13.07.2015 Views

Risk Assessment

Risk Assessment

Risk Assessment

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

This general assessment can be amended to deal with any additional or alternative situation that may apply to a particular site. The contract detail is then to be entered and distribution noted below.RISK ASSESSMENT <strong>Risk</strong> <strong>Assessment</strong> No. Demo.019aOperation / Task: Work at height – Machine operations Employees at <strong>Risk</strong>: Those carrying out the workLocation / Area: The Pavillion - Cheriton Sports Ground Other Persons at <strong>Risk</strong>: Those working nearbyAssessor: Key Responsible Persons: Site SupervisorsHazard<strong>Risk</strong>Pre-Control <strong>Risk</strong>RatingControl MeasuresPost-Control <strong>Risk</strong>Rating1 2 1x2 1 2 1x2CommentPersonnel falling during access toor exit from height & Personnelfalling from working area at heightFalls of personnel can lead toserious injury or death5630-Provide safe access by mobile platforms-Skilled & trained for work at heights- As a last resort, provide & use fall arrest equipment166Provided that the controls areimplemented & maintained, theresidual risk will be lowEquipment falling during raising toor lowering from heightFalls of equipment can lead toserious injury or death5630-Secured work platforms to prevent stray materials-Provide test & check hoists or lifting equipment and use of correctchains, slings etc.-Provide training for the correct use of lifting equipment144Trespass to work areaTrespass of unauthorised personscan lead to serious injury or death5630-Ensure that access equipment are secured at night to preventtrespass155Debris falling from heightEquipment handling to & fromheight can lead to equipmentdamage or injuries to personnel5525Ensure that a banksman is in attendance and that a 360 degreeexcavator using it’s grapple attachment carries out control removal ofmaterial from high placing debris into designated waste area.133Ensure only authorised personnel are allowed in demolition area.Ensure that any equipment supplied has been erected and inspectedby competent persons prior to use. And regular inspections are carriedout on the regular basis.Please refer to the <strong>Risk</strong> <strong>Assessment</strong> Guidance Notes for information on interpretation. Target Post-Control Rating = 10 Some Pre-Control ratings may be less than 10 but further controls are still to be considered.<strong>Assessment</strong> Date: March 13 Review Date: January 2014Client / Principal ContractorCopies Issued To:(For Contract Specific SiteApproved for Issue:(Signature)UseGoody Demolition SupervisorKey:- Hazard Rating based on1 =Highly Unlikely, 2 =Unlikely, 3 = Possible, 4 = Probable, 5 = Regular, 6 = Continuousexposure:Key:- <strong>Risk</strong> Rating based on severity:1 = Trivial, 2 = Minor, 3 = Under”3-day” Injury, 4 = Over “3-day” Reportable Injury, 5 = Major Injury, 6 = FatalityPage 1 of 1

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!