risk will be lowOil service pipes4416133Please refer to the <strong>Risk</strong> <strong>Assessment</strong> Guidance Notes for information on interpretation. Target Post-Control Rating = 10 Some Pre-Control ratings may be less than 10 but further controls are still to be considered.<strong>Assessment</strong> Date: March 13 Review Date: January 2014 Copies Issued To: Client / Principal Contractor(For Contract Specific SiteApproved for Issue:(Signature)UseGoody Demolition SupervisorKey:- Hazard Rating based on1 =Highly Unlikely, 2 =Unlikely, 3 = Possible, 4 = Probable, 5 = Regular, 6 = Continuousexposure:Key:- <strong>Risk</strong> Rating based on severity:1 = Trivial, 2 = Minor, 3 = Under”3-day” Injury, 4 = Over “3-day” Reportable Injury, 5 = Major Injury, 6 = FatalityPage 1 of 1


This general assessment can be amended to deal with any additional or alternative situation that may apply to a particular site. The contract detail is then to be entered and distribution noted below.RISK ASSESSMENT <strong>Risk</strong> <strong>Assessment</strong> No. Demo.019aOperation / Task: Work at height – Machine operations Employees at <strong>Risk</strong>: Those carrying out the workLocation / Area: The Pavillion - Cheriton Sports Ground Other Persons at <strong>Risk</strong>: Those working nearbyAssessor: Key Responsible Persons: Site SupervisorsHazard<strong>Risk</strong>Pre-Control <strong>Risk</strong>RatingControl MeasuresPost-Control <strong>Risk</strong>Rating1 2 1x2 1 2 1x2CommentPersonnel falling during access toor exit from height & Personnelfalling from working area at heightFalls of personnel can lead toserious injury or death5630-Provide safe access by mobile platforms-Skilled & trained for work at heights- As a last resort, provide & use fall arrest equipment166Provided that the controls areimplemented & maintained, theresidual risk will be lowEquipment falling during raising toor lowering from heightFalls of equipment can lead toserious injury or death5630-Secured work platforms to prevent stray materials-Provide test & check hoists or lifting equipment and use of correctchains, slings etc.-Provide training for the correct use of lifting equipment144Trespass to work areaTrespass of unauthorised personscan lead to serious injury or death5630-Ensure that access equipment are secured at night to preventtrespass155Debris falling from heightEquipment handling to & fromheight can lead to equipmentdamage or injuries to personnel5525Ensure that a banksman is in attendance and that a 360 degreeexcavator using it’s grapple attachment carries out control removal ofmaterial from high placing debris into designated waste area.133Ensure only authorised personnel are allowed in demolition area.Ensure that any equipment supplied has been erected and inspectedby competent persons prior to use. And regular inspections are carriedout on the regular basis.Please refer to the <strong>Risk</strong> <strong>Assessment</strong> Guidance Notes for information on interpretation. Target Post-Control Rating = 10 Some Pre-Control ratings may be less than 10 but further controls are still to be considered.<strong>Assessment</strong> Date: March 13 Review Date: January 2014Client / Principal ContractorCopies Issued To:(For Contract Specific SiteApproved for Issue:(Signature)UseGoody Demolition SupervisorKey:- Hazard Rating based on1 =Highly Unlikely, 2 =Unlikely, 3 = Possible, 4 = Probable, 5 = Regular, 6 = Continuousexposure:Key:- <strong>Risk</strong> Rating based on severity:1 = Trivial, 2 = Minor, 3 = Under”3-day” Injury, 4 = Over “3-day” Reportable Injury, 5 = Major Injury, 6 = FatalityPage 1 of 1


This general assessment can be amended to deal with any additional or alternative situation that may apply to a particular site. The contract detail is then to be entered and distribution noted below.RISK ASSESSMENT <strong>Risk</strong> <strong>Assessment</strong> No. Demo.020Operation / Task:Location / Area:Traffic entering, leaving andmovement on siteThe Pavillion - Cheriton SportsGroundEmployees at <strong>Risk</strong>:Other Persons at <strong>Risk</strong>:Key Responsible Persons:Those carrying out the workThose working nearby. Pedestrians on site. The general public crossing theentrance/exit. Other road users, as site traffic enters or leaves the siteSite SupervisorsHazard<strong>Risk</strong>Pre-Control <strong>Risk</strong>RatingControl MeasuresPost-Control <strong>Risk</strong>Rating1 2 1x2 1 2 1x2CommentTraffic entering site from mainroadTraffic leaving site to mainroadRoad traffic accidents from trafficcrossing entrancePedestrian accidents by traffic passingentrance to site facilities44662424Warning signs to all traffic & pedestrians to Chapter 8 of the TrafficSigns Manual and ACOP for street-works.Traffic controls at exit depending on volume of traffic116666Provided that the controls areimplemented & maintained, theresidual risk will be lowPedestrians crossing entrance& on siteTransport of mud into buildings causingslippery floors etc3412Place barriers to direct traffic flow144Mud caused by siteTransport of mud from wheel wash toexternal roads increasing RTA risks4416Provide barriers to segregate traffic from pedestrians on site144Mud caused by site &Vehicle speed on siteExcessive speed on site can lead todust if dry or loss of control if wet4520Site speed limit of max. 5mphRegular cleaning with mechanical sweeper155Contact by injuries4520Ditto above & all operatives to use high visibility jackets155Provide boot scrapers & mats at all entrances to site facilitiesPlease refer to the <strong>Risk</strong> <strong>Assessment</strong> Guidance Notes for information on interpretation. Target Post-Control Rating = 10 Some Pre-Control ratings may be less than 10 but further controls are still to be considered.<strong>Assessment</strong> Date: March 13 Review Date: January 2014 Copies Issued To: Client / Principal Contractor(For Contract Specific SiteApproved for Issue:(Signature)UseGoody Demolition SupervisorKey:- Hazard Rating based on1 =Highly Unlikely, 2 =Unlikely, 3 = Possible, 4 = Probable, 5 = Regular, 6 = Continuousexposure:Key:- <strong>Risk</strong> Rating based on severity:1 = Trivial, 2 = Minor, 3 = Under”3-day” Injury, 4 = Over “3-day” Reportable Injury, 5 = Major Injury, 6 = Fatality


This general assessment can be amended to deal with any additional or alternative situation that may apply to a particular site. The contract detail is then to be entered and distribution noted below.RISK ASSESSMENT <strong>Risk</strong> <strong>Assessment</strong> No. Demo.033aOperation / Task: Brick Cleaning Operations Employees at <strong>Risk</strong>: Site operativesLocation / Area: The Pavillion - Cheriton Sports Ground Other Persons at <strong>Risk</strong>: Site personnel, VisitorsKey Responsible Persons:Managers & SupervisorsRef. Activity Hazard <strong>Risk</strong>01 Brick CleaningoperationsCuts, bruise, backinjuries & minorabrasionsFalls, slips, repetitivemovement strain, cutsPre-Control<strong>Risk</strong> Rating1 2 1xControl Measures23 3 9 Wear the correct PPE – Gloves, safety boots, and safetyspecs. Avoid repetitive lifting actions – situate palletsnext to cleaning pilePost-Control<strong>Risk</strong> Rating1 2 1x2Comment1 3 6 Health and Safety Plan strictly followed.Trained, competent operatives for all workactivities.02 Access/Egress toWorking areasUnauthorisedpersonnel.Coming into contact withdemolition zone,Uncontrolled collapse3 6 18 Site working areas will be regulated off from demolitionzones and warning signs displayed. All visitors report tosite office for Safety Induction.1 6 603 Chipping off mortar offbricksGrit particles fromoperations.Grit particles coming intocontact with eyes3 4 12 Wear safety spectacles / goggles to protect eyes 1 2 2Please refer to the <strong>Risk</strong> <strong>Assessment</strong> Guidance Notes for information on interpretation. Target Post-Control Rating = 10 Some Pre-Control ratings may be less than 10 but further controls are still to be considered.<strong>Assessment</strong> Date: March 13 Review Date: January 2014 Copies Issued To: Client / Principal ContractorApproved for Issue:(Signature)(For Contract Specific SiteUseGoody Demolition SupervisorKey:- Hazard Rating based onexposure:1 =Highly Unlikely, 2 =Unlikely, 3 = Possible, 4 = Probable, 5 = Common, 6 = Regular, 7 = ContinuousKey:- <strong>Risk</strong> Rating based on severity:1 = Trivial, 2 = Minor, 3 = Under”3-day” Injury, 4 = Over “3-day” Reportable Injury, 5 = Major Injury, 6 = Fatality(1 person),7 = Multiple Fatality(2+ persons)


This general assessment can be amended to deal with any additional or alternative situation that may apply to a particular site. The contract detail is then to be entered and distribution noted below.RISK ASSESSMENT <strong>Risk</strong> <strong>Assessment</strong> No. Demo.033Operation / Task: Demolition Operations Employees at <strong>Risk</strong>: Site operativesLocation / Area: The Pavillion - Cheriton Sports Ground Other Persons at <strong>Risk</strong>: Site personnel, VisitorsKey Responsible Persons:Managers & SupervisorsRef. Activity Hazard <strong>Risk</strong>Pre-Control<strong>Risk</strong> Rating1 2 1xControl Measures201 Demolition operations Demolition of structures Falls, falling objects, 3 6 18 Erect hoardings, barriers and fencing as required.Display warning signs. Safe System of Work to controlcollapse of structure.Post-Control<strong>Risk</strong> Rating1 2 1x21 6 6CommentHealth and Safety Plan strictly followed.Trained, competent operatives for all workactivities.02 Access/Egress toWorking areasUnauthorisedpersonnel.Falls, falling objects,Uncontrolled collapse3 6 18 Site working areas will be fenced, hoarding erected andwarning signs displayed. All visitors report to site officefor Safety Induction.1 6 603 All Tasks. Noise, dust fromoperations.Hearing damage.Environmental issues3 4 12 All construction plant and vehicles constructed to nationalstandards and industry norm that includes noiseattenuation. Noise <strong>Risk</strong> <strong>Assessment</strong> carried out for variousitems of plant and hearing protection identified.1 2 2 Use of water to damp down works tominimise dust.04 Driving on site Plant and vehiclemovements.Obstruction.Contact by.Contact with.Major injury.5 6 30 Site speed limit usually 5 m.p.h.High level of personal awareness.Rotating flashing amber beacon displayed prominentlyon top of vehicle.2 2 4 See also task specific assessments.05 Hot Works Sparks, Fire, Explosion Fatality, Major injuryProperty, equipmentdamage3 6 18 Trained, competent operatives. Hot works Permit to beused. Check for hot spots. Fire fighting equipmentavailable in working area.1 6 6Please refer to the <strong>Risk</strong> <strong>Assessment</strong> Guidance Notes for information on interpretation. Target Post-Control Rating = 10 Some Pre-Control ratings may be less than 10 but further controls are still to be considered.<strong>Assessment</strong> Date: March 13 Review Date: January 2014 Copies Issued To: Client / Principal ContractorApproved for Issue:(Signature)(For Contract Specific SiteUseGoody Demolition SupervisorKey:- Hazard Rating based onexposure:1 =Highly Unlikely, 2 =Unlikely, 3 = Possible, 4 = Probable, 5 = Common, 6 = Regular, 7 = ContinuousKey:- <strong>Risk</strong> Rating based on severity:1 = Trivial, 2 = Minor, 3 = Under”3-day” Injury, 4 = Over “3-day” Reportable Injury, 5 = Major Injury, 6 = Fatality(1 person),7 = Multiple Fatality(2+ persons)


This assessment can be amended to deal with any additional or alternative situation that may apply to aparticular site.RISK ASSESSMENT Contract: <strong>Risk</strong> assessment No. Demo.034Operation / Task: Manual Handling in General Demolition Operations Employees at <strong>Risk</strong>: Demolition OperativesLocation / Area: The Pavillion - Cheriton Sports Ground Other Persons at <strong>Risk</strong>: Other staff & public (occasionally)Assessor: Spencer Nichol Key Responsible Persons: Supervisors / ForemenDescriptionThe tasks - do they involve: holding loads away from trunk? twisting? stooping? reaching upwards? large vertical movement? long carrying distance? strenuous pushing or pulling? unpredictable movement of loads? repetitive handling? insufficient rest or recovery? a work-rate imposed by a process?YYYYYNNYYNNY/NPre-Control <strong>Risk</strong>Post-Control <strong>Risk</strong> RatingRatingControl Measures1* 2* 1x2 1* 2* 1x2-The use of mechanical equipment wherever possible to minimise3 4 12 manual handling1 2 23 4 12 -For soft strip work the work is programmed with a sequence of1 2 23 4 12operations to avoid carrying materials long distances and using debris1 2 2chutes3 3 91 1 1-All men receive basic manual handling training including best practices2 4 8 -Contracts are individually assessed to determine maximum use of 1 1 10 0 0 mechanical aids0 0 00 0 0 -Structural demolition uses mechanical equipment to minimise handling 0 0 03 5 15 and other demolition related risks1 2 22 4 0 -Additional labour provided for tasks requiring multi-lifting in awkward 1 1 10 0 0 areas0 0 00 0 0 -Access / work scaffolds provided where required to obviate reaching 0 0 0upwards-Ramps provided to obviate steps where practicableCommentThe tasks on demolition mainly relate tohandling of materials arising from softstrip or sorting materials post demolition.Although carried out manually, theoperatives are assisted wherever possibleby mechanical equipment.The main demolition work is carried outwherever possible using specialistmechanical equipment so manualhandling is minimised. In reality, allreasonably practicable efforts are made toavoid handling any material creating asignificant handling risk unless essential.The loads - are they: heavy? bulky/unwieldy? difficult to grasp? unstable/unpredictable? intrinsically harmful (eg sharp/hot)?The working environment - are they: constraints on posture? poor floors? variations in levels? hot/cold/humid conditions? strong air movements? poor lighting conditions?YYYYYYYYYYY3333334443344344455444121291212122020161212-Components are broken down to below 20-25kg weight-Components reduced to small unit sizes, especially during soft stripwork-All work subject to risk assessment and method statement to avoidunpredictable movements-Operatives are experienced to anticipate possible problems-Hot work subject to Permit to Work-“Sharps” subject to strict handling and PPE requirements-“Open up” area to allow better access-Dedicated walkways wherever possible-Provision & use of ramps and temporary platforms-Good selection of PPE consistent to hot / cold / wet conditions-Provision & use of screening to avoid dusts and wind effects-Provision & use of low voltage temporary lighting122221222212222223322124444266441Whilst screening can improve workconditions, it is only provided if it has noadverse effect on the stability of thestructure being demolishedManual Handling <strong>Assessment</strong> Page 1 of 2 Form No. HSGD05/1


This assessment can be amended to deal with any additional or alternative situation that may apply to aparticular site.RISK ASSESSMENT Contract: <strong>Risk</strong> assessment No. Demo.034Operation / Task: Manual Handling in General Demolition Operations Employees at <strong>Risk</strong>: Demolition OperativesLocation / Area: The Pavillion - Cheriton Sports Ground Other Persons at <strong>Risk</strong>: Other staff & public (occasionally)Assessor: Spencer Nichol Key Responsible Persons: Supervisors / ForemenDescriptionIndividual capability - does the job: require unusual capability? hazard those with a health problem? hazard those who are pregnant? call for special information/training?YYYYY/NPre-Control <strong>Risk</strong>Post Control <strong>Risk</strong> RatingRatingControl Measures1* 2* 1x2 1* 2* 1x2-Operatives trained and fully experienced in demolition activities-Very experienced supervision-Pregnant persons not employed due to the significant risks6 30-Specialist training provided for certain high risk situations (e.g. asbestos2 2 4removal)5 250 0 0-All operatives physically fit for this type of work-Personnel suffering with significant health problems not employed dueto nature of the work5575654225030309CommentDemolition activity creates many potentialhazards that can affect people withcertain poor health conditions such asrespiratory problems. Whilst every effortis made to minimise the effect, it isinadvisable to use such persons in thiswork unless medical evidence confirmssuitability.Other factors: Is movement or posturehindered by clothing or personal protectiveequipmentYPPE is a common provision for demolition work. The whole work practice is assessed on its merit to determine most efficient and reasonably practicable way to do the work.PPE is a “last resort” principle but it is essential for most aspects of demolition and its use is determined accordingly.2. Are mechanical lifting aids required? Yes/No Details: Specialist equipment such Excavators with ROPs & FOPs. Attachments such as Pusher arms, Guillotines, Breakers and Claws.Cranes are used for specialist lifts as necessary. Forklifts and loading shovels (tyred and skid steer) for moving & loading materialsPallet trucks3. Is assistance from others required? Yes/No Details: Additional manual labour used for lifting in restricted ares. This can be supplemented provision and use of pulley blocks, jacks etc as necessary.4. Check accident records for previous handling injuries and dates: Date……………………………………………………………..5. Action required Target Completion date: Completion date:It is assumed the above control measures are in place before any work commences. Demolition sites are ever changing and control measures will change accordingly but the above are commoncontrols for subject works to avoid manual handling problems.Before each job startsPlease refer to the <strong>Risk</strong> <strong>Assessment</strong> Guidance Notes for information on interpretation. Target Post-Control Rating = 10 Some Pre-Control ratings may be less than 10 but further controls are still to be considered.<strong>Assessment</strong> Date: March 13 Review Date: January 2014 Copies Issued To: Client / Principal Contractor(For Contract Specific SiteApproved for Issue:(Signature)UseGoody Demolition SupervisorKey:- Hazard Rating based onexposure:Key:- <strong>Risk</strong> Rating based on severity:1 =Highly Unlikely, 2 =Unlikely, 3 = Possible, 4 = Probable, 5 = Common, 6 = Regular, 7 = Continuous1 = Trivial, 2 = Minor, 3 = Under”3-day” Injury, 4 = Over “3-day” Reportable Injury, 5 = Major Injury, 6 = Fatality(1 person),7 = Multiple Fatality(2+ persons)Manual Handling <strong>Assessment</strong> Page 2 of 2 Form No. HSGD05/1


This general assessment can be amended to deal with any additional or alternative situation that may apply to a particular site. The contract detail is then to be entered and distribution noted below.RISK ASSESSMENT <strong>Risk</strong> <strong>Assessment</strong> No. Demo.043Operation / Task: Operation of lorries Employees at <strong>Risk</strong>: Those carrying out the workLocation / Area: The Pavillion - Cheriton Sports Ground Other Persons at <strong>Risk</strong>: Those working nearbyKey Responsible Persons:Site SupervisorsHazard<strong>Risk</strong>Pre-Control <strong>Risk</strong>RatingControl MeasuresPost-Control <strong>Risk</strong>Rating1 2 1x2 1 2 1x2CommentContact with moving plantMoving parts of skip lorryMaterial falling off from skip / tipperbodyInjuries by movement of lorriesAmputation or crushing on contactwith moving parts of the hydraulicplantInjury due to material from theloading operation443655242015Provide warning signs & set up exclusion zoneSite speed limit of max. 5mph drivers should have a safe place to waitduring the loading and unloading process, without being required topass through areas where there are moving vehiclesEnsure that all necessary guards are in place & observed andexclusion zone is observed whilst loading/unloading operations aretaking place.Set up exclusion zone. Where necessary provide & use sheeting.211243443Provided that the controls areimplemented & maintained, theresidual risk will be lowThis assessment to be read inconjunction with Dem22. All plantequipment must comply with PUWER1998. Use of banksmen to supervisereversing as required.DustInhalation of dust from handling ofdebris3412Provide water sprays to limit dust emission, continuous use ifnecessary. Provide & ensure use of RPE for all personnel. Wherenecessary provide & use sheeting.122Eye irritation by dust from handlingof debris3412Provision & use of eye protection. Dampen down whilst loadingmaterial to avoid particle release.122NoiseExposure to noise above secondexposure level3413Provide & ensure the use of adequate hearing protection122Rupture of hydraulic linesSpillage of hot oil and subsequentskin burns3515Good maintenance of lorryProvide & ensure use of PPE by driver as appropriate to operation.122Driving on siteVehicle movements. Contact by.Contact with. Major injury.4624Site speed limit usually 5 m.p.h.High level of personal awareness.Rotating flashing amber beacon displayed prominently on top ofvehicle.224Reversing of lorries5630If reversing is unavoidable additional safety measures should beconsidered, eg extra mirrors on vehicles and CCTV. Banksman to bein attendance whilst reversing is taking place.224Page 1 of 2


This general assessment can be amended to deal with any additional or alternative situation that may apply to a particular site. The contract detail is then to be entered and distribution noted below.RISK ASSESSMENT <strong>Risk</strong> <strong>Assessment</strong> No. Demo.043Operation / Task: Operation of lorries Employees at <strong>Risk</strong>: Those carrying out the workLocation / Area: The Pavillion - Cheriton Sports Ground Other Persons at <strong>Risk</strong>: Those working nearbyKey Responsible Persons:Site SupervisorsGeneral loading of material intotipper bodyInjuries due to falling or swingingobjects4624Ensure that a banksman is in attendance and that a fully trainedoperator using a 360 degree excavator using it’s grapple / bucketattachment carries out debris removal placing debris into the tipperbody. Equipment properly sited.224Provided that the controls areimplemented & maintained, theresidual risk will be lowRemoval of hazardous materialContamination - Release ofasbestos fibres to the air / waterenvironment as waste3618Work with asbestos carried out in accordance with the companyhealth & safety compliance procedures & documentation includingwithin the Method Statement.Use either lockable / polythene sheeted skips and ensure that thewaste is properly sheeted/encapsulated prior to removal. Ensure allwaste transfer notes are completed.PPE (Safety helmet, high visibility vest/jacket, respirator, FFPS 3standard, Dustproof overalls. All asbestos material will be carefullyloaded into a covered skip/lorry using a fine water mist. All plant andequipment will be washed down before leaving site. Use wet rags toclean equipment and area, place rags in covered skip. Drivers mustalso wear the appropriate PPE.166Please refer to the <strong>Risk</strong> <strong>Assessment</strong> Guidance Notes for information on interpretation. Target Post-Control Rating = 10 Some Pre-Control ratings may be less than 10 but further controls are still to be considered.<strong>Assessment</strong> Date: March 13 Review Date: January 2014 Copies Issued To: Client / Principal Contractor(For Contract Specific SiteApproved for Issue:(Signature)UseGoody Demolition SupervisorKey:- Hazard Rating based on1 =Highly Unlikely, 2 =Unlikely, 3 = Possible, 4 = Probable, 5 = Regular, 6 = Continuousexposure:Key:- <strong>Risk</strong> Rating based on severity:1 = Trivial, 2 = Minor, 3 = Under”3-day” Injury, 4 = Over “3-day” Reportable Injury, 5 = Major Injury, 6 = FatalityPage 2 of 2


TRAINING & PPE REGISTERMethod statement to be issued by:OPERATIVESI confirm that I have had training with the currant tools/plant being used (as stated within the method statement ordiscussed on the tool box talks) and have been issued with the appropriate PPE and understand the Safe Systemsof Work employedNAME SIGNATURE DATEI confirm the above have had the correct training and the appropriate PPE issued to them necessary forthe safe completion of the task.SignedPrint NamePosition……………………………..……………………………..……………………………..


METHOD STATEMENT REGISTERMethod statement to be issued by:OPERATIVESI confirm that I have had an explanation of our Method Statement, <strong>Risk</strong> <strong>Assessment</strong>s, Health & Safety Policy andunderstand the Safe Systems of Work employedNAME SIGNATURE DATEI confirm the above have had the detailed Method Statement, incorporating the necessary State Systemsof Work, explained to them for the safe completion of the task.SignedPrint NamePosition……………………………..……………………………..……………………………..


DECLARATION OF HEALTH REGISTERHealth declaration requested by:OPERATIVESI confirm that I have no known medical conditions or on any medication and in signing this form I confirm thefollowing:-I declare that the information I have given is to the best of my knowledge and belief true and complete.NAME SIGNATURE ANY CONDITIONS Y/NDATEIf you have confirmed that you suffer from any medical condition or on any medication can you pleasestate your condition and/or medication below along with your name.NAME CONDITION MEDICATION