13.07.2015 Views

Risk Assessment

Risk Assessment

Risk Assessment

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

This general assessment can be amended to deal with any additional or alternative situation that may apply to a particular site. The contract detail is then to be entered and distribution noted below.RISK ASSESSMENT <strong>Risk</strong> <strong>Assessment</strong> No. Demo.012cOperation / Task: Operation of 360 machine with bucket attachment Employees at <strong>Risk</strong>: Those carrying out the workLocation / Area: The Pavillion - Cheriton Sports Ground Other Persons at <strong>Risk</strong>: Those working nearbyKey Responsible Persons:Site SupervisorsHazard<strong>Risk</strong>Pre-Control <strong>Risk</strong>RatingControl MeasuresPost-Control <strong>Risk</strong>Rating1 2 1x2 1 2 1x2CommentFalls of size reduced materialsMoving parts of excavationequipmentInjuries by movement ofmechanical plantAmputation or crushing on contactwith moving parts of the excavator44652420Provide warning signs & set up exclusion zoneEnsure that all necessary guards are in place & observed214484Provided that the controls areimplemented & maintained, theresidual risk will be lowProjectilesDustInjury due to projectiles from theexcavations operationsInhalation of dust from excavationof ground.Eye irritation by dust from handling333544151212Set up exclusion zone ensure all operatives wear the correct PPE atall times – goggles or glasses, gloves furniture hide, boots, hi viz ,dust masks and helmetsProvide water sprays to limit dust emission, continuous use ifnecessary. Provide & ensure use of RPE for all personnel.Provision & use of eye protection111322322NoiseExposure to noise above secondexposure level3413Provide & ensure the use of adequate hearing protection122Rupture of hydraulic linesSpillage of hot oil and subsequentskin burns3515Good maintenance of machines and spill kitsProvide & ensure use of PPE122Please refer to the <strong>Risk</strong> <strong>Assessment</strong> Guidance Notes for information on interpretation. Target Post-Control Rating = 10 Some Pre-Control ratings may be less than 10 but further controls are still to be considered.<strong>Assessment</strong> Date: March 13 Review Date: January 2014 Copies Issued To: Client / Principal Contractor(For Contract Specific SiteApproved for Issue:(Signature)UseGoody Demolition SupervisorKey:- Hazard Rating based on1 =Highly Unlikely, 2 =Unlikely, 3 = Possible, 4 = Probable, 5 = Regular, 6 = Continuousexposure:Key:- <strong>Risk</strong> Rating based on severity:1 = Trivial, 2 = Minor, 3 = Under”3-day” Injury, 4 = Over “3-day” Reportable Injury, 5 = Major Injury, 6 = FatalityPage 1 of 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!