13.07.2015 Views

Risk Assessment

Risk Assessment

Risk Assessment

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

This general assessment can be amended to deal with any additional or alternative situation that may apply to a particular site. The contract detail is then to be entered and distribution noted below.RISK ASSESSMENT <strong>Risk</strong> <strong>Assessment</strong> No. Demo.033aOperation / Task: Brick Cleaning Operations Employees at <strong>Risk</strong>: Site operativesLocation / Area: The Pavillion - Cheriton Sports Ground Other Persons at <strong>Risk</strong>: Site personnel, VisitorsKey Responsible Persons:Managers & SupervisorsRef. Activity Hazard <strong>Risk</strong>01 Brick CleaningoperationsCuts, bruise, backinjuries & minorabrasionsFalls, slips, repetitivemovement strain, cutsPre-Control<strong>Risk</strong> Rating1 2 1xControl Measures23 3 9 Wear the correct PPE – Gloves, safety boots, and safetyspecs. Avoid repetitive lifting actions – situate palletsnext to cleaning pilePost-Control<strong>Risk</strong> Rating1 2 1x2Comment1 3 6 Health and Safety Plan strictly followed.Trained, competent operatives for all workactivities.02 Access/Egress toWorking areasUnauthorisedpersonnel.Coming into contact withdemolition zone,Uncontrolled collapse3 6 18 Site working areas will be regulated off from demolitionzones and warning signs displayed. All visitors report tosite office for Safety Induction.1 6 603 Chipping off mortar offbricksGrit particles fromoperations.Grit particles coming intocontact with eyes3 4 12 Wear safety spectacles / goggles to protect eyes 1 2 2Please refer to the <strong>Risk</strong> <strong>Assessment</strong> Guidance Notes for information on interpretation. Target Post-Control Rating = 10 Some Pre-Control ratings may be less than 10 but further controls are still to be considered.<strong>Assessment</strong> Date: March 13 Review Date: January 2014 Copies Issued To: Client / Principal ContractorApproved for Issue:(Signature)(For Contract Specific SiteUseGoody Demolition SupervisorKey:- Hazard Rating based onexposure:1 =Highly Unlikely, 2 =Unlikely, 3 = Possible, 4 = Probable, 5 = Common, 6 = Regular, 7 = ContinuousKey:- <strong>Risk</strong> Rating based on severity:1 = Trivial, 2 = Minor, 3 = Under”3-day” Injury, 4 = Over “3-day” Reportable Injury, 5 = Major Injury, 6 = Fatality(1 person),7 = Multiple Fatality(2+ persons)

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!