13.07.2015 Views

Risk Assessment

Risk Assessment

Risk Assessment

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

This general assessment can be amended to deal with any additional or alternative situation that may apply to a particular site. The contract detail is then to be entered and distribution noted below.RISK ASSESSMENT <strong>Risk</strong> <strong>Assessment</strong> No. Demo.043Operation / Task: Operation of lorries Employees at <strong>Risk</strong>: Those carrying out the workLocation / Area: The Pavillion - Cheriton Sports Ground Other Persons at <strong>Risk</strong>: Those working nearbyKey Responsible Persons:Site SupervisorsHazard<strong>Risk</strong>Pre-Control <strong>Risk</strong>RatingControl MeasuresPost-Control <strong>Risk</strong>Rating1 2 1x2 1 2 1x2CommentContact with moving plantMoving parts of skip lorryMaterial falling off from skip / tipperbodyInjuries by movement of lorriesAmputation or crushing on contactwith moving parts of the hydraulicplantInjury due to material from theloading operation443655242015Provide warning signs & set up exclusion zoneSite speed limit of max. 5mph drivers should have a safe place to waitduring the loading and unloading process, without being required topass through areas where there are moving vehiclesEnsure that all necessary guards are in place & observed andexclusion zone is observed whilst loading/unloading operations aretaking place.Set up exclusion zone. Where necessary provide & use sheeting.211243443Provided that the controls areimplemented & maintained, theresidual risk will be lowThis assessment to be read inconjunction with Dem22. All plantequipment must comply with PUWER1998. Use of banksmen to supervisereversing as required.DustInhalation of dust from handling ofdebris3412Provide water sprays to limit dust emission, continuous use ifnecessary. Provide & ensure use of RPE for all personnel. Wherenecessary provide & use sheeting.122Eye irritation by dust from handlingof debris3412Provision & use of eye protection. Dampen down whilst loadingmaterial to avoid particle release.122NoiseExposure to noise above secondexposure level3413Provide & ensure the use of adequate hearing protection122Rupture of hydraulic linesSpillage of hot oil and subsequentskin burns3515Good maintenance of lorryProvide & ensure use of PPE by driver as appropriate to operation.122Driving on siteVehicle movements. Contact by.Contact with. Major injury.4624Site speed limit usually 5 m.p.h.High level of personal awareness.Rotating flashing amber beacon displayed prominently on top ofvehicle.224Reversing of lorries5630If reversing is unavoidable additional safety measures should beconsidered, eg extra mirrors on vehicles and CCTV. Banksman to bein attendance whilst reversing is taking place.224Page 1 of 2

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!