13.07.2015 Views

Design Requirements for Sewage Pumping Stations - The City of ...

Design Requirements for Sewage Pumping Stations - The City of ...

Design Requirements for Sewage Pumping Stations - The City of ...

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

<strong>City</strong> <strong>of</strong> Wentzville, MissouriEngineering <strong>Design</strong> Criteriab. Existing Sewer SystemLocation and type <strong>of</strong> gravity system the <strong>for</strong>ce main willdischarge into.c. Future <strong>of</strong> Sanitary Sewer Service1) State whether the entire development will be servicedby the proposed phase or if several phases will beinvolved.2) State the number <strong>of</strong> lots this phase will encompassinitially and finally if future phases are to beconstructed.3) State whether other areas outside <strong>of</strong> the developmentmay be tributary to the pump station.3. Pump Station and Force Main Calculationa. Population EquivalentNb = Number <strong>of</strong> specified types <strong>of</strong> buildingsNp = number <strong>of</strong> persons per unit = 3.7PE = Population Equivalent – Nb x Np = 3.7 x Nbb. Average Daily Flow (ADF)F = Flow (See section 3.04.04 and 3.04.05)I = Infiltration Flow from:1) gravity system2) 8 hour retention chambers3) 12” piping from retention chambers to wet wellI = Piping diameter (in.) x piping length (miles x 200gal./in.dia./mi,/day)ADF (GPD) = F + IADF (GPM) = ADF (GPD) / 1440 (min./day)c. Peak Daily Flow (PDF)PDF (GPD) = Peaking Factor x ADF (GPD)PDF (GPM) = Peaking Factor x ADF (GPD)Peaking Factor – See section 3.04.054 - 2 Approved 6/10/09

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!