<strong>Society</strong> <strong>of</strong> <strong>American</strong> Military <strong>Engineers</strong><br />

U.S. <strong>Army</strong> <strong>Corps</strong> <strong>of</strong> <strong>Engineers</strong><br />

Omaha District<br />

<strong>COL</strong> Robert J. <strong>Ruch</strong><br />

Omaha District Commander<br />

January 2012<br />

US <strong>Army</strong> <strong>Corps</strong> <strong>of</strong> <strong>Engineers</strong><br />

BUILDING STRONG ®<br />

BUILDING STRONG ®


Military boundary<br />

Civil Works boundary<br />

• 700,000 square miles<br />

• Nearly 60 locations<br />

• 27 Dams (including 6<br />

hydropower main stems)<br />

• Protective Design MCX<br />

• 247 miles River Navigation<br />

• Transportation MCX<br />

• 284 Recreation Areas<br />

• USACE Rapid Response<br />

• 99 miles Missouri National<br />

• Interior Design CX<br />

Recreation River<br />

• Hydrant Fuels CX<br />

• 6,627 miles <strong>of</strong> Shoreline<br />

• MMRP Design Center<br />

CIVIL WORKS FY12 ($524 M)<br />

• 44,910 910 Regulatory Permit<br />

• Religious Facilities Center<br />

<strong>of</strong> Standardization (CoS)<br />

Flood Protection, Navigation, Hydropower,<br />

Recreation, Regulatory, Ecosystem<br />

Restoration, Flood Control and Coastal<br />

Applications<br />

• 53 Federally-recognized Tribal<br />

• Access Control Points CoS<br />

Emergencies (FCCE)<br />

Nations<br />

• Regulatory Program in 6 states<br />

• PProtected t t d CCultural lt l Sit Sites<br />

• Real Estate Services in 10 states<br />

• > 1,200 projects<br />

MILCON FY12($454 M)<br />

18 Active Installations<br />

3 Readiness Centers<br />

> 400 Projects<br />

Special Projects FY12($300 M)<br />

2<br />

ER FY12 ($179 M)<br />

> 550 Projects<br />

BUILDING STRONG ®


Omaha District Missions<br />

� MILITARY BRANCH<br />

• DDesign i & CConstruction t ti MManagement t<br />

• 10 Active Air Force Installations<br />

• 2 Air Force Reserve Installations<br />

• 1 <strong>Army</strong> Installation & 1 Reserve<br />

• 3 <strong>Army</strong> Ammunition Plants<br />

• 2 Major Reserve Commands<br />

� ENVIRONMENTAL BRANCH<br />

• Environmental Remediation Work<br />

• FUDS, MMRP<br />

• More than 550 Projects Nationwide<br />

� SPECIAL PROJECTS BRANCH<br />

• DLA Fuels Program & SRM<br />

CONUS/OCONUS<br />

• MILCON SRM, EPA, & IIS<br />

• Contingency/ Rapid Response Nationwide<br />

� CIVIL WORKS BRANCH<br />

• Flood Protection, Navigation, Hydropower,<br />

Water Supply, Water Quality, Recreation,<br />

Irrigation Irrigation, Fish & Wildlife, Wildlife Regulatory,<br />

Regulatory<br />

Ecosystem Restoration, Flood Control and<br />

Coastal Emergencies (FCCE)<br />

3<br />

BUILDING STRONG ®


District Mission Areas<br />

BUILDING STRONG ®


800<br />

600<br />

400<br />

200<br />

0<br />

Omaha District Workload<br />

CW<br />

MIL<br />

FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15<br />

CW 244 197 243 240 304 524 189 191 192<br />

MIL 640 661 591 576 254 454 310 434 355<br />

ER 193 186 296 230 227 179 170 170 184<br />

SP NA NA 143 220 346 300 279 288 282<br />

$M 1077 1044 1273 1266 1131 1457 948 1083 1013<br />

5<br />

ER<br />

SP<br />

BUILDING STRONG ®


Civil Works Branch<br />

Perry Creek Boyer Bend<br />

Western Sarpy<br />

AAntelope t l CCreek k<br />

6<br />

BUILDING STRONG ®


$600.0<br />

$550.0<br />

$500.0<br />

$450.0<br />

$400.0<br />

$350.0<br />

$300.0 $<br />

$250.0<br />

$200.0<br />

$150.0<br />

$100.0<br />

$50.0<br />

$0.0<br />

CW – Program<br />

FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15<br />

Millions $$<br />

FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15<br />

Regulatory 6.6 7.5 7.6 7.8 8.2 8.2 8.4 8.5 8.6<br />

O & M 69.5 56 59.8 76.4 80.7 180 72 72 73<br />

GI 2.7 3.5 3.8 4.6 3.9 1.4 2 2 2.5<br />

CG 79.4 65 89.7 80.2 80.9 45 53 55.5 64.5<br />

FCCE 35.2 21 17.8 9.0 99.0 262.5 45 45 35<br />

STIM 0 0 64.2 44.0 2.9 2 0.5 0 0<br />

Cont Funds 17.5 28.6 25 8 8 8<br />

TOTALS $ 193.4 $ 153.0 242.9 239.5 304.2 524.1 188.9 191.0 191.6<br />

7<br />

BUILDING STRONG ®


Civil Works Opportunities<br />

PProject j t LLocation/Type ti /T <strong>of</strong> f PProject j t CCost t RRange Ad Adv DDate t<br />

Missouri River Recovery<br />

- SWH – Flood Damage Repair $1M - $5M 07/2012<br />

-SWH – Deer Island/Little Sioux (Phase ( 2) )<br />

$1M - $10M 08/2012<br />

- SWH – New Projects (TBD) $1M - $5M 08/2012<br />

Yellowstone Corridor Study, MT and ND<br />

- Socioeconomic Study $100K - $500K 07/2012<br />

Big Bend Project<br />

- Rehab Powerhouse Crane $100K - $500K 07/2012<br />

- Thrust Bearing Cooler $500K - $1M 01/2012<br />

Gavin’s Gavin s Point Project<br />

- Power Plant Generator Step-Up Transformers $1M - $5M 10/2012<br />

- Trash Racks $500K - $1M 05/2012<br />

8<br />

BUILDING STRONG ®


Civil Works Opportunities<br />

Project Location/Type <strong>of</strong> Project Cost Range Adv Date<br />

Fort Randall Project<br />

- SF6 Breakers $1M - $5M 05/2012<br />

- Rehab Tailrace Crane $100K - $500K 08/2012<br />

- 115KV Switchyard Upgrade $5M - $10M 02/2013<br />

FFort t PPeck k Project P j t<br />

- Rehab Unit 2 $10M - $15M 06/2012<br />

- Transformer T3 & T4 $1M - $5M 08/2013<br />

- Replace Oil Filled Cable $1M - $5M 08/2013<br />

Garrison Project<br />

- Switchyard Autotransformer $1M - $5M 06/2012<br />

9<br />

BUILDING STRONG ®


Civil Works Opportunities<br />

Project Location/Type <strong>of</strong> Project Cost Range Adv Date<br />

Oahe Project<br />

- Replace Transformer Accessories $100K - $500K 09/2012<br />

- Switchyard Upgrade $5M - $10M 02/2013<br />

Missouri River Basin Flood Repairs 2012<br />

- Missouri River Levees $250M - $300M Jan-Oct<br />

- Missouri River Mainstem Dams $150M - $175M Jan-Aug<br />

10<br />

BUILDING STRONG ®


CW – NWO Successes<br />

� Antelope Creek<br />

in Lincoln Lincoln, NE<br />

► Great example <strong>of</strong><br />

Collaboration<br />

� Use <strong>of</strong> ARRA $<br />

► Met our commitments<br />

and then some<br />

► Improved infrastructure<br />

Within Missouri River basin.<br />

11<br />

BUILDING STRONG ®


Military Programs Branch<br />

Wilderness Road Brigade Battalion HQ<br />

MI Battalion HQ Facility<br />

Wilderness Road Dining Facility<br />

WIT Complex Barracks<br />

BUILDING STRONG ®


1200<br />

1000<br />

800<br />

600<br />

400<br />

200<br />

0<br />

Omaha District - MILCON Program Trend Assessment<br />

FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15<br />

Millions $$<br />

FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15<br />

Air Force $ 260.0 $ 193.0 $ 113.3 $ 127.5 $ 60.3 $ 88.0 $ 46.0 $ 32.4 $ 56.0<br />

USSTRATCOM $ - $ - $ - $ - $ - $ 120.0 $ 164.0 $ 160.0 $ 103.0<br />

NSA $ - $ - $ - $ - $ - $ 141.0 $ - $ - $ -<br />

13th CAB $ - $ - $ - $ - $ - $ 239.0 $ - $ 232.0 $ 129.0<br />

<strong>Army</strong> $ 340.0 $ 428.0 $ 383.7 $ 317.5 $ 109.0 $ 7.0 $ 48.0 $ - $ 47.0<br />

DOD $ 27.4 $ - $ 12.0 $ 49.1 $ 42.7 $ - $ 52.0 $ 10.0 $ 20.0<br />

FSRM (O&M) $ 13.0 $ 40.0 $ 82.0 $ 38.0 $ - $ - $ - $ - $ -<br />

TOTALS $ 640.4 $ 661.0 591.0 $ 532.1 $ 212.0 $ 454.0 $ 310.0 $ 434.4 $ 355.0<br />

NOTE: <strong>Army</strong> Based on Program Objective Memorandun (POM) FY12 -FY16 - INCLUDES 13th COMBAT AVIATION BRIGADE AT FT CARSON<br />

Air Force Program Based on FYDP & Reduced Total Obligation Authority - Assumes Marginal Program Increase in out years.<br />

FY12 STRATCOM Replacement R l t Facility F ilit <strong>Of</strong>futt <strong>Of</strong>f tt AFB - PA ($564 Mil) Incremental I t l Funding F di Shown Sh FY12 - FY15.<br />

FY15<br />

BUILDING STRONG ®


FY12 Military Construction <strong>Army</strong> (MCA)<br />

Location Description Advertise Bid Open<br />

Ft Carson<br />

Brigade Headquarters PN 65602 P2:<br />

336543<br />

Cur/Act<br />

Award QTR<br />

CCL<br />

Award ($000)<br />

Remarks<br />

27-Jan-12 30-Mar-12 13-Apr-12 3 $12,973 8(a) 100% Designed - Invitation to Bid (IFB)<br />

Ft Carson Barracks PN 77264 P2:336548 13-Feb-12 5-Apr-12 27-Apr-12 3 $60,360<br />

Ft Carson Barracks PN 77265 P2:336545 13-Feb-12 5-Apr-12 27-Apr-12 3 $41,441<br />

Ft Carson<br />

ASB Maintenance Hangar PN 77306<br />

P2: 336558<br />

6-Jan-12 15-Feb-12 6-Apr-12 3 $54,955<br />

Ft Carson Control Tower PN 77302 P2:336560 18-Jan-12 2-Mar-12 5-Apr-12 3 $12,252<br />

Ft Carson<br />

Ft Carson<br />

Ft Carson<br />

Aircraft Loading Apron - Infrastructure<br />

PN 77319 P2:336561<br />

SOF - TUAV Hangar PN 69278<br />

P2:156960<br />

SOF Classified Storage Facility<br />

PN 80234<br />

14-Feb-12 18-Mar-12 4-Apr-12 3 $30,631<br />

Design Build Best Value RFP - Unrestricted<br />

Solicitation by CENWO<br />

Design Build Best Value RFP - Unrestricted<br />

Solicitation by CENWO<br />

Design Build Best Value RFP - Unrestricted<br />

Solicitation by CENWO<br />

Design Build Best Value RFP - Unrestricted<br />

Solicitation by CENWO<br />

Small Business To be determined. 100% Designed -<br />

Inviation for Bid (IFB) Four (4) Contract Actions<br />

Sevice Disabled Vet (Re-advertisement) 100%<br />

13-Feb-12 13 Feb 12 15-Mar-12 15 Mar 12 22-Mar-12 22 Mar 12 2 $3 $3,320 320<br />

Designed - Inviation for Bid (IFB)<br />

27-Apr-12 28-May-12 5-Jun-12 3 $1,620<br />

Small Business To be determined. 100% Designed -<br />

Inviation for Bid (IFB)<br />

BUILDING STRONG ®


FY12 Military Construction Air Force (MCAF)<br />

Location Description Advertise Bid Open<br />

Minot<br />

Minot<br />

Minot<br />

AF<br />

Academy<br />

Dormitory (168 Room)<br />

QJVF092001<br />

P2:334786<br />

B-52 3-BAY<br />

CONVENTIONAL<br />

MUNITIONS -<br />

QJVF092010<br />

P2: 334785<br />

B-52 TWO-BAY PHASE<br />

MAINTENANCE DOCK -<br />

QJVF092012 P2:<br />

334784<br />

Large Vehicle<br />

Inpspection<br />

XQPZ044003<br />

Cur/Act<br />

QTR<br />

Award<br />

CCL<br />

($000)<br />

15-Nov-11 17-Jan-12 5-Feb-12 2 $19,820<br />

Remarks<br />

CURRENTLY ADVERTISED - Unrestricted -<br />

100% Design Bid Build<br />

14-Feb-12 18-Mar-12 4-Apr-12 3 $10,450 Small Business - Design Build RFP<br />

14-Feb-12 18-Mar-12 4-Apr-12 3 $30,631 Unrestricted - Design Build RFP<br />

18-Nov-11 18-Jan-12 24-Feb-12 1 $12,072<br />

15<br />

CURRENTLY ADVERTISED - 8(a)<br />

Competitive - 100% Design Build Best Value<br />

RFP<br />

BUILDING STRONG ®


Environmental Remediation<br />

BBranch h<br />

Eglin AFB, FL Seymour Johnson AFB, NC<br />

Soil Remediation<br />

Well drilling at FE Warren AFB,<br />

WY, former Atlas Missile Site<br />

BUILDING STRONG ®


Environmental Remediation<br />

Mission<br />

�� Value-added Value added environmental services to<br />

Federal agencies including:<br />

� Investigations<br />

� St Studies di<br />

� Remedial Design<br />

� Remedial Actions, including rapid response<br />

� Long-Term Operation/Long-Term<br />

Maintenance (LTO/LTM)<br />

� Militar Military MMunitions nitions Response Program<br />

(MMRP)<br />

� Emphasis is on remedy in place (RIP),<br />

response complete (RC) and site closeouts.<br />

17<br />

BUILDING STRONG ®


Beale AFB (ACC)<br />

Travis AFB (AMC)<br />

Vandenberg AFB<br />

(AFSPC)<br />

Legend<br />

Omaha District Military<br />

Boundaries<br />

Northwestern Division<br />

Boundaries<br />

Omaha District<br />

Major Installations<br />

Minot AFB (ACC)<br />

Grand Forks AFB (AMC)<br />

Twin Cities AAP<br />

Ft McCoy<br />

Badger AAP<br />

KI Sawyer AFB<br />

(BRAC)<br />

Mountain Home AFB<br />

Ell Ellsworth th AFB<br />

(ACC)<br />

(ACC)<br />

Dover AFB (AMC)<br />

F.E. Warren AFB<br />

(AFSPC) Cornhusker AAP<br />

<strong>Of</strong>futt AFB<br />

(ACC)<br />

Iowa AAP<br />

Andrews AFB (AFD-W)<br />

Nellis AFB<br />

(ACC)<br />

Buckley AFB (AFSPC)<br />

Shriever AFB (AFSPC)<br />

Peterson ete so AFB ( (AFSPC) S C)<br />

USAF Academy<br />

Ft Carson<br />

Whiteman<br />

NORAD<br />

AFB (ACC)<br />

McConnell AFB<br />

Scott AFB<br />

(AMC)<br />

Langley AFB (ACC)<br />

Seymour Johnson AFB<br />

(ACC)<br />

Pope AFB (AMC)<br />

Kirtland AFB<br />

Pueblo Depot (AMC)<br />

Shaw AFB (ACC)<br />

(AFMC)<br />

Myrtle Beach AFB<br />

Holloman AFB<br />

(ACC)<br />

Cannon AFB (ACC)<br />

Maxwell AFB<br />

(AETC)<br />

(BRAC)<br />

Charleston AFB (AMC)<br />

Davis-Monthan AFB<br />

(ACC)<br />

Dyess AFB<br />

(ACC) Barksdale AFB<br />

Goodfellow AFB<br />

(ACC)<br />

(AETC)<br />

Moody AFB (AFSPC)<br />

18<br />

Eglin AFB<br />

(AFMC)<br />

MacDill AFB (AMC)<br />

BUILDING STRONG ®


Environmental Remediation<br />

Current Workload<br />

INSTALLATIONS STATES<br />

ER 44 26<br />

MMRP 106 38<br />

ER/MMRP 122 41<br />

RAPID RESPONSE (RR) 22 18<br />

TOTAL ER/MMRP/RR 135 41<br />

19<br />

BUILDING STRONG ®


$400.0<br />

$300.0<br />

$200 $200.0 0<br />

$100.0<br />

$0.0<br />

Environmental Remediation<br />

FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15<br />

Millions $$<br />

FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14 FY15<br />

<strong>Army</strong> ERP/BRAC/EQ 23 20 45 19 21 30 17 14 31<br />

FUDS 26 29 36 37 88 22 31 32 30<br />

AF ERP/BRAC/EQ 85 109 156 175 118 127 122 124 123<br />

Superfund/ESFO 60 28 59 0 0 0 0 0 0<br />

227<br />

TOTALS 194 186 296 231 227 179 170 170 184<br />

20<br />

BUILDING STRONG ®


Environmental Remediation<br />

EExecution ti Methods M th d<br />

� ~95% <strong>of</strong> environmental work is contracted out.<br />

� Primarily utilize Environmental Remediation<br />

Services (ERS) Indefinite Delivery Indefinite<br />

Quantity (IDIQ)<br />

� Emphasis on developing and utilizing small<br />

bbusiness i (SB) fi firms.<br />

� Project Acquisition Strategy Board determines<br />

appropriate i t method th d <strong>of</strong> f execution. ti<br />

� Regional sharing <strong>of</strong> ERS contracts within NWD.<br />

21<br />

BUILDING STRONG ®


Environmental Remediation<br />

Opportunities<br />

• Multi Environmental Government Acquisition (MEGA):<br />

• MEGA is a combined acquisition strategy with multiple USACE Districts.<br />

• The acquisition strategy includes combinations <strong>of</strong> Unrestricted and Small<br />

Business ERS; A-E; Pre-Placed Remedial Action (PRAC); and Environmental<br />

Consultation Services contracts that are national and/or regional.<br />

• Current Status:<br />

• Acquisition Strategy and Plan has been approved.<br />

• MEGA Management Plan has been approved<br />

• Statement <strong>of</strong> Work developed collaboratively by all eight Districts.<br />

• Kansas City District submitted first solicitation and made first award – AE.<br />

22<br />

BUILDING STRONG ®


MEGA Participants<br />

� The 3 USACE Divisions involved in the MEGA are:<br />

► Northwestern Division (NWD)<br />

• Omaha<br />

• Kansas City<br />

• Seattle<br />

► Southwestern Division (SWD)<br />

• Tulsa<br />

• Fort Worth<br />

► South Pacific Division (SPD)<br />

• SSacramento t<br />

• Albuquerque<br />

• Los Angeles<br />

23<br />

BUILDING STRONG ®


MEGA Specifications<br />

� Total $7 $7.07B 07B<br />

� 5 Year strategy – Based on approval <strong>of</strong><br />

MEGA Acquisition Plan<br />

� Acquisition Strategy approved by OSD on<br />

MMarch h 27 27, 2011<br />

� Acquisition Plan approved by PARC on<br />

May 23, 2011<br />

24<br />

BUILDING STRONG ®


MEGA Specifications<br />

� Total MEGA approved capacity - $7 $7.07B 07B<br />

� 95 MATOC pools (Total <strong>of</strong> 447 contracts)<br />

� 27 BBrooks k AAct t AA-E E pools l<br />

� Most MATOC pools will have 5 Contractors<br />

� Contracts 3 year base plus 2 year option<br />

A Total <strong>of</strong> 474 Contracts may be Awarded!<br />

25<br />

BUILDING STRONG ®


Approved MEGA Strategy<br />

► Environmental Remediation Services – 562910<br />

• NNationwide ti id $2B<br />

• NWD, SPD, SWD Regional $2B<br />

► Military Munitions Response Program<br />

• NWD Regional $750M<br />

► Pre-Placed Remedial Action Contracts<br />

• NWD Regional $1.5B<br />

► A-E Services – NAICS 541330<br />

• NWD Regional $320M<br />

► Environmental Consulting Services - 541620<br />

• NWD NWD, SPD SPD, SWD Regional $500M<br />

26<br />

BUILDING STRONG ®


Unprecedented Support <strong>of</strong> Small Business<br />

61 %<br />

Small<br />

HUBZone<br />

$311 Million = 4% 63 Contracts<br />

SDVOSB<br />

$423.5 Million = 6% 68 Contracts<br />

Section 8 (a)<br />

$978.5 Million = 14% 106 Contracts<br />

Business<br />

Small Business (no subcategory)<br />

$2.587 Billion = 37% 133 Contracts<br />

MEGA $7.07 $7 07 Billion Billi<br />

Unrestricted<br />

$2.77 Billion = 39% 104 Contracts<br />

27<br />

BUILDING STRONG ®


Multiple Environmental Government Acquisition - $7.07B Plan<br />

13<br />

Advertized<br />

Total<br />

MEGA Progress<br />

22<br />

* A-E Brooks Act contracts<br />

10<br />

12<br />

4<br />

28<br />

10*<br />

20<br />

6<br />

4 4<br />

BUILDING STRONG ®


MEGA Points <strong>of</strong> Contact<br />

� Linda White White, PE PE, PMP (technical)<br />

►Linda.J.White@usace.army.mil<br />

►402 ►402-995-2743 995 2743<br />

� Loreen Blume (contractual)<br />

►Loreen.K.Blume@usace.army.mil<br />

@<br />

►402-995-2092<br />

BUILDING STRONG ®


MEGA Contacts<br />

� Albuquerque – (C) Erica.M.Talley@<br />

� Fort Worth – (P) Mark.E.Simmons@;<br />

(C) Elizabeth.A.Crawford@<br />

� Kansas City – (C) Shelley.Thomas@<br />

�� Los Angeles – (C) Patricia Patricia.B.Bonilla@ B Bonilla@<br />

� Omaha - (C) Loreen.K.Blume@; (P) Linda.J.White@<br />

� Sacramento – (P) Christopher.E.Prescott@<br />

(C) ( ) Colette.C.Nalley@ y@<br />

� Seattle – (P) Robert.l.Frazier@; (C) Bonnie.I.Kirmse@<br />

� Tulsa – (C) Brenda.K.Anderson@<br />

@USACE @USACE.<strong>Army</strong>.mil <strong>Army</strong> mil (C) Contracting (P) Project Management<br />

30<br />

BUILDING STRONG ®


Environmental Remediation<br />

FY12 Omaha Opportunities<br />

Cost Proposed Proposed<br />

Project Location/Type <strong>of</strong> Project Range Adv Date Awd Date<br />

(Mo/Yr) (Mo/Yr)<br />

•MEGA - Small Business ERS w/MMRP IDIQ $250M 5/11 2/12<br />

Multi Award Task Order Contract (MATOC)<br />

Nationwide , 5 contract pool<br />

•MEGA - Small Business Environmental $60M 2/12 6/12<br />

Consulting IDIQ Multi Award Task Order<br />

Contract (MATOC) NWD Boundaries and<br />

existing USACE customers customers, 3 contract pool<br />

31<br />

BUILDING STRONG ®


Environmental Remediation<br />

FY12 Omaha Opportunities<br />

Cost Proposed Proposed<br />

Project Location/Type <strong>of</strong> Project Range Adv Date Awd Date<br />

(Mo/Yr) (Mo/Yr)<br />

•MEGA – 8a Environmental $60M 2/12 6/12<br />

Consulting IDIQ Multi Award Task Order<br />

Contract (MATOC) NWD Boundaries and<br />

existing USACE customers, 3 contract pool<br />

•MEGA - Unrestricted Environmental $400M 2/12 6/12<br />

Remediation Services (ERS) IDIQ MATOC<br />

Nationwide Nationwide, 5 contract pool<br />

32<br />

BUILDING STRONG ®


Environmental Remediation<br />

Opportunities – FY12<br />

Cost Proposed Proposed<br />

Project Location/Type <strong>of</strong> Project Range Adv Date Awd Date<br />

(Mo/Yr) (Mo/Yr)<br />

•Pueblo Chemical Depot , CO $ 9M 10/12 12/12<br />

Remediation Services, Site Specific (BRAC)<br />

33<br />

BUILDING STRONG ®


Special p Projects j Branch<br />

Temporary Pumping Stations<br />

USACE HPO<br />

Indiana Dunes National Lakeshore, IN – DOI NPS<br />

Fuels Program<br />

BUILDING STRONG ®


Special Projects<br />

Mi Mission i & FFunction ti<br />

� Special Projects Branch mission: Execution <strong>of</strong><br />

programs and projects formally known as “Support for<br />

Others”, “Environmental Support for Others”, and<br />

“Interagency Interagency and International Services (IIS)” (IIS)<br />

� Branch is responsible for assembling project delivery<br />

teams to manage g reimbursable funded customers such<br />

as:<br />

► EPA, DOI, DOE, DoD-FSRM (Facility Sustainment,<br />

Restoration & Modernization)<br />

► DHS, DLA/ DESC and VA<br />

35<br />

BUILDING STRONG ®


Special Projects<br />

Mi Mission i & FFunction ti<br />

� Provide national and international time-sensitive<br />

as well as non time-sensitive support <strong>of</strong><br />

homeland security/defense, disaster, and<br />

infrastructure f<br />

work<br />

� Utilize Internal District & External USACE staff<br />

resources tto manage project j t execution ti<br />

� Execution tools include discretionary/flexible<br />

cost reimbursement contract mechanisms to<br />

accomplish the mission to serve the nation and<br />

all Federal Agencies<br />

36<br />

BUILDING STRONG ®


$400.0<br />

$300.0<br />

$200 $200.0 0<br />

$100.0<br />

$0.0<br />

Special p Projects j Trends<br />

FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17<br />

Millions $$<br />

FY09 FY10 FY11 FY12 FY13 FY14 FY15 FY16 FY17<br />

Contingency 34.8 27 161 75 25 25 25 25 25<br />

FSRM 11.7 98 101 100 70 70 70 70 70<br />

Fuels 41.5 63 46 90 150 155 160 160 160<br />

IIS 19.3 4 12 11 5 5 5 5 5<br />

EPA 35 35.3 3 28 26 24 28 28 28 28 28<br />

TOTALS 143 220 346 300 278 283 288 288 288<br />

37<br />

BUILDING STRONG ®


Special Projects Opportunities<br />

Cost Proposed Proposed<br />

Contract / Project Range Adv Date Awd Date<br />

�Rapid Rapid Response 5 IDIQ (four contracts) $245M Total<br />

Environmental Response Contract (SATOC)<br />

(Mo/Yr) (Mo/Yr)<br />

• Unrestricted $80M 4/22/11* 12/19*<br />

• Small Business $95M 4/22/11* 4/22/11 3/12<br />

• Service Disabled Vet $35M 6/12 3/13<br />

• 8a $35M 6/12 5/13<br />

Note: * Actual Advertised<br />

38<br />

BUILDING STRONG ®


Omaha District<br />

Points <strong>of</strong> Contact<br />

� Deputy District Engineer Ted Streckfuss<br />

402-995-2003<br />

� Chief, Civil Works Branch Bert Matya<br />

402-995-2718<br />

� Chief, Environmental Remediation Drew Reckmeyer<br />

Branch 402-995-2764<br />

�� Chief Chief, Military Branch Vincent Turner<br />

402-995-2781<br />

� Chief, C e , Planning a g Branch a c Kayla ay a Eckert-Uptmor<br />

c e t Upt o<br />

402-995-2693<br />

� Chief, Special Projects Branch Greg Herring<br />

402-995-2644<br />

39<br />

BUILDING STRONG ®


Questions?<br />

40<br />

BUILDING STRONG ®