This general assessment can be amended to deal with any additional or alternative situation that may apply to a particular site. The contract detail is then to be entered and distribution noted below.RISK ASSESSMENT <strong>Risk</strong> <strong>Assessment</strong> No. Demo.033aOperation / Task: Brick Cleaning Operations Employees at <strong>Risk</strong>: Site operativesLocation / Area: The Pavillion - Cheriton Sports Ground Other Persons at <strong>Risk</strong>: Site personnel, VisitorsKey Responsible Persons:Managers & SupervisorsRef. Activity Hazard <strong>Risk</strong>01 Brick CleaningoperationsCuts, bruise, backinjuries & minorabrasionsFalls, slips, repetitivemovement strain, cutsPre-Control<strong>Risk</strong> Rating1 2 1xControl Measures23 3 9 Wear the correct PPE – Gloves, safety boots, and safetyspecs. Avoid repetitive lifting actions – situate palletsnext to cleaning pilePost-Control<strong>Risk</strong> Rating1 2 1x2Comment1 3 6 Health and Safety Plan strictly followed.Trained, competent operatives for all workactivities.02 Access/Egress toWorking areasUnauthorisedpersonnel.Coming into contact withdemolition zone,Uncontrolled collapse3 6 18 Site working areas will be regulated off from demolitionzones and warning signs displayed. All visitors report tosite office for Safety Induction.1 6 603 Chipping off mortar offbricksGrit particles fromoperations.Grit particles coming intocontact with eyes3 4 12 Wear safety spectacles / goggles to protect eyes 1 2 2Please refer to the <strong>Risk</strong> <strong>Assessment</strong> Guidance Notes for information on interpretation. Target Post-Control Rating = 10 Some Pre-Control ratings may be less than 10 but further controls are still to be considered.<strong>Assessment</strong> Date: March 13 Review Date: January 2014 Copies Issued To: Client / Principal ContractorApproved for Issue:(Signature)(For Contract Specific SiteUseGoody Demolition SupervisorKey:- Hazard Rating based onexposure:1 =Highly Unlikely, 2 =Unlikely, 3 = Possible, 4 = Probable, 5 = Common, 6 = Regular, 7 = ContinuousKey:- <strong>Risk</strong> Rating based on severity:1 = Trivial, 2 = Minor, 3 = Under”3-day” Injury, 4 = Over “3-day” Reportable Injury, 5 = Major Injury, 6 = Fatality(1 person),7 = Multiple Fatality(2+ persons)
This general assessment can be amended to deal with any additional or alternative situation that may apply to a particular site. The contract detail is then to be entered and distribution noted below.RISK ASSESSMENT <strong>Risk</strong> <strong>Assessment</strong> No. Demo.033Operation / Task: Demolition Operations Employees at <strong>Risk</strong>: Site operativesLocation / Area: The Pavillion - Cheriton Sports Ground Other Persons at <strong>Risk</strong>: Site personnel, VisitorsKey Responsible Persons:Managers & SupervisorsRef. Activity Hazard <strong>Risk</strong>Pre-Control<strong>Risk</strong> Rating1 2 1xControl Measures201 Demolition operations Demolition of structures Falls, falling objects, 3 6 18 Erect hoardings, barriers and fencing as required.Display warning signs. Safe System of Work to controlcollapse of structure.Post-Control<strong>Risk</strong> Rating1 2 1x21 6 6CommentHealth and Safety Plan strictly followed.Trained, competent operatives for all workactivities.02 Access/Egress toWorking areasUnauthorisedpersonnel.Falls, falling objects,Uncontrolled collapse3 6 18 Site working areas will be fenced, hoarding erected andwarning signs displayed. All visitors report to site officefor Safety Induction.1 6 603 All Tasks. Noise, dust fromoperations.Hearing damage.Environmental issues3 4 12 All construction plant and vehicles constructed to nationalstandards and industry norm that includes noiseattenuation. Noise <strong>Risk</strong> <strong>Assessment</strong> carried out for variousitems of plant and hearing protection identified.1 2 2 Use of water to damp down works tominimise dust.04 Driving on site Plant and vehiclemovements.Obstruction.Contact by.Contact with.Major injury.5 6 30 Site speed limit usually 5 m.p.h.High level of personal awareness.Rotating flashing amber beacon displayed prominentlyon top of vehicle.2 2 4 See also task specific assessments.05 Hot Works Sparks, Fire, Explosion Fatality, Major injuryProperty, equipmentdamage3 6 18 Trained, competent operatives. Hot works Permit to beused. Check for hot spots. Fire fighting equipmentavailable in working area.1 6 6Please refer to the <strong>Risk</strong> <strong>Assessment</strong> Guidance Notes for information on interpretation. Target Post-Control Rating = 10 Some Pre-Control ratings may be less than 10 but further controls are still to be considered.<strong>Assessment</strong> Date: March 13 Review Date: January 2014 Copies Issued To: Client / Principal ContractorApproved for Issue:(Signature)(For Contract Specific SiteUseGoody Demolition SupervisorKey:- Hazard Rating based onexposure:1 =Highly Unlikely, 2 =Unlikely, 3 = Possible, 4 = Probable, 5 = Common, 6 = Regular, 7 = ContinuousKey:- <strong>Risk</strong> Rating based on severity:1 = Trivial, 2 = Minor, 3 = Under”3-day” Injury, 4 = Over “3-day” Reportable Injury, 5 = Major Injury, 6 = Fatality(1 person),7 = Multiple Fatality(2+ persons)