Regional<br />

Installation Facilities and Environment<br />

Overview<br />

8 March 2012<br />

<strong>CAPT</strong> <strong>Craig</strong> <strong>Fulton</strong>, <strong>USN</strong>, <strong>PE</strong><br />

MCIEAST AC/S IFE<br />

1


Single Commander for All<br />

Installations Functions &<br />

Funding<br />

Marine Corps Installations<br />

Command<br />

IOC: 1 Oct 2011<br />

FOC: 1 Oct 2012<br />

Command of Marine Corps Installations East, West, and Pacific<br />

2


Double-Hatted as<br />

Base and Region<br />

MCICOM Command Relationships<br />

MajGen Kessler serves as<br />

HQMC LF, COMMCICOM<br />

and COMMCNCR<br />

Functional & Financial<br />

oversight of Training Bases<br />

3


16<br />

S<strong>PE</strong>CIAL STAFF<br />

MCICOM<br />

Organizational Structure<br />

ADC LF / MCICOM /<br />

MCNCRC<br />

G1 15 G3/5/7 25 27 10 25 50<br />

G4<br />

G6<br />

G8<br />

GF<br />

<strong>PE</strong>RSONNEL / OPS/PLANS/<br />

LOGISTICS INFO SYS RESOURCES FACILITIES<br />

SUPPORT ASSESSMENTS<br />

• “Combined” HQ Organization is Lean<br />

– Many vacant billets still subject to hiring freeze<br />

• Similar Structure for MCICOM, East, West and Pacific<br />

– Possible path to improved standardization across installations<br />

• Most Facilities Functions in a Single Directorate<br />

– Improved coordination and collaboration<br />

Total HQ Structure – 169<br />

4


Marine Corps Installations Command<br />

GF / Facilities Directorate<br />

MCICOM “GF” Coding<br />

• GF-1: Facility Operations and Energy<br />

• GF-2: FSRM<br />

• GF-3: Housing Management<br />

• GF-4: Military Construction<br />

• GF-5: Environmental Management<br />

• GF-6: Real Estate / Asset Utilization<br />

• GF-7: Fac Planning / Conservation<br />

5


MCIEAST / MCB<br />

Camp Lejeune<br />

MCAF Quantico<br />

MCAS Cherry Point<br />

MCAS New River<br />

MCB Camp Lejeune<br />

MCAS Beaufort<br />

MCLB Albany<br />

MCSF Blount Island<br />

MCRD Parris Island<br />

(Functional & Financial oversight)<br />

MCIEAST Installations<br />

• 36+ Million square feet of<br />

facilities<br />

• 172 Thousand acres<br />

• $12.6 Billion PRV<br />

– $126 Million Local (M1/R1)<br />

FSRM<br />

– $210+ Million M2/R2 FSRM<br />

• 8000+ homes<br />

• 231 BQs<br />

• 11 Threatened and<br />

Endangered Species<br />

6


Construction Summary<br />

$3.53 Billion FY 08-12<br />

$2,000,000 – construction per day<br />

7


Key Installations Funding<br />

8


9<br />

Grow-the-Force / BEQ Construction<br />

Awarded $2.5B & 25,000 Spaces since FY08<br />

Stewardship is key for the Future;<br />

We need to preserve facilities for<br />

the next generation of Marines


Energy is a Strategic Imperative<br />

• Unprecedented Funding<br />

– $200M+ in FY12<br />

– Over $100M in FY13 & 14<br />

• Cost Effectiveness in Question<br />

• Meters & Info Management<br />

• Smart Grids & Security<br />

1


Millions of Dollars<br />

MILCON Funding History<br />

USMC MILCON Average<br />

Pre-2007~ $250M<br />

USMC and MCIEAST<br />

Fiscal Year<br />

11


Millions of Dollars<br />

MILCON Funding History<br />

USMC MILCON Average<br />

Pre-2007~ $250M<br />

521 512<br />

436<br />

483<br />

MCIEAST and NC<br />

690<br />

605<br />

827<br />

814<br />

1059<br />

FY07 FY08 FY09 FY10 FY11 FY12 FY13 FY14<br />

Fiscal Year<br />

855<br />

361<br />

304<br />

294<br />

203<br />

273<br />

123<br />

MCIEAST<br />

NC Installations


FY12 MILCON Projects (NC)<br />

Program Year Station Project Number Project Title Cost<br />

2012 MCAS CHERRY POINT P991 H-1 Y/Z Gearbox Repair & Test Facility 17,760<br />

2012 MCAS NEW RIVER P705 Aircraft Maintenance Hangar and Apron 69,511<br />

2012 MCAS NEW RIVER P710 Ordnance Loading Area Addition 9,419<br />

2012 MCB CAMP LEJEUNE P030 Squad Battle Course 16,821<br />

2012 MCB CAMP LEJEUNE P1253 2n Combat Engineer Maint/Ops Complex 75,214<br />

2012 MCB CAMP LEJEUNE P138 BEQ - Wallace Creek 27,439<br />

2012 MCB CAMP LEJEUNE P1383 Base Entry Point and Road - Phase 2 81,008<br />

2012 SOCOM MCB CAMP LEJEUNE P-1285 SOF Aromory Facility Expansion 6,700<br />

NC Installations Total FY12 Funding: 303,872<br />

Total $303.8M<br />

13


New Base Entry Road<br />

• Phase 1, Connects Tarawa Terrace to Brewster Blvd: FY10<br />

• Phase 2, Constructs NC HWY 24 intersection and interior roadway: FY12<br />

• Phase 3, Constructs interior roadway completing new entry road: FY13<br />

14


MCIEAST FY13 MILCON<br />

Program Year Station Project Number Project Title Cost<br />

2013 MCAS BEAUFORT P465 F-35B Aircraft Hangar - VMFA 48,527<br />

2013 MCAS BEAUFORT P459 Recycling/Hazwaste Facility 4,566<br />

2013 MCAS BEAUFORT P456 Simulated LHD Deck F-35B 13,176<br />

2013 MCAS BEAUFORT P472 Airfield Security Upgrades 13,981<br />

2013 MCAS BEAUFORT P427 Ground Support Equip. Shop 11,068<br />

2013 MCAS CHERRY POINT P163 Marine Air Support Squadron Compound 45,910<br />

2013 MCAS CHERRY POINT P601 Armory 14,356<br />

2013 MCAS NEW RIVER P711 Personnel Administration Center 9,860<br />

2013 MCB CAMP lEJEUNE P1384 New Base Entry Point and Road Ph3 41,821<br />

2013 MCB CAMP lEJEUNE P003 Staff NCO Academy Facilities 30,000<br />

2013 SOCOM MCB CAMP lEJEUNE P1218 SOF MSOB-Company/Team Facilities 52,663<br />

2013 SOCOM MCB CAMP lEJEUNE P1393 SOF SERE Training Facilities 5,389<br />

2013 (UMC) MCB CAMP lEJEUNE P1425 Overhead Range Baffle System Construction 2,900<br />

FY13 MCIEAST TOTAL: 294,217<br />

NC Total $203M<br />

Pre-decisional – Pending Congressional Budget Approval<br />

15


Planned MCCS Maintenance Repair<br />

MCCS Project Title Estimate<br />

Temporary Lodging Facility Addition<br />

(awarded)<br />

$11,090,000<br />

New Marine Mart, Onslow Beach<br />

(awarded)<br />

$ 1,172,000<br />

Marine Mart Addition/Renovation, French<br />

Creek $ 3,205,000<br />

Marine Mart Addition/Renovation, Gonzales<br />

Blvd $ 2,187,000<br />

New Marine Mart, Wallace<br />

Creek $ 6,941,000<br />

Temporary Lodging Facility<br />

Renovation $ 7,861,000<br />

Renovate Field House 751 ** $ 2,239,000<br />

New Marine Mart, Knox Area<br />

(FY14) $ 4,675,000<br />

New Marine Mart, Naval Hospital and Wounded Warrior Area<br />

(FY14) $ 3,183,000<br />

** All USACE except Renovate Field House 751


Marine Mart -<br />

Courthouse Bay<br />

Hwy 172<br />

MCX, MCB, Camp<br />

Lejeune<br />

Renovation/Addition<br />

Exchanges & Marine Marts<br />

New Marine Marts:<br />

• Wallace Creek<br />

Renovations/Additions:<br />

• C Store – French Creek, MCBCL<br />

• MCX, MCASNR<br />

17


Facilities Sustainment Restoration and<br />

Types of Work<br />

Modernization (FSRM) Program<br />

All things maintenance and repair<br />

Barracks Renovations<br />

Mechanical/HVAC Replacements<br />

Roof Repairs/Replacements<br />

Utility System Upgrades<br />

Demolition<br />

Fire Protection System<br />

Energy Improvements<br />

Paving<br />

Painting<br />

All new construction less than $750K<br />

18


MCIEAST<br />

Installation<br />

HQMC FSRM (M2R2) Funding<br />

Plant<br />

Replacement<br />

Value (million)<br />

Backlog of M2R2<br />

Maintenance Projects<br />

(million)<br />

M2R2 Projects<br />

Approved for<br />

Funding "as of<br />

today" in FY12<br />

M2R2 Projects<br />

Approved for<br />

Funding "as of<br />

today" in FY11<br />

M2R2 Projects<br />

Approved for<br />

Funding in<br />

FY10<br />

M2R2 Projects<br />

Approved for<br />

Funding in<br />

FY09<br />

Albany $1,043 $9.8 $26.2 $14.3 $8.3 $16.9<br />

Beaufort $1,451 $45.6 $13.3 $7.7 $13.8 $20.9<br />

Cherry Point $2,956 $89.9 $28.9 $33.1 $44.3 $26.9<br />

Lejeune $6,725 $250.1 $73.3 $42.3 $59.5 $79.4<br />

New River $24.1 $9.9 $9.9 $14.5 $7.9<br />

Blount Island $248 $21.4 $5.9 $11.9 $12.9 $7.3<br />

MCAF Quantico $229 $8.1 $1.1 $0.0 $1.0 $0.2<br />

Totals $12,652 $449.0 $158.6 $119.2 $154.3 $159.5<br />

• Backlog represents approved M2R2 projects submitted to<br />

HQMC but not yet funded<br />

– Installations submit priorities to HQMC twice each year via a process<br />

called the Contract Advertisement Forecast (CAF)<br />

– FY09 and FY10 were larger than normal due to supplemental funding<br />

– Typical M2R2 year is more like $100 million for MCIEAST<br />

– FY12 includes energy projects ($200 million for Marine Corps)


Local FSRM (M1R1) Funding<br />

• Driven <strong>by</strong> OSD FSRM model – Steady Funding<br />

FY08 Ceiling FY08 with FY09 Ceiling FY09 with Plus- FY10 Ceiling FY10 with<br />

Tracks Plus-ups Tracks ups Tracks Plus-ups FY11<br />

Albany $6,330,000 $8,179,000 $7,134,000 $9,355,919 $7,314,000 $7,589,000 $8,244,000<br />

Beaufort $7,361,000 $8,742,000 $8,314,000 $10,265,921 $8,487,000 $8,862,000 $8,770,000<br />

Blount Island (1) $4,295,000 $4,400,000 $4,871,000 $5,371,000 $4,915,000 $5,223,000 $4,826,000<br />

Cherry Point $16,451,000 $20,115,000 $18,587,000 $25,367,927 $18,958,000 $19,719,000 $18,651,000<br />

Lejeune/New River $43,623,000 $53,950,000 $52,611,000 $74,322,404 $56,672,000 $59,827,000 $57,325,000<br />

MCAF Quantico (1) $1,631,000 $1,941,000 $1,852,000 $2,052,000 $1,892 $1,992,000 $1,871,000<br />

Total $79,691,000 $97,327,000 $93,369,000 $126,735,171 $96,347,892 $103,212,000 $99,687,000<br />

Note (1): MCAF Quantico and Blount Island are small and not funded per the FSRM model.<br />

FY12 is just over $100 million


Overview of Contracting Tools <strong>by</strong><br />

NAVFAC<br />

CDR Marc Delao<br />

21


22<br />

Midlant A/E Contracts<br />

Indefinite Delivery Indefinite Quantity (IDIQ)<br />

Active Contracts Firm Award Date<br />

Maximum<br />

Amount<br />

Value Engineering and Cost Estimating Downey and Scott 03/09 $5M/Life<br />

Architectural Design and Engineering Services HBA 02/10 $15M/Life<br />

Architectural Design and Engineering Services AECOM 02/10 $15M/Life<br />

Civil Design and Engineering Services Richard Catlin 03/10 $7.5M/Life<br />

Utilities Engineering Services AECOM 03/10 $30M/Life<br />

Civil Design and Engineering Services C. Allan Bamforth, Jr. 06/10 $7.5M/Life


23<br />

Active<br />

MACCS<br />

Award Date<br />

MACC Status<br />

Existing<br />

Option<br />

Expiration<br />

Date<br />

Maximum<br />

Amount<br />

Remaining Capacity<br />

Mechanical 04/28/2009 2 nd Option 04/27/2012 $300M/Life $169.5M (for life of contract)<br />

Painting 05/11/2010 1 st Option 05/10/2012 $100M/Life $96.5M (for life of contract)<br />

Civil/Paving 09/01/2009 2 nd Option 08/31/2012 $90M/Life $29.5M (for life of contract)<br />

Roof 09/09/2010 1 st Option 09/08/2012 $100M/Life $94.2M (for life of contract)<br />

General (SB) 09/15/2010 1 st Option 09/14/2012 $450M/Life $357.2M (for life of contract)<br />

HubZone 01/13/2009 4 th Option 09/27/2011 $20M/yr. $1.1M (for option period)<br />

General Mini 01/13/2009 3rd Option 01/12/2013 $20M/yr. $19.0M (for option period)<br />

SDVOSB 02/05/2009 2 nd Option 02/04/2012 $20M/yr. $19.2M (for option period)<br />

8(a) 03/07/2011 Base Year 03/06/2012 $100M/Life $99.2M(for life of contract)<br />

HubZone 08/16/2011 Base Year 08/15/2012 $100M/Life $98.2M (for life of contract)


24<br />

New MACCS Award Date<br />

SDVOSB<br />

(Proposed New)<br />

New MACCs<br />

Maximum<br />

Amount<br />

Status<br />

TBD $100M/yr. Evaluating Current Requirement


25<br />

OICC Local A/E Contracts<br />

Indefinite Delivery Indefinite Quantity (IDIQ)<br />

Active Contracts Firm<br />

Award<br />

Date<br />

Maximum<br />

Amount<br />

Civil AECOM 03/07 $4M LB<br />

Mechanical RMF, Inc. 04/07 $4M LB<br />

Environmental<br />

AH Environmental Consultants,<br />

Inc.<br />

04/07 $4M SDB<br />

Environmental URS Group, Inc. 06/07 $4M LB<br />

Business Type


26<br />

Active Contracts Firm<br />

OICC Local A/E Contracts<br />

Indefinite Delivery Indefinite Quantity (IDIQ)<br />

Award<br />

Date<br />

Maximum<br />

Amount<br />

Planning Government Services 09/07 $3M SDBWO<br />

Mechanical Wiley & Wilson 05/08 $4M LB<br />

Architecture Maune Belangia Faulkenberry 06/08 $4M SB<br />

Architecture Walker Group Architecture Inc. 06/08 $4M SDBWO<br />

Planning HBA/VHB Joint Venture 07/08 $3M LB<br />

Architecture Talley & Smith Architecture Inc. 07/08 $4M SB<br />

Civil Avolis Engineering 03/09 $4M SB<br />

Civil C. Allen Bamforth 06/09 $4M SB<br />

Business Type


27<br />

Active Contracts<br />

Maintenance/Repair Railroad<br />

Trackage<br />

Facilities Maintenance Support<br />

Services<br />

Grounds Maintenance MCAS<br />

NR, Camp Geiger and Johnson<br />

Services Contracts Status – OICC<br />

Award<br />

Date<br />

Existing<br />

Option<br />

Expiration<br />

Date<br />

Award Amount<br />

(Including Options)<br />

Current Contract<br />

Value<br />

09/30/11 N/A 03/31/12 $149,000 $131,500<br />

01/07/10 1 st Option 03/31/12 $187,326,438 $44,679,754<br />

03/20/08 3 rd Option 03/31/12 $4,246,081 $3,812,209<br />

Grounds Maintenance Mainside 03/27/08 3 rd Option 03/31/12 $9,448,548 $8,295,251<br />

Shrub/Flower Bed Maintenance 10/31/07 4 th Option 04/30/12 $3,060,567 $3,592,447<br />

Maintenance & Certification of<br />

Cranes, Basewide<br />

05/01/11 Base 04/30/12 $984,620 $337,804<br />

M&R Screw Pumps, MCBCL 06/01/10 1 st Option 05/31/12 $496,843 $194,276<br />

Wood Grinding and Yard Waste<br />

Grinding and Concrete Crushing<br />

at Landfill<br />

09/21/11 Base 09/20/12 $2,674,110 $405,175


28<br />

Active Contracts<br />

Services Contracts Status – OICC<br />

Award<br />

Date<br />

Existing<br />

Option<br />

Expiration<br />

Date<br />

Award Amount<br />

(Including Options)<br />

Current Contract<br />

Value<br />

Boiler Controls at Building 1700 09/22/11 Base 09/30/12 $241,992 $44,315<br />

EMCS at NH100 09/22/11 Base 09/30/12 $3,969,064 $1,217,453<br />

Pest Control 09/30/11 Base 09/30/12 $394,802 $142,550<br />

Cleaning of Breach/Shoot<br />

Houses<br />

09/30/11 Base 09/30/12 $899,880 $299,960<br />

Multiple Service Contract 09/30/11 Base 09/30/12 $2,793,466 $762,276<br />

Operation of Onslow Beach<br />

Bridge<br />

Custodial, Naval Hospital &<br />

Med/Dental Clinics<br />

09/30/11 N/A 09/30/12 $96,564 $96,564<br />

09/26/08 3 rd Option 09/30/12 $14,588,809 $13,631,590<br />

Bullet Trap Management 01/01/09 3 rd Option 12/03/12 $445,000 $289,383


29<br />

Active Contracts<br />

Veeder Root System Repair &<br />

Maintenance<br />

Grounds Maintenance,<br />

Outlying Roads<br />

Morehead City Port Refuse<br />

Service<br />

Services Contracts Status – OICC<br />

Award<br />

Date<br />

Existing<br />

Option<br />

Expiration<br />

Date<br />

Award Amount<br />

(Including Options)<br />

Current Contract<br />

Value<br />

12/27/07 4 th Option 12/27/12 $408,100 $375,296<br />

06/16/08 3 rd Option 12/31/12 $3,075,907 $3,092,638<br />

01/01/09 3 rd Option 12/31/12 $13,379 $10,542<br />

Custodial Services, Basewide 02/01/10 2 nd Option 01/31/13 $5,276,284 $2,419,978<br />

Outdoor Pool Service Contract 02/01/10 2 nd Option 01/31/13 $85,250 $51,150<br />

Sampling & Analysis of Wells 02/01/11 1 st Option 01/31/13 $628,622 $219,788<br />

Service For Uninterrupted Power 02/19/10 2 nd Option 02/15/13 $251,100 $212,946<br />

Scale Hardware/Software<br />

Support for Landfill<br />

11/04/09 2 nd Option 02/17/13 $35,325 $32,032


How do I get this work?<br />

• To be a Prime Contractor<br />

– Register in the Central Contractor Registration (CCR)<br />

– Obtain a Duns & Bradstreet Number (DUNS)<br />

• To Subcontract<br />

– Contact any of the following (Names & POCs listed in handout)<br />

• Multiple Award Construction (MAC) Contractor<br />

• Base Operating Support Contract (BOSC)<br />

• Housing Privatization Contractor<br />

– Meet the minimum requirements to gain access the base<br />

30


How do I find this work?<br />

• Solicitation & Award Venues:<br />

– Federal Business Opportunities (FedBizOpps) address –<br />

https://www.fbo.gov<br />

– Navy Electronic Commerce Online (NECO) address –<br />

https://www.neco.navy.mil<br />

– POC: Sharon Taylor, Supervisory Contract Specialist NC<br />

IPT, (757) 322-8258<br />

– POC: Jerry Williams, Acquisition Director, OICC MCI East,<br />

Camp Lejeune, (910) 451-2581 X5236<br />

31


Questions<br />

32


Major Initiatives @ MCBCL<br />

33


Summary – Major Movements<br />

Movement Required How this supports GTF<br />

8 th Marine Reg. to Wallace Creek South Allows 2 nd & 6 th Mar. Reg’s to spread<br />

footprint in 100-400 Areas and beddown new<br />

infantry battalions within existing facilities.<br />

2d CEB to Courthouse Bay Area Moves heavy equipment intense unit closer to<br />

training area. Allows new Arty Btrys and<br />

Counter Btry to backfill facilities left <strong>by</strong> CEB.<br />

Co-locates all 10 th Marine units in 1800 Area.<br />

MHG units (8th Comm Bn, Radio Bn and<br />

ANGLICO) currently in French Creek to<br />

Wallace Creek North<br />

All other MHG units (Intel Bn, MP’s and<br />

MHG Hqtrs) to Wallace Creek North<br />

?<br />

?<br />

French Creek area facilities vacated <strong>by</strong> MHG<br />

unit allow 2D MLG to accept GTF increases<br />

with minimal MILCON. Allows redistribution<br />

of facilities to support new MLG organization<br />

and GTF T/0-T/E increases.<br />

Establishes an MHG area. Co-locates all<br />

MHG units. Improves C2 and promotes<br />

operational efficiencies.<br />

34


Movement to Wallace Creek South<br />

35


PHASE I (FY07/08 MILCON $199M):<br />

Construction Award: 15 Sept 2008<br />

Construction Completion: 14 Sept 2011<br />

6 BEQs = 656 rooms<br />

2x Bn/ Co Hqtrs = 85,900sf<br />

Motor T Maint. = 11,280sf<br />

Elec/Comm Maint. = 14,150sf<br />

Armory = 15,600sf<br />

Supply = 31,510sf<br />

Mess Hall = 26,005 sf<br />

PHASE II (FY10 MILCON $145M):<br />

Construction Award: 24 Feb 2010<br />

Construction Completion: 27 Oct 2012<br />

7 BEQs = 938 rooms<br />

2x Bn/ Co Hqtrs = 85,528sf<br />

Motor T Maint. = 11,373sf<br />

Elec/Comm Maint. = 14,033sf<br />

Armory = 17,628sf<br />

Supply = 32,100sf<br />

PHASE III (FY12/13 MILCON $120M):<br />

3 BEQs = 600 rooms<br />

Regimental Hqtrs/Ops & Maint. 75,347sf<br />

Wallace Creek Regimental<br />

Area Master Plan<br />

36


Wallace Creek<br />

South-Regimental<br />

Area<br />

Wallace Creek North<br />

MHG Master Plan<br />

Proposed MHG<br />

Development<br />

• Intel Battalion (FY11)<br />

•Radio Battalion<br />

• ANGLICO (FY11)<br />

• 8th Comm<br />

• MHG MPs<br />

• II MHG HQ<br />

• BEQs (FY11, 402 rooms)<br />

37

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!