Regional Installation Facilities and Environment Overview 10 March ...

Regional Installation Facilities and Environment Overview 10 March ...

Regional Installation Facilities and Environment Overview 10 March ...

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Regional</strong><br />

<strong>Installation</strong> <strong>Facilities</strong> <strong>and</strong> <strong>Environment</strong><br />

<strong>Overview</strong><br />

<strong>10</strong> <strong>March</strong> 2011<br />

CAPT Craig Fulton, USN, PE<br />

MCIEAST AC/S IFE<br />

1


MCIEAST<br />

Camp Lejeune<br />

MCAF Quantico<br />

MCAS Cherry Point<br />

MCAS New River<br />

MCB Camp Lejeune<br />

MCAS Beaufort<br />

MCLB Albany<br />

MCSF Blount Isl<strong>and</strong><br />

MCIEAST <strong>Installation</strong>s<br />

• 36+ Million square feet of<br />

facilities<br />

• 172 Thous<strong>and</strong> acres<br />

• $12.6 Billion PRV<br />

– $126 Million Local (M1/R1)<br />

FSRM<br />

– $2<strong>10</strong>+ Million M2/R2 FSRM<br />

• 8000+ homes<br />

• 231 BQs<br />

• 11 Threatened <strong>and</strong><br />

Endangered Species<br />

2


• NEPA<br />

• Billeting Progress<br />

Agenda<br />

• Major Initiatives @ MCB Camp Lejeune<br />

• MILCON Summary <strong>and</strong> Outlook<br />

• <strong>Facilities</strong> Sustainment Restoration<br />

Modernization (FSRM)<br />

• Energy<br />

• Summary<br />

3


NEPA<br />

4


NEPA - JSF Siting Alternatives<br />

• Record of Decision (ROD) for F-35B JSF East Coast Basing<br />

EIS was signed by PDASN (EI&E) on 9 December 20<strong>10</strong>.<br />

– Clears the way for ~ $1B of construction at Cherry Point <strong>and</strong> Beaufort;<br />

$46M of which is the FY11 PTC facility at Beaufort.<br />

Alternative MCAS Beaufort MCAS Cherry Point<br />

1 3 squadrons + PTC 8 squadrons<br />

2 PTC 11 squadrons<br />

3 8 squadrons 3 squadrons + PTC<br />

4 11 squadrons PTC<br />

5 2 squadrons + PTC 9 squadrons<br />

No action<br />

(Required by law)<br />

Status Quo Status Quo<br />

PTC = Pilot Training Center (2 squadrons -- 20 aircraft/squadron)<br />

5


Bachelor Quarters Evolution<br />

6


• Board convened twice during 20<strong>10</strong>:<br />

– Inaugural Board meeting held 23-24 Feb <strong>10</strong> @ Pendleton<br />

– Follow up Board meeting held 20-21 July <strong>10</strong> @ Lejeune<br />

– Next Board meets 22-23 <strong>March</strong> 11 @ Cherry Pt<br />

• Major Decisions<br />

HQMC BEQ<br />

<strong>Facilities</strong> Oversight Board<br />

– Increase building footprint planning factor from 47sqmt to 48sqmt per room<br />

module<br />

– Use planning factor of 6.25sqft (min.) to 12.5sqft (max.) per occupant for<br />

common support space<br />

– Revise planning factor for laundry rooms base on number of occupants (vice<br />

720sqft max per BEQ)<br />

– Update Interior Finish Schedule to allow higher quality finishes / furniture<br />

– Use of magnetic key card system with hard key override required for BEQ room<br />

entry.<br />

Changes formalized Unified <strong>Facilities</strong> Criteria, change 4, dated Jan 2011<br />

7


Rendering of typical BEQ at<br />

Camp Lejeune<br />

Site constraints<br />

influence # stories<br />

8


9<br />

Wallace Creek Phase II BEQ<br />

Redesign Concept<br />

Will meet USMC BEQ “Best of Breed” criteria


<strong>10</strong><br />

Wallace Creek Phase II BEQ Lounge<br />

Lounge <strong>and</strong> BEQs<br />

Rear Lounge<br />

7,700 SF community style lounge area


Major Initiatives<br />

11


Major Initiatives @ MCBCL<br />

12


Summary – Major Movements<br />

Movement Required How this supports GTF<br />

8 th Marine Reg. to Wallace Creek South Allows 2 nd & 6 th Mar. Reg’s to spread<br />

footprint in <strong>10</strong>0-400 Areas <strong>and</strong> beddown new<br />

infantry battalions within existing facilities.<br />

2d CEB to Courthouse Bay Area Moves heavy equipment intense unit closer to<br />

training area. Allows new Arty Btrys <strong>and</strong><br />

Counter Btry to backfill facilities left by CEB.<br />

Co-locates all <strong>10</strong> th Marine units in 1800 Area.<br />

MHG units (8th Comm Bn, Radio Bn <strong>and</strong><br />

ANGLICO) currently in French Creek to<br />

Wallace Creek North<br />

All other MHG units (Intel Bn, MP’s <strong>and</strong><br />

MHG Hqtrs) to Wallace Creek North<br />

French Creek area facilities vacated by MHG<br />

unit allow 2D MLG to accept GTF increases<br />

with minimal MILCON. Allows redistribution<br />

of facilities to support new MLG organization<br />

<strong>and</strong> GTF T/0-T/E increases.<br />

Establishes an MHG area. Co-locates all<br />

MHG units. Improves C2 <strong>and</strong> promotes<br />

operational efficiencies.<br />

13


Movement to Wallace Creek South<br />

14


PHASE I (FY07/08 MILCON $199M):<br />

Construction Award: 15 Sept 2008<br />

Construction Completion: 14 Sept 2011<br />

6 BEQs = 656 rooms<br />

2x Bn/ Co Hqtrs = 85,900sf<br />

Motor T Maint. = 11,280sf<br />

Elec/Comm Maint. = 14,150sf<br />

Armory = 15,600sf<br />

Supply = 31,5<strong>10</strong>sf<br />

Mess Hall = 26,005 sf<br />

PHASE II (FY<strong>10</strong> MILCON $145M):<br />

Construction Award: 24 Feb 20<strong>10</strong><br />

Construction Completion: 27 Oct 2012<br />

7 BEQs = 938 rooms<br />

2x Bn/ Co Hqtrs = 85,528sf<br />

Motor T Maint. = 11,373sf<br />

Elec/Comm Maint. = 14,033sf<br />

Armory = 17,628sf<br />

Supply = 32,<strong>10</strong>0sf<br />

PHASE III (FY12/13 MILCON $120M):<br />

3 BEQs = 600 rooms<br />

Regimental Hqtrs/Ops & Maint. 75,347sf<br />

Wallace Creek Regimental<br />

Area Master Plan<br />

15


Wallace Creek<br />

South-Regimental<br />

Area<br />

Wallace Creek North<br />

MHG Master Plan<br />

Proposed MHG<br />

Development<br />

• Intel Battalion (FY11)<br />

•Radio Battalion<br />

• ANGLICO (FY11)<br />

• 8th Comm<br />

• MHG MPs<br />

• II MHG HQ<br />

• BEQs (FY11, 402 rooms)<br />

16


MARSOC COMPLEX<br />

• FY07/FY08 MILCON--13 projects at ~$259M<br />

• Headquarters building complete<br />

• Remaining facilities: By Dec <strong>10</strong><br />

• MCB, working with MARSOC, in process of<br />

identifying out-year SOCOM MILCON requirements<br />

17


Construction Summary<br />

$3.53 Billion FY 08-12<br />

$2,000,000 – construction per day<br />

18


Millions of Dollars<br />

MILCON Funding History<br />

USMC MILCON Average<br />

Pre-2007~ $250M<br />

749<br />

USMC <strong>and</strong> MCIEAST<br />

1<strong>10</strong>9<br />

521 512<br />

1980<br />

690<br />

2634<br />

827<br />

FY07 FY08 FY09 FY<strong>10</strong> FY11 FY12<br />

Fiscal Year<br />

2733<br />

<strong>10</strong>59<br />

1429<br />

354<br />

USMC<br />

MCIEAST<br />

Requirements<br />

$1900 M<br />

19


MCIEAST<br />

FY11 MILCON PROGRAM<br />

Program Year Station Project Number Project Title Cost Current Status<br />

2011 MCAS BEAUFORT P-420 Physical Fitness Center 15,430 Authorized for Design<br />

2011 MCAS BEAUFORT P-433 AICUZ L<strong>and</strong> Acquisition 21,190 Authorized for Design<br />

2011 MCAS BEAUFORT P-444 Training <strong>and</strong> Simulator Facility 46,240 Authorized for Design<br />

2011 MCAS BEAUFORT P-454 Aircraft Hangar - VMFAT-502 46,550 Authorized for Design<br />

2011 MCAS CHERRY POINT P-136 BEQ 42,500 Authorized for Design<br />

2011 MCAS CHERRY POINT P-148 Missile Magazine 13,420 Authorized for Design<br />

2011 MCAS CHERRY POINT P-164 Mariners Bay L<strong>and</strong> Acquisition - Bogue 3,790 Authorized for Design<br />

2011 MCAS CHERRY POINT P-176 Station Infrastructure Upgrades 5,800 Authorized for Design<br />

2011 MCAS NEW RIVER P-683 Hangar 73,0<strong>10</strong> Authorized for Design<br />

2011 MCAS NEW RIVER P-687 MV-22 Maint Hangar (HMLA) 74,260 Authorized for Design<br />

2011 MCB CAMP LEJEUNE P-004 Motor Transportation/Comm. Maint. Fac. 18,470 Authorized for Design<br />

2011 MCB CAMP LEJEUNE P-<strong>10</strong>34 2nd Intel Bn Maintenance/Ops Complex 90,270 Authorized for Design<br />

2011 MCB CAMP LEJEUNE P-1240 Maintenance/Ops Complex - 2nd ANGLICO 36,<strong>10</strong>0 Authorized for Design<br />

2011 MCB CAMP LEJEUNE P-1246 EOD Addn - 2nd Marine Logistics Group 7,420 Authorized for Design<br />

2011 MCB CAMP LEJEUNE P-1249 BEQ - Wallace Creek North 46,290 Authorized for Design<br />

2011 MCB CAMP LEJEUNE P-1251 BEQ - Courthouse Bay 42,330 Authorized for Design<br />

2011 MCB CAMP LEJEUNE P-1254 BEQ - Courthouse Bay 40,780 Authorized for Design<br />

2011 MCB CAMP LEJEUNE P-1256 Mess Hall Addition - Courthouse Bay 2,553 Authorized for Design<br />

2011 MCB CAMP LEJEUNE P-1264 Utility Expansion - Hadnot Point 56,470 Authorized for Design<br />

2011 MCB CAMP LEJEUNE P-1265 Utility Expansion - French Creek 56,050 Authorized for Design<br />

2011 MCB CAMP LEJEUNE P-1267 Mess Hall - French Creek 25,960 Authorized for Design<br />

2011 MCB CAMP LEJEUNE P-1286 BEQ - Rifle Range 55,350 Authorized for Design<br />

2011 MCB CAMP LEJEUNE P-1317 BEQ - French Creek 43,640 Authorized for Design<br />

2011 MCB CAMP LEJEUNE P-1319 BEQ - Camp Johnson 46,550 Authorized for Design<br />

2011 MCB CAMP LEJEUNE P-1322 BEQ - Wallace Creek 51,660 Authorized for Design<br />

2011 MCB CAMP LEJEUNE P-1323 Armory - II MEF - Wallace Creek 12,280 Authorized for Design<br />

2011 MCB CAMP LEJEUNE P-1400 Marine Corps Energy Initiative 9,950 Authorized for Design<br />

2011 MCSF BLOUNT ISLAND P-005 Paint <strong>and</strong> Blast Facility 18,840 Authorized for Design<br />

2011 MCSF BLOUNT ISLAND P-012 Container Staging/Loading Lot 5,990 Authorized for Design<br />

2011 MCSF BLOUNT ISLAND P-017 Hardst<strong>and</strong> Extension 17,930 Authorized for Design<br />

2011 MCSF BLOUNT ISLAND P-022 Consolidated Warehouse Facility 17,260 Authorized for Design<br />

2011 MCSF BLOUNT ISLAND P-023 Washrack Expansion 9,690 Authorized for Design<br />

2011 MCSF BLOUNT ISLAND P-024 Container Storage Lot 4,9<strong>10</strong> Authorized for Design<br />

FY11 MCIEAST TOTAL: 1,058,933<br />

20


21<br />

P No. Project Name Location<br />

Projected<br />

Amount<br />

($M)<br />

Acquisition<br />

Tool<br />

Delivery<br />

Method<br />

Projected<br />

Award Date<br />

1266 Utility Expansion - Courthouse Bay MCB CAMP LEJEUNE NC $29 MAC – LPTA DBB 3Q11<br />

1187B Stone Bay Exchange MCB CAMP LEJEUNE NC $2 MAC – 8A DBB 3Q11<br />

032 Infantry Platoon Battle Course SR-1 MCB CAMP LEJEUNE NC $18 LPTA DBB 3Q11<br />

1269B Verona Loop & K Ranges Waterline MCB CAMP LEJEUNE NC $<strong>10</strong> MAC – Gen DBB 4Q11<br />

1268B Camp Geiger Access Upgrades MCB CAMP LEJEUNE NC $5 MAC – Gen DBB 1Q12<br />

311 Parallel Taxiway<br />

688 Apron Expansion (Phase 2)<br />

OICC Upcoming MILCON<br />

Projects Acquisition Tools & Milestones<br />

MCAS NEW RIVER NC $44 BVSS DBB 3Q11<br />

Total $1<strong>10</strong>M


P1311: Consolidated<br />

InfoTech/Telecommunications Complex<br />

Project Data<br />

• Award Date: 31 Mar 11<br />

• Current CCD: 7 Jul 14<br />

• Current Value: ~$46M<br />

Description<br />

•Provides addition Building 24<br />

•Constructs Communications<br />

Administration Facility,<br />

Communication Services Building, <strong>and</strong><br />

Base Telephone Facility/Warehouse<br />

with detached Cable Storage Shelter<br />

•Security features incorporated, to<br />

include indirect traffic patterns,<br />

fencing <strong>and</strong> pedestrian access gate.<br />

•Other site improvements include the<br />

construction of a new PV Canopy<br />

covered parking stalls<br />

22


P032 Infantry Platoon Battle Course<br />

Project Data<br />

• Anticipated Award: 30 Jun 11<br />

• Current CCD: 12 Dec 12<br />

• Current Value: $18,250,000<br />

Description:<br />

• Constructs a range that facilitates infantry platoon<br />

training to current T&R <strong>and</strong> METL st<strong>and</strong>ards.<br />

• 9 firing positions on an eight-lane raised firing line<br />

• 74 stationary infantry targets<br />

• 12 infantry moving targets<br />

• Tactical helicopter l<strong>and</strong>ing zones<br />

• Anti-tank ditch<br />

• Primary facilities for IPBC include: ammo breakdown<br />

building, covered bleacher enclosure, covered mess,<br />

combined facility (to include target storage, office,<br />

classroom, <strong>and</strong> field service head), <strong>and</strong> bivouac area.<br />

23


24<br />

P No. Project Name Location<br />

Projected<br />

Amount<br />

($M)<br />

Acquisition<br />

Tool<br />

Delivery<br />

Method<br />

Projected<br />

Award Date<br />

1267 Mess Hall - French Creek MCB CAMP LEJEUNE NC $26 BVSS DB 2Q11<br />

1256 Mess Hall Addition - Courthouse Bay MCB CAMP LEJEUNE NC $3 MAC – Gen DBB 3Q11<br />

1400 Marine Corps Energy Initiative MCB CAMP LEJEUNE NC $<strong>10</strong> GCC DBB 3Q11<br />

1317 BEQ - French Creek MCB CAMP LEJEUNE NC $44 BVSS DB 3Q11<br />

1319 BEQ - Camp Johnson MCB CAMP LEJEUNE NC $47 BVSS DB 3Q11<br />

004<br />

1246<br />

Motor Transportation/Comm. Maint.<br />

Facility - SOI<br />

EOD Addition - 2nd Marine Logistics<br />

Group<br />

1249 BEQ Wallace Creek North<br />

1322 BEQ - French Creek<br />

OICC FY11 MILCON Projects<br />

Acquisition Tools & Milestones<br />

1323 Armory - II MEF - Wallace Creek<br />

MCB CAMP LEJEUNE NC $18 BVSS DB 3Q11<br />

MCB CAMP LEJEUNE NC $7 MAC – Gen DBB 3Q11<br />

MCB CAMP LEJEUNE NC $1<strong>10</strong> BVSS DB 3Q11


25<br />

P No. Project Name Location<br />

<strong>10</strong>34 2nd Intel Bn Operations Complex<br />

1240<br />

Maintenance/Ops Complex - 2nd<br />

ANGLICO<br />

1251 BEQ - Courthouse Bay<br />

1254 BEQ - Courthouse Bay<br />

Projected<br />

Amount<br />

($M)<br />

Acquisition<br />

Tool<br />

Delivery<br />

Method<br />

Projected<br />

Award Date<br />

MCB CAMP LEJEUNE NC $126 BVSS DB 3Q11<br />

MCB CAMP LEJEUNE NC $83 BVSS DB 4Q11<br />

1264 Utility Expansion - Hadnot Point MCB CAMP LEJEUNE NC $57 LPTA DBB 4Q11<br />

1265 Utility Expansion - French Creek MCB CAMP LEJEUNE NC $56 LPTA DBB 4Q11<br />

1286 BEQ - Rifle Range<br />

1286B Connector Road to P1286<br />

683 Hangar<br />

OICC FY11 MILCON Projects<br />

Acquisition Tools & Milestones<br />

687 Maint Hangar (HMLA/MV-22)<br />

MCB CAMP LEJEUNE NC $64 BVSS DB 4Q11<br />

MCAS NEW RIVER NC $147 BVSS DB 3Q11<br />

OICC FY11 Total $798M


MCB Camp Lejeune – BEQ Construction Plan<br />

Camp Geiger Area:<br />

Unprogrammed by HQMC: 2 Open Bay<br />

Student Barracks <strong>and</strong> 1 BEQ<br />

Stone Bay Area:<br />

Funded: 3 BEQs<br />

Authorized FY11: 2 BEQs<br />

Unprogrammed by HQMC: 2 BEQs<br />

Camp Johnson Area:<br />

Funded: 3 BEQs<br />

Authorized FY11: 2 BEQs<br />

Unprogrammed by HQMC: 2 BEQs<br />

Division <strong>10</strong>0 Area:<br />

Funded: 3 BEQs<br />

� 3,258 rooms in various phases of construction (FY07-<strong>10</strong>)<br />

� 1,531 additional rooms authorized for design (FY11-12)<br />

Wallace Ck “Regimental” Area:<br />

Funded: 13 BEQs<br />

Unprogrammed by HQMC: 3 BEQ’s<br />

Wallace Ck “MHG” Area:<br />

Authorized FY11: 3 BEQs<br />

Authorized FY12: 1 BEQ<br />

Unprogrammed by HQMC: 3 BEQs<br />

French Ck “MLG” Area:<br />

Funded: 3 BEQs<br />

Authorized FY11: 2 BEQs<br />

Courthouse Bay Area:<br />

Funded: 2 BEQs<br />

Authorized FY11: 4 BEQs<br />

Unprogrammed by HQMC: 3 BEQs<br />

� 1,574 additional rooms submitted by MCBCL, but unprogrammed<br />

26


1. FY09 BEQs with extension of Birch<br />

Street <strong>and</strong> road construction from<br />

Sneads Ferry Road to BEQ site<br />

2. FY11 BEQs <strong>and</strong> Mess Hall<br />

3. FY11 Road extension that will<br />

connect Sneads Ferry Rd to McHugh<br />

Blvd<br />

BEQs at French Creek<br />

3<br />

2<br />

1<br />

27


28<br />

FY12 MILCON Projects (NC)<br />

P No. Project Name Location<br />

Projected<br />

Amount ($M)<br />

030 Auto Infantry Squad Battle Course MCB CAMP LEJEUNE NC $17<br />

138 BEQ - Wallace Creek MCB CAMP LEJEUNE NC $27<br />

1253 2D CEB Maintenance/Ops Complex MCB CAMP LEJEUNE NC $75<br />

1383 New Base Entry Point & Road, Phase II MCB CAMP LEJEUNE NC $80<br />

705 Aircraft Maintenance Hanger/Apron/Classrooms MCAS NEW RIVER NC $69<br />

7<strong>10</strong> CALA Addition MCAS NEW RIVER NC $9<br />

991 H-1 Y/Z Gearbox Repair & Test Facility MCAS CHERRY POINT NC $18<br />

Total $277M<br />

Pre-decisional – Pending Congressional Budget Approval


New Base Entry Road<br />

• Phase 1, Connects Tarawa Terrace to Brewster Blvd: FY<strong>10</strong><br />

• Phase 2, Constructs NC HWY 24 intersection <strong>and</strong> interior roadway: FY12<br />

• Phase 3, Constructs interior roadway completing new entry road: FY13<br />

29


Marine Mart -<br />

Courthouse Bay<br />

Hwy 172<br />

MCX, MCB, Camp<br />

Lejeune<br />

Renovation/Addition<br />

Exchanges & Marine Marts<br />

New Marine Marts:<br />

• Courthouse Bay/Hwy 172<br />

• Onslow Beach<br />

• Wallace Creek<br />

Renovations/Additions:<br />

• MCX, MCBCL<br />

• C Store – French Creek, MCBCL<br />

• MCX, MCASNR<br />

30


31<br />

MCB Camp Lejeune FSRM Program<br />

FY11 FSRM Projection: $70M +<br />

Types of Work:<br />

Barracks Renovations<br />

FY<strong>10</strong> FSRM $90M<br />

Mechanical/HVAC Replacements<br />

Roof Repairs/Replacements<br />

Utility System Upgrades<br />

Demolition<br />

Fire Protection System<br />

Energy Improvements<br />

“Advertised <strong>and</strong>/or<br />

Awarded in FY<strong>10</strong>”


MCIEAST<br />

<strong>Installation</strong><br />

HQMC FSRM (M2R2) Funding<br />

Plant<br />

Replacement<br />

Value (million)<br />

Backlog of M2R2<br />

Maintenance Projects<br />

(million)<br />

M2R2 Projects<br />

Approved for<br />

Funding "as of<br />

today" in FY11<br />

M2R2 Projects<br />

Approved for<br />

Funding in<br />

FY<strong>10</strong><br />

M2R2 Projects<br />

Approved for<br />

Funding in<br />

FY09<br />

M2R2 Projects<br />

Approved for<br />

Funding in<br />

FY08<br />

Albany $1,043 $9.8 $5.5 $8.3 $16.9 $5.7<br />

Beaufort $1,451 $45.6 $5.4 $13.8 $20.9 $26.8<br />

Cherry Point $2,956 $89.9 $13.9 $44.3 $26.9 $32.9<br />

Lejeune $6,725 $250.1 $23.1 $59.5 $79.4 $77.4<br />

New River $24.1 $6.4 $14.5 $7.9 $9.6<br />

Blount Isl<strong>and</strong> $248 $21.4 $7.3 $12.9 $7.3 $20.2<br />

MCAF Quantico $229 $8.1 $1.0 $0.2 $0.3<br />

Totals $12,652 $449.0 $61.6 $154.3 $159.5 $172.9<br />

• Backlog represents approved M2R2 projects submitted to<br />

HQMC but not yet funded<br />

– <strong>Installation</strong>s submit priorities to HQMC twice each year via a process<br />

called the Contract Advertisement Forecast (CAF)<br />

– FY08 <strong>and</strong> FY09 were larger than normal due to supplemental funding<br />

– Typical M2R2 year is more like $<strong>10</strong>0 million for MCIEAST<br />

– FY11 does not include straddle


Local FSRM (M1R1) Funding<br />

• Driven by OSD FSRM model – Steady Funding<br />

FY08 Ceiling FY08 with FY09 Ceiling FY09 with Plus- FY<strong>10</strong> Ceiling FY<strong>10</strong> with<br />

Tracks Plus-ups Tracks ups Tracks Plus-ups FY11 Budget<br />

Albany $6,330,000 $8,179,000 $7,134,000 $9,355,919 $7,314,000 $7,589,000 $8,244,000<br />

Beaufort $7,361,000 $8,742,000 $8,314,000 $<strong>10</strong>,265,921 $8,487,000 $8,862,000 $8,770,000<br />

Blount Isl<strong>and</strong> (1) $4,295,000 $4,400,000 $4,871,000 $5,371,000 $4,915,000 $5,223,000 $4,826,000<br />

Cherry Point $16,451,000 $20,115,000 $18,587,000 $25,367,927 $18,958,000 $19,719,000 $18,651,000<br />

Lejeune/New River $43,623,000 $53,950,000 $52,611,000 $74,322,404 $56,672,000 $59,827,000 $57,325,000<br />

MCAF Quantico (1) $1,631,000 $1,941,000 $1,852,000 $2,052,000 $1,892 $1,992,000 $1,871,000<br />

Total $79,691,000 $97,327,000 $93,369,000 $126,735,171 $96,347,892 $<strong>10</strong>3,212,000 $99,687,000<br />

Note (1): MCAF Quantico <strong>and</strong> Blount Isl<strong>and</strong> are small <strong>and</strong> not funded per the FSRM model.


Planned MCCS Maintenance Repair<br />

MCCS Project Title Estimate<br />

Renovate Marine & Family Services Fac, Bldg 799 $750,000<br />

Improve Marine & Family Services Fac, Bldg 799 $500,000<br />

Replace HVAC Goettge Field House, Bldg 751 $90,000<br />

Install A/C Goettge Field House, Bldg 751 $250,000<br />

Construct Youth Ball Fields, Stone Street $600,000<br />

Exp<strong>and</strong> Youth Sports Office, Bldg 1985 $400,000<br />

Remodel Youth Sports Office, Bldg 1985 $500,000<br />

Repair Fitness Center, Bldg FC332 $1,400,000<br />

Improve Community CTR Complex, Bldg LCH4014 $550,000<br />

Repair Community CTR Complex, Bldg LCH4014A $500,000<br />

Repair Area #4 GYM, Bldg 401 $1,550,000<br />

Replace HID Lighting Goettge Field House, Bldg 751 $70,000


35<br />

Active<br />

MACCS<br />

Award Date<br />

MACC Status<br />

Existing<br />

Option<br />

Expiration<br />

Date<br />

Maximum<br />

Amount<br />

Remaining Capacity<br />

Civil/Paving 09/01/2009 Base Year 08/31/20<strong>10</strong> $90M/Life $71.2M (for life of contract)<br />

HubZone 01/13/2009 3 rd Option 09/03/20<strong>10</strong> $20M/yr. $4.4M (for option period)<br />

Roof 09/07/2005 4 th (last) * 09/06/20<strong>10</strong> $30M/yr. $28.0M<br />

Gen. Mini 01/13/2009 1 st Option 01/12/2011 $20M/yr. $13.0M (for option period)<br />

SDVOSB 02/05/2009 1 st Option 02/04/2011 $20M/yr. $16.7M (for option period)<br />

Mechanical 04/28/2009 1 st Option 04/27/2011 $300M/Life $225.2M (for life of contract)<br />

Painting 05/11/20<strong>10</strong> Base Year 05/<strong>10</strong>/2011 $<strong>10</strong>0M/Life $98.6M (for life of contract)<br />

* Resolicitation underway


36<br />

Midlant A/E Contracts<br />

• Indefinite Delivery Indefinite Quantity (IDIQ)<br />

Active Contracts Firm<br />

Award<br />

Date<br />

Value Engineering <strong>and</strong> Cost Estimating Downey <strong>and</strong> Scott 03/01/2009 $5M/Life<br />

Maximum<br />

Amount<br />

Architectural Design <strong>and</strong> Engineering Services HBA 02/18/20<strong>10</strong> $15M/Life<br />

Architectural Design <strong>and</strong> Engineering Services AECOM 02/22/20<strong>10</strong> $15M/Life<br />

Civil Design <strong>and</strong> Engineering Services Richard Catlin 03/09/20<strong>10</strong> $7.5M/Life<br />

Civil Design <strong>and</strong> Engineering Services C. Allan Bamforth, Jr. 06/24/20<strong>10</strong> $7.5M/Life<br />

Utilities Engineering Services AECOM 03/18/20<strong>10</strong> $30M/Life


Energy Challenges<br />

37


Economic/Practical Challenges<br />

Intensity Goal<br />

• Steam decentralization is key to our “intensity” success,<br />

BUT…<br />

– As we decentralize, we lose opportunities for renewable projects<br />

• It will be difficult to meet both “intensity” <strong>and</strong> “renewable” goals<br />

– It will be expensive. Requires new distributed natural gas system <strong>and</strong><br />

new heating systems in every building<br />

– Estimated regional cost is $250 million<br />

• Existing buildings need to be more efficient<br />

– Several hundred buildings need renovation <strong>and</strong> envelope improvements<br />

– Replace chillers <strong>and</strong> HVAC systems<br />

– Building lighting retrofits <strong>and</strong> occupancy sensors<br />

– Building recommissioning<br />

– Dem<strong>and</strong> reduction by occupants<br />

38


Economic/Practical Challenges<br />

Renewable Goal<br />

• Convert methane gas to energy<br />

– Albany L<strong>and</strong>fill project will contribute ~22%(x2) towards their goal<br />

• Solar hot water<br />

– Best ROI. Prescribed for new barracks…but will only contribute a<br />

couple of percent towards renewable goal<br />

• Solar Photovoltaic<br />

– Expensive ~$8 million per MW<br />

– 1MW only contributes 0.2% towards goal<br />

• Wind energy limited by operational considerations<br />

• Biomass opportunities at odds with decentralization of steam<br />

39


Energy Way Forward<br />

• FY11 focus at your installation<br />

– Complete remaining electrical meters<br />

– Conduct necessary energy audits<br />

– Make sure you have adequate contracting tools via your<br />

NAVFAC FEC<br />

– Prepare for record setting EIP program in FY12<br />

• FY12 execution of energy projects will be critical<br />

– More than $200 million in EIP for the USMC in FY12<br />

– Your energy managers should be designing projects THIS<br />

YEAR to prepare for FY12 execution<br />

• Design funds available “now” from HQMC for FY12 projects<br />

– Year end straddle program for energy projects that can be<br />

executed in FY11<br />

40


41<br />

Summary


42<br />

How do I get this work?<br />

• To be a Prime Contractor<br />

– Register in the Central Contractor Registration (CCR)<br />

– Obtain a Duns & Bradstreet Number (DUNS)<br />

• To Subcontract<br />

– Contact any of the following (Names & POCs listed in h<strong>and</strong>out)<br />

• Multiple Award Construction (MAC) Contractor<br />

• Base Operating Support Contract (BOSC)<br />

• Housing Privatization Contractor<br />

– Meet the minimum requirements to gain access the base


• Solicitation & Award Venues:<br />

43<br />

How do I find this work?<br />

– Federal Business Opportunities (FedBizOpps) address –<br />

https://www.fbo.gov<br />

– Navy Electronic Commerce Online (NECO) address –<br />

https://www.neco.navy.mil<br />

– POC: Sharon Taylor, Supervisory Contract Specialist NC<br />

IPT, (757) 322-8258<br />

– POC: Jerry Williams, Acquisition Director, OICC MCI East,<br />

Camp Lejeune, (9<strong>10</strong>) 451-2581 X5236


Questions<br />

44