13.07.2015 Views

Risk Assessment

Risk Assessment

Risk Assessment

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

This general assessment can be amended to deal with any additional or alternative situation that may apply to a particular site. The contract detail is then to be entered and distribution noted below.RISK ASSESSMENT <strong>Risk</strong> <strong>Assessment</strong> No. Demo.002Operation / Task: Work in dusty conditions Employees at <strong>Risk</strong>: Those carrying out the workLocation / Area: The Pavillion - Cheriton Sports Ground Other Persons at <strong>Risk</strong>: Those nearbyKey Responsible Persons:Site SupervisorHazard<strong>Risk</strong>Pre-Control <strong>Risk</strong>RatingControl MeasuresPost-Control <strong>Risk</strong>Rating1 2 1x2 1 2 1x2CommentInhalation of dust hazard materialse.g. silica, Portland cement, MMMFetc. General dust is a hazardmaterialLong term damage to therespiratory system4520Ensure that dust control measures are in placeCarry out site survey for chemicals or specific materials144Provided that the controls areimplemented & maintained, theresidual risk will be lowInhalation of unknown materialsContact with the eyesContact with the skinAcute irritation with unknownmaterialsLong term damage to eyesDermatitis343555152015Provide & use respiratory protective equipment as a last resortProvide & use eye protectionEnsure welfare facilities are fully stocked, including barrier creams andoperators wash after every shift.231433893Please refer to the <strong>Risk</strong> <strong>Assessment</strong> Guidance Notes for information on interpretation. Target Post-Control Rating = 10 Some Pre-Control ratings may be less than 10 but further controls are still to be considered.<strong>Assessment</strong> Date: March 13 Review Date: January 2014Client / Principal ContractorCopies Issued To:(For Contract Specific SiteApproved for Issue:(Signature)UseGoody Demolition SupervisorKey:- Hazard Rating based on1 =Highly Unlikely, 2 =Unlikely, 3 = Possible, 4 = Probable, 5 = Regular, 6 = Continuousexposure:Key:- <strong>Risk</strong> Rating based on severity:1 = Trivial, 2 = Minor, 3 = Under”3-day” Injury, 4 = Over “3-day” Reportable Injury, 5 = Major Injury, 6 = FatalityPage 1 of 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!